County Permit SearchU.S. compliance directory
WyomingLaramie County

Administrative overview · FIPS 56021

Laramie County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Laramie County Planning & Development - Building Department

For a project in or near Laramie County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

307-633-4303; inspection requests 307-633-4615; violations 307-775-7456

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Laramie County Planning & Development Office, Archer Complex, 3966 Archer Parkway, Cheyenne, WY 82009

Operating hours

Monday-Friday, 7:00 AM-5:30 PM Mountain; closed Saturday and Sunday

Review expectation

Most complete permit submittals are issued within seven to ten business days; commercial review time depends on project size and complexity. Incomplete applications are not accepted.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Laramie County

Who handles permitting for this jurisdiction?

Laramie County Planning & Development - Building Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 307-633-4303; inspection requests 307-633-4615; violations 307-775-7456.

How long might review take?

Most complete permit submittals are issued within seven to ten business days; commercial review time depends on project size and complexity. Incomplete applications are not accepted.

How are inspections scheduled?

Request inspections through the SmartGov portal after registering and obtaining an access code from 307-633-4303, or call the inspection line at 307-633-4615. Requests may be made at any time, but applicants should allow at least two business days for scheduling. Approved plans must be on site, and each required inspection must pass before work advances to the next phase.

Which codes and exemptions should I review?

2024 International Building Code, 2024 International Residential Code, 2024 International Fire Code, 2024 International Plumbing Code, 2024 International Fuel Gas Code, 2024 International Existing Building Code and 2024 International Mechanical Code, all with County amendments; 2023 National Electrical Code. The 2024 IBC/IRC family became effective January 1, 2025, and the 2024 IFC became effective April 15, 2025. County residential permit exemptions include nonstructural reroofing, siding, replacement of windows with same-size windows, and detached residential accessory structures without habitable space not exceeding 400 square feet; certain agricultural-building exceptions may also apply and must be confirmed with the office. Most other work requires permits and inspections, including basement finishing, manufactured-home placement, solar, generators and personal wind turbines.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?