Who issues permits

Teton County Planning and Building Services Department is the county office listed for building permits in Teton County.

Also listed: Building Division.

How to get a permit in Teton County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the SmartGov portal at co-teton-wy.smartgovcommunity.com.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Teton County permit records

The listing’s online portal is at co-teton-wy.smartgovcommunity.com ↗ and runs on SmartGov. Use the portal’s search to look up permits by address or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Teton County Planning and Building Services Department at 307-733-3959. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Teton County Planning and Building Services Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

2024 International Building Code, 2024 International Residential Code, 2024 International Plumbing Code, 2024 International Mechanical Code, 2024 International Fuel Gas Code, 2021 International Energy Conservation Code, 2024 International Existing Building Code, limited 2024 International Property Maintenance Code provisions, and the 2023 National Electrical Code, all with County amendments. Jackson Hole Fire/EMS separately enforces the County's 2024 International Fire Code and 2024 International Wildland-Urban Interface Code.

Wyoming: partial statewide code. Details

Work that may not need a permit

County amendments exempt one one-story detached accessory structure per parcel when its floor area does not exceed 200 square feet; one qualifying private-use agricultural building per parcel on more than two acres when roof area is at most 600 square feet and eave height at most 10 feet; qualifying utility-free hoop houses up to 3,500 square feet and 16 feet high; swings and playground equipment; nonstructural sidewalks and slabs; decks or patios no more than 30 inches above grade with no permanent construction above; agricultural fences and fences under six feet; and nonstructural landscaping. Exempt work must still meet setbacks and Land Development Regulations, and separate electrical, plumbing, mechanical, septic or planning permits may apply.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

The permit holder or agent must request inspections. Register and sign in to the SmartGov portal, open My Portal and My Inspections, or leave a message on the inspection line at 307-732-5745. Contact the Permit Technician at 307-733-7030 if the permit is not linked or an inspection is unavailable; do not request same-day inspections online. Fire Department electrical, sprinkler and other fire inspections must be scheduled directly with Jackson Hole Fire/EMS. An inspection must occur at least once every 180 days to keep the permit active.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Work started before the required permit is issued is charged an investigation fee at least equal to the permit fee, effectively doubling the normal permit charge; mechanical and fuel-gas provisions also expressly double the permit fee. Payment does not excuse compliance or other legal penalties. The adopted codes authorize stop-work enforcement, and work may also be prohibited until corrections and any $60-per-hour reinspection fee are resolved; continuing or other violations are subject to penalties prescribed by law.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 307-733-3959 about:

  • Review times: how long plan review currently takes. Not available for general building permits; the County states review and processing time depends on the project. Correctly submitted mechanical, plumbing, reroof and demolition trade permits are typically issued within 48 hours.

Wyoming rules that apply in Teton County

These rules come from Wyoming law and state agencies, so they apply in Teton County on top of anything the local office requires.

Building code

Partial statewide code

On June 28, 2024, the Council on Fire Prevention and Electrical Safety in Buildings adopted the 2024 International Building, Existing Building, Fire, Mechanical and Fuel Gas Codes. The International Residential Code applies only where those codes refer to it.

Read more

The department's pages now list the 2026 National Electrical Code as the electrical standard. The state reviews plans for state and local government buildings, public buildings over 5,000 sq ft, multistory public buildings, child care centers for more than 10 children, and places of public assembly (W.S. 35-9-108). Private one- and two-family homes are not on that list. Farms and ranches of 40 acres or more on deeded land are exempt (W.S. 35-9-118). A city or county may take over enforcement of fire, building or electrical standards. To do so it must adopt standards at least as strict as the state's, use certified inspectors, and keep its codes current within six months of a state update (W.S. 35-9-121).

Wyoming Department of Fire Prevention and Electrical Safety (State Fire Marshal); Council on Fire Prevention and Electrical Safety in Buildings ↗

Outside city limits

A county issues building permits only if it has adopted a building code. Many rural areas have no building permit program for homes, so check with your county planning or building office. Outside cities and counties that have taken over electrical enforcement, a state electrical wiring permit is still required for new construction and for remodeling that needs the utility to disconnect and restore power. State electrical inspectors cover the state by county.

Contractor and trade licensing

Wyoming does not license general contractors, remodelers or plumbers at the state level. Its professional licensing laws (Title 33) have no chapter for them, so any licensing is done by cities and counties. Electrical work is licensed by the state.

Read more

It must be done by a licensed electrical contractor employing licensed master or journeyman electricians or supervised apprentices (W.S. 35-9-123). An owner may do electrical work on property they own or lease if it is not for immediate resale. They must still follow the code, and they still need a wiring permit where one is required. This exemption doesn't cover anyone the owner hires. Who may pull a building permit is up to the local building department.

Electrical, plumbing and HVAC

The Department of Fire Prevention and Electrical Safety licenses electrical contractors, master, journeyman and apprentice electricians, and low-voltage and limited contractors and technicians.

Read more

Limited technicians include those for HVAC equipment wiring, signs, elevators and well/irrigation systems. Electrical work must meet the National Electrical Code (W.S. 35-9-120). The state's chief electrical inspector enforces it except where a city or county has been granted local electrical enforcement authority. Wyoming has no state plumbing or HVAC (mechanical) license, so check with your city or county for local licensing and plumbing permits.

