Who issues permits
Pima County Development Services Department is the county office listed for building permits in Pima County.
Also listed: Building and Site Development Division; unincorporated county jurisdiction.
How to get a permit in Pima County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the Accela Citizen Access portal at aca-prod.accela.com.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
Published building-permit review goals are 5 business days for residential and commercial projects up to 20,000 square feet, 10 business days for larger projects, 3 days for off-model-plan permits, 1 day for electric reconnect/mechanical/plumbing permits, 3 days for corrected-project rereviews, and 3 days for issued-permit revisions. For site-development instruments, the county strives for 5 business days and guarantees a 15-business-day review timeframe; exceptional complexity or high activity can extend the goals.
Search Pima County permit records
The listing’s online portal is at aca-prod.accela.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Pima County Development Services Department at 520-724-9000. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Pima County Development Services Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Current Pima County materials effective in 2026 identify the 2024 International Building, Residential, Mechanical, Plumbing, Fuel Gas, Property Maintenance, Existing Building, Swimming Pool and Spa, and Wildland-Urban Interface Codes with local amendments; the 2024 International Energy Conservation Code with local amendments applies to permit applications initiated on or after July 1, 2026; and the 2023 National Electrical Code is enforced. The Wildland-Urban Interface Code is limited to Rural Forest Village areas.
Arizona: no statewide code. Details
Work that may not need a permit
Pima County examples of exempt minor work include attic insulation without remodeling; new carpet; nonstructural decks or flat work no more than 30 inches above adjacent grade when not over a basement/story or part of an accessible route; door, window, rain-gutter and like-material reroofing work; painting, tiling, carpeting, cabinets and countertops that do not affect plumbing or electrical; qualifying slabs; non-retaining fences/walls up to 7 feet; qualifying window awnings; portable or like-for-like cooling/heating equipment; limited low-voltage electrical work and like-for-like outlets/fixtures; plumbing leak or stoppage repairs and fixture replacements; qualifying water tanks; movable fixtures/partitions; and playground equipment. Other structural, addition/remodel, new-system, pool, grading, hillside, floodplain, septic, electrical-wiring and utility work may still require permits or separate approvals; the county’s list is illustrative and site conditions can trigger additional requirements.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Schedule routine field or remote inspections through Pima County’s Building Inspection Portal powered by VuSpex; check permit conditions/status in Accela first and keep the site address posted with access directions or gate codes. Schedule before 4:00 p.m. for next-business-day inspections when available. Remote inspections may be used for eligible projects; Ajo/Why/Lukeville are limited to Tuesdays, Arivaca/Sasabe to Wednesdays, and Mt. Lemmon to Thursdays for on-site visits. Custom, weekend, specific-time or same-day requests use 520-419-2355 or 520-235-4600 and may incur an additional charge.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Pima County building-code violations are civil infractions enforceable through the county hearing-officer procedure; penalties may not exceed the maximum allowed by A.R.S. Section 11-815. Required work can also be subject to code-compliance enforcement, legalization permits and inspections, and any applicable abatement or court remedies. The reviewed current county materials did not state a fixed double-fee amount for after-the-fact permits.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Arizona rules that apply in Pima County
These rules come from Arizona law and state agencies, so they apply in Pima County on top of anything the local office requires.
Building code
No statewide code
There is no state-adopted residential or building code that applies to private construction across Arizona. Cities and towns adopt and enforce their own building codes. Under A.R.S. 11-861, a county board of supervisors may adopt a building code and related electrical, plumbing and mechanical codes for the unincorporated areas of the county that it has zoned, using codes published by a national code organization or those adopted by the largest city in the county, and may exempt areas zoned rural or unclassified.
Read more
Counties may not require fire sprinklers in a single-family home or a building with no more than two dwelling units. Code editions therefore vary from place to place; check with the city, town or county building department.
Outside city limits
Outside city and town limits, the county is the permitting authority only where it has adopted zoning and a building code under A.R.S. 11-861. A county may exempt areas zoned rural or unclassified from its building code, so some unincorporated land may have no county building permit requirement.
Read more
County building codes do not apply to farming, ranching and similar agricultural construction, or to irrigation district work (A.R.S. 11-865). Manufactured and mobile home installations are permitted either by the Arizona Department of Housing or by a local agency that has an agreement with it, and septic systems are regulated by the Arizona Department of Environmental Quality or a county agency it has delegated to.
Contractor and trade licensing
Anyone acting as a contractor must hold a license in good standing from the Arizona Registrar of Contractors (ROC), which issues residential, commercial and dual (both) licenses in general and specialty classifications.
Read more
Small jobs are exempt only if the total project price, including labor and materials, is less than $1,000, the work is casual or minor, it does not need a local building permit, it is not part of a larger job split up to avoid the limit, and any advertising says 'not a licensed contractor'. Owner-builder exemption: property owners who build or improve structures on their own property and do the work themselves, with their own employees, or with licensed contractors do not need a license, as long as the structure is for the owner's own occupancy and is not intended for sale or rent. Selling or renting it, or offering it for sale or rent, within one year after completion or the certificate of occupancy is treated as evidence that it was built for sale or rent. Local permit and building code requirements still apply.
Electrical, plumbing and HVAC
Electrical, plumbing, HVAC and other trade work done for others is covered by Registrar of Contractors licensing: these trades are specialty contractor classifications, issued for residential work, commercial work, or both (dual).
