Who issues permits
Lincoln County Office of Planning and Development is the county office listed for building permits in Lincoln County.
How to get a permit in Lincoln County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the iWorQ portal at lincolncountywy.portal.iworq.net, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
The Administrator reviews a Residential Use Permit application for completeness within seven days. After accepting a complete application, the Administrator must approve, conditionally approve, deny or extend review within 14 days.
Search Lincoln County permit records
The listing’s online portal is at lincolncountywy.portal.iworq.net ↗ and runs on iWorQ. Look for its public search and try the property address, parcel number or permit number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Lincoln County Office of Planning and Development at 307-885-3106. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Lincoln County Office of Planning and Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Lincoln County issues and enforces Residential Use, auxiliary-building, land-use, driveway, floodplain and small-wastewater permits, but the County expressly states that it does not require residential construction inspections and only strongly recommends that noncommercial buildings meet the 2006 International Residential Code or newer. Projects within Wyoming State Fire Marshal jurisdiction remain subject to the state's 2024 International Fire, Building, Fuel Gas, Mechanical and Existing Building Codes and the 2026 National Electrical Code effective July 1, 2026.
Wyoming: partial statewide code. Details
Scheduling inspections
County staff may enter and reasonably inspect development for compliance with the approved permit and land-use regulations, but Lincoln County does not require residential building-code inspections. The County recommends six inspections by a certified IRC inspector; owners arrange those private inspections themselves. For septic work, call the applicable Planning Office at least 24 hours ahead to schedule the pre-application soil-cut inspection. Electrical permits and inspections are handled through the Wyoming state portal.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
No structural work may begin until the County permit is issued. False statements invalidate the permit; if a permit is revoked, all work must cease until reissued. Wyoming statute allows a fine of $750 per day for violating the land-use regulations or building without the proper permit. A Residential Use Permit becomes null and void two years after issuance if work has not commenced, although renewal may be requested before expiration. Driveway permits may be declared void for breach, and the County may recover enforcement costs and attorney fees if it prevails.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at 307-885-3106 about:
- Exempt work: which minor work needs no permit. The County's current materials do not publish a reliable list of minor or cosmetic work exempt from its land-use permits. New single- and two-family dwellings, townhouses, duplexes, twin homes and guest houses require a Residential Use Permit; additions and non-living auxiliary buildings have separate permits. Confirm minor work with Planning. Extra permits may be required for a new or modified septic system, floodplain or wetland work, driveway access and electrical wiring.
Wyoming rules that apply in Lincoln County
These rules come from Wyoming law and state agencies, so they apply in Lincoln County on top of anything the local office requires.
Building code
Partial statewide code
On June 28, 2024, the Council on Fire Prevention and Electrical Safety in Buildings adopted the 2024 International Building, Existing Building, Fire, Mechanical and Fuel Gas Codes. The International Residential Code applies only where those codes refer to it.
Read more
The department's pages now list the 2026 National Electrical Code as the electrical standard. The state reviews plans for state and local government buildings, public buildings over 5,000 sq ft, multistory public buildings, child care centers for more than 10 children, and places of public assembly (W.S. 35-9-108). Private one- and two-family homes are not on that list. Farms and ranches of 40 acres or more on deeded land are exempt (W.S. 35-9-118). A city or county may take over enforcement of fire, building or electrical standards. To do so it must adopt standards at least as strict as the state's, use certified inspectors, and keep its codes current within six months of a state update (W.S. 35-9-121).
Outside city limits
A county issues building permits only if it has adopted a building code. Many rural areas have no building permit program for homes, so check with your county planning or building office. Outside cities and counties that have taken over electrical enforcement, a state electrical wiring permit is still required for new construction and for remodeling that needs the utility to disconnect and restore power. State electrical inspectors cover the state by county.
Contractor and trade licensing
Wyoming does not license general contractors, remodelers or plumbers at the state level. Its professional licensing laws (Title 33) have no chapter for them, so any licensing is done by cities and counties. Electrical work is licensed by the state.
Read more
It must be done by a licensed electrical contractor employing licensed master or journeyman electricians or supervised apprentices (W.S. 35-9-123). An owner may do electrical work on property they own or lease if it is not for immediate resale. They must still follow the code, and they still need a wiring permit where one is required. This exemption doesn't cover anyone the owner hires. Who may pull a building permit is up to the local building department.
Electrical, plumbing and HVAC
The Department of Fire Prevention and Electrical Safety licenses electrical contractors, master, journeyman and apprentice electricians, and low-voltage and limited contractors and technicians.
Read more
Limited technicians include those for HVAC equipment wiring, signs, elevators and well/irrigation systems. Electrical work must meet the National Electrical Code (W.S. 35-9-120). The state's chief electrical inspector enforces it except where a city or county has been granted local electrical enforcement authority. Wyoming has no state plumbing or HVAC (mechanical) license, so check with your city or county for local licensing and plumbing permits.