State programs that can affect your permit

State electrical wiring permits and inspections

An electrical wiring permit must be obtained before starting new construction, or remodeling of a building, mobile home or premises that requires the utility to disconnect and restore power. The utility may not energize a service that needs a permit until one is issued (W.S. 35-9-120(e)). Homeowners apply through the State Fire Marshal's online portal using the homeowner wiring permit account type. The permit is attached to the meter housing. Cities and counties with local electrical enforcement authority issue their own permits.

Official page: wsfm.wyo.gov ↗

State fire and building plan review

The State Fire Marshal reviews plans and inspects construction for government buildings, public buildings over 5,000 sq ft, multistory public buildings, child care centers for more than 10 children, and places of assembly of any size. It also reviews fire protection systems and alternative energy installations. Cities and counties with delegated authority may do this review instead.

Official page: wsfm.wyo.gov ↗

Verified October 28, 2026 against Wyoming sources. Wyoming permit rules, sources and other counties

Common projects in Teton County

Wyoming has statewide rules on file for 2 of these projects; they apply in Teton County along with local permit requirements.

  • Electrical work

    Outside cities and counties with their own electrical enforcement, a state electrical wiring permit is required before starting new construction, or a remodel that needs the utility to disconnect and restore power (W.S. 35-9-120(e); DFPES rules ch. VII). Owners may do the work themselves on property they own or lease that is not for immediate resale.

    Also named in Teton County’s exemption summary.

    Wyoming source: wsfm.wyo.gov ↗ · Electrical work permit guide

  • Rooftop solar

    The State Fire Marshal's plan review page lists alternative energy installations and alterations (solar, residential wind, generators) among the projects to submit to the department for review before work begins. Ask the department, or your city or county if it has delegated authority, whether your project needs review.

    Wyoming source: wsfm.wyo.gov ↗ · Rooftop solar permit guide

Named in Teton County’s exemption summary (read it before assuming the work is exempt): Decks · Fences · Sheds and accessory buildings · Roof replacement · Heating and air conditioning · Plumbing work · Septic systems

Guides for other projects: Water heaters · Pools and spas · Accessory dwelling units · Demolition · Driveways and culverts · Floodplain development · Kitchen and bathroom remodels · Home additions and garages · All 21 project guides

Other permits you may need in Teton County

These are separate from the building permit and come from the agencies named, under Wyoming rules.

  • Septic system

    Wyoming DEQ or delegated county/city program

    Septic systems treating less than 2,000 gallons of domestic sewage per day are permitted under DEQ's Small Wastewater Facility General Permit, and construction cannot begin until the permitting authority issues a permit to construct or notice of coverage.

    Read more

    DEQ issues these permits directly in Carbon, Niobrara, Platte and Weston counties (and Campbell County for commercial systems only); elsewhere, DEQ's Small Wastewater Permitting Authority list identifies the local agency that issues them. After installation, a Certificate of Completion must be submitted.

    Official page: deq.wyoming.gov ↗ · Septic permit guide

  • Floodplain development

    Wyoming Office of Homeland Security (WOHS)

    WOHS manages the state's NFIP program and is the contact for communities that want to join. Participating communities, 19 of 23 counties and 66 of 99 municipalities, adopt and enforce floodplain ordinances that meet or exceed NFIP minimums, so check with your county or town floodplain manager before building in a mapped flood zone.

    Official page: hls.wyo.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Wyoming DOT (WYDOT)

    To build a new private access onto a state highway or alter an existing one, the property owner applies for a WYDOT access permit through the district engineer for the area, and no work may start in the highway right-of-way until the approved permit is received.

    Read more

    The applicant does and pays for all access construction, and residential accesses must be 16 to 24 feet wide. For county roads, check with the county.

    Official page: law.cornell.edu ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Wyoming DEQ

    Construction that disturbs 1 acre but less than 5 acres, or is part of a common plan of development that will disturb 1 to 5 acres, is covered by DEQ's Small Construction General Permit, a no-application permit where following the permit's terms provides coverage.

    Read more

    Projects disturbing 5 or more acres, or part of a larger common plan that will, need Large Construction General Permit coverage, which requires a Notice of Intent, a stormwater pollution prevention plan (SWPPP) and a fee.

    Official page: deq.wyoming.gov ↗

  • Water well

    Wyoming State Engineer's Office (SEO)

    Every water well, including domestic and stock wells, needs a permit from the State Engineer before drilling starts, applied for on Form U.W. 5 (Application for Permit to Appropriate Ground Water) with the filing fee.

    Read more

    With limited exceptions, wells must be drilled by a Wyoming licensed water well drilling contractor, and a Statement of Completion (Form U.W. 6) is due within 30 days after the well is completed.

    Official page: seo.wyo.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Teton County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 307-733-3959 if you are unsure.

Can I apply for a permit online in Teton County?

Yes. The listing includes an online permit portal at co-teton-wy.smartgovcommunity.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Teton County?

Teton County Planning and Building Services Department publishes its fee schedule online (tetoncountywy.gov). Look up your project type there, and ask the office at 307-733-3959 for an estimate if your project is not listed.

How do I look up past permits for an address in Teton County?

Start with the SmartGov portal at co-teton-wy.smartgovcommunity.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 307-733-3959 for the file or send a public records request.

Can I check a contractor's license for work in Teton County?

Yes, at jacksonwy.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

Which building code edition is cited for Teton County?

The published code information cites the 2024 International Residential Code and 2024 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.

What if my property is near the Teton County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Teton County borders Fremont County, Lincoln County, Park County, Sublette County, Bonneville County (Idaho), Fremont County (Idaho), and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Teton County.