Read more
The ROC licenses contracting businesses; the same $1,000 small-job and owner-builder exemptions apply. Permits and inspections for electrical, plumbing and mechanical work on homes come from the city, town or county building department where it has adopted codes.
State programs that can affect your permit
Residential Contractors' Recovery Fund
The ROC administers a recovery fund for homeowners who live in, or intend to live in, a home damaged by a licensed residential contractor's failure to adequately build or improve it. The contractor must have been appropriately licensed when the contract was signed, the first payment was made, or work began. Under the civil recovery process, a payment from the fund cannot exceed $30,000. Work by unlicensed contractors is not covered.
Manufactured homes and factory-built buildings
The Office of Manufactured Housing within the Arizona Department of Housing enforces standards for manufactured homes, mobile homes, factory-built buildings and accessory structures, and for their installation. Installing one requires an installation permit, issued by the Department or by a local enforcement agency that has an agreement with it. Local governments cannot add their own inspections of a certified unit, but local zoning, setback, fire zone and site development rules still apply.
Septic and onsite wastewater systems
The Arizona Department of Environmental Quality sets the rules for onsite wastewater treatment facilities and requires their design documents to be submitted for review. The ADEQ director can delegate this work to a county health or environmental agency, so the septic permit office for a property may be a county agency rather than ADEQ.
Verified October 28, 2026 against Arizona sources. Arizona permit rules, sources and other counties
Common projects in Pima County
Arizona has statewide rules on file for 3 of these projects; they apply in Pima County along with local permit requirements.
Rooftop solar
For grid-tied solar photovoltaic systems, cities and towns must follow state permit standards: plans show the system location, mounting details and electrical diagrams, and a professional engineer's stamp may not be required unless the city explains in writing why it is necessary.
Read more
A city may use a qualified online automated permitting platform, and solar permit fees may not exceed the actual cost of issuing the permit.
Pools and spas
State law requires a residential pool 18 inches or more deep and wider than 8 feet to be enclosed by a barrier at least 5 feet high with self-closing, self-latching gates that open outward, unless a local ordinance at least as strict applies or all residents are at least six years old.
Read more
Where the house forms part of the barrier, extra protections such as a 4-foot inner barrier, a motorized safety cover, or self-latching doors are required.
Also named in Pima County’s exemption summary.
Accessory dwelling units
Cities and towns with more than 75,000 people must allow at least one attached and one detached accessory dwelling unit wherever a single-family home is allowed, and must allow an ADU of 75 percent of the home's floor area or 1,000 square feet, whichever is less.
Read more
They cannot require extra parking, matching design, or side or rear setbacks over five feet, and cannot require a commercial building code or fire sprinklers for an ADU.
Arizona source: azleg.gov ↗ · Accessory dwelling units permit guide
Named in Pima County’s exemption summary (read it before assuming the work is exempt): Decks · Fences · Roof replacement · Electrical work · Plumbing work · Septic systems · Floodplain development · Kitchen and bathroom remodels · Window and door replacement
Guides for other projects: Sheds and accessory buildings · Water heaters · Heating and air conditioning · Demolition · Driveways and culverts · Home additions and garages · Generators and EV chargers · Manufactured and mobile homes · All 21 project guides
Other permits you may need in Pima County
These are separate from the building permit and come from the agencies named, under Arizona rules.
Septic system
Arizona Department of Environmental Quality (ADEQ) and delegated county agencies
ADEQ or a county agency it has delegated permits septic systems under A.A.C. Title 18, Chapter 9, Article 3. After a site investigation and design, a Construction Authorization allows building and a Discharge Authorization allows use after final inspection.
Read more
When a property with a septic system is sold, a qualified inspector must inspect it within six months before the transfer (R18-9-A316).
Floodplain development
Arizona Department of Water Resources (state NFIP coordinator); county flood control districts and cities
Each county flood control district adopts and enforces floodplain regulations, and its written authorization is needed before development in a delineated floodplain (A.R.S. 48-3613), unless a city or town has taken over floodplain management.
Read more
State law requires a home's lowest floor to be at least one foot above the base flood elevation and bans floodway work, including fill, that raises flood levels (A.R.S. 48-3609).
Official page: azleg.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Arizona Department of Transportation (ADOT) district offices; counties and cities for local roads
Any work in state highway right-of-way, including a driveway, needs an ADOT Encroachment Permit, issued by the ADOT district office where the work will be located. Driveways onto county or city roads need authorization from that local government.
Water well
Arizona Department of Water Resources (ADWR)
Before a well is drilled or deepened, a Notice of Intention to Drill must be filed with ADWR (A.R.S. 45-596). It names the well driller and license number, the driller must hold a valid contractor's license, and drilling may begin only after ADWR issues a drilling card. ADWR generally acts within 15 days, and the well must be finished within one year.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Pima County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 520-724-9000 if you are unsure.
Can I apply for a permit online in Pima County?
Yes. The listing includes an online permit portal at aca-prod.accela.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Pima County?
Pima County Development Services Department publishes its fee schedule online (pima.gov). Look up your project type there, and ask the office at 520-724-9000 for an estimate if your project is not listed.
How do I look up past permits for an address in Pima County?
Start with the Accela Citizen Access portal at aca-prod.accela.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 520-724-9000 for the file or send a public records request.
Can I check a contractor's license for work in Pima County?
Yes, at roc.az.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Pima County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Pima County borders Cochise County, Graham County, Maricopa County, Pinal County, Santa Cruz County, Yuma County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Pima County.