State programs that can affect your permit
State electrical wiring permits and inspections
An electrical wiring permit must be obtained before starting new construction, or remodeling of a building, mobile home or premises that requires the utility to disconnect and restore power. The utility may not energize a service that needs a permit until one is issued (W.S. 35-9-120(e)). Homeowners apply through the State Fire Marshal's online portal using the homeowner wiring permit account type. The permit is attached to the meter housing. Cities and counties with local electrical enforcement authority issue their own permits.
State fire and building plan review
The State Fire Marshal reviews plans and inspects construction for government buildings, public buildings over 5,000 sq ft, multistory public buildings, child care centers for more than 10 children, and places of assembly of any size. It also reviews fire protection systems and alternative energy installations. Cities and counties with delegated authority may do this review instead.
Verified October 28, 2026 against Wyoming sources. Wyoming permit rules, sources and other counties
Common projects in Lincoln County
Wyoming has statewide rules on file for 2 of these projects; they apply in Lincoln County along with local permit requirements.
Electrical work
Outside cities and counties with their own electrical enforcement, a state electrical wiring permit is required before starting new construction, or a remodel that needs the utility to disconnect and restore power (W.S. 35-9-120(e); DFPES rules ch. VII). Owners may do the work themselves on property they own or lease that is not for immediate resale.
Wyoming source: wsfm.wyo.gov ↗ · Electrical work permit guide
Rooftop solar
The State Fire Marshal's plan review page lists alternative energy installations and alterations (solar, residential wind, generators) among the projects to submit to the department for review before work begins. Ask the department, or your city or county if it has delegated authority, whether your project needs review.
Guides for other projects: Decks · Fences · Sheds and accessory buildings · Roof replacement · Water heaters · Heating and air conditioning · Pools and spas · Accessory dwelling units · All 21 project guides
Other permits you may need in Lincoln County
These are separate from the building permit and come from the agencies named, under Wyoming rules.
Septic system
Wyoming DEQ or delegated county/city program
Septic systems treating less than 2,000 gallons of domestic sewage per day are permitted under DEQ's Small Wastewater Facility General Permit, and construction cannot begin until the permitting authority issues a permit to construct or notice of coverage.
Read more
DEQ issues these permits directly in Carbon, Niobrara, Platte and Weston counties (and Campbell County for commercial systems only); elsewhere, DEQ's Small Wastewater Permitting Authority list identifies the local agency that issues them. After installation, a Certificate of Completion must be submitted.
Floodplain development
Wyoming Office of Homeland Security (WOHS)
WOHS manages the state's NFIP program and is the contact for communities that want to join. Participating communities, 19 of 23 counties and 66 of 99 municipalities, adopt and enforce floodplain ordinances that meet or exceed NFIP minimums, so check with your county or town floodplain manager before building in a mapped flood zone.
Official page: hls.wyo.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Wyoming DOT (WYDOT)
To build a new private access onto a state highway or alter an existing one, the property owner applies for a WYDOT access permit through the district engineer for the area, and no work may start in the highway right-of-way until the approved permit is received.
Read more
The applicant does and pays for all access construction, and residential accesses must be 16 to 24 feet wide. For county roads, check with the county.
Official page: law.cornell.edu ↗ · Driveway and culvert guide
Erosion and sediment control
Wyoming DEQ
Construction that disturbs 1 acre but less than 5 acres, or is part of a common plan of development that will disturb 1 to 5 acres, is covered by DEQ's Small Construction General Permit, a no-application permit where following the permit's terms provides coverage.
Read more
Projects disturbing 5 or more acres, or part of a larger common plan that will, need Large Construction General Permit coverage, which requires a Notice of Intent, a stormwater pollution prevention plan (SWPPP) and a fee.
Water well
Wyoming State Engineer's Office (SEO)
Every water well, including domestic and stock wells, needs a permit from the State Engineer before drilling starts, applied for on Form U.W. 5 (Application for Permit to Appropriate Ground Water) with the filing fee.
Read more
With limited exceptions, wells must be drilled by a Wyoming licensed water well drilling contractor, and a Statement of Completion (Form U.W. 6) is due within 30 days after the well is completed.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Lincoln County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 307-885-3106 if you are unsure.
Can I apply for a permit online in Lincoln County?
Yes. The listing includes an online permit portal at lincolncountywy.portal.iworq.net. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Lincoln County?
Lincoln County Office of Planning and Development publishes its fee schedule online (cms5.revize.com). Look up your project type there, and ask the office at 307-885-3106 for an estimate if your project is not listed.
How do I look up past permits for an address in Lincoln County?
Start with the iWorQ portal at lincolncountywy.portal.iworq.net and search by address, parcel or permit number. If an older permit is not there, ask the office at 307-885-3106 for the file or send a public records request.
Can I check a contractor's license for work in Lincoln County?
Yes, at wyelectrician.imagetrendlicense.com. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Lincoln County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Lincoln County borders Sublette County, Sweetwater County, Teton County, Uinta County, Bear Lake County (Idaho), Bonneville County (Idaho), and others.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Lincoln County.