County Permit SearchU.S. compliance directory
WyomingCampbell County

Administrative overview · FIPS 56005

Campbell County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Campbell County Public Works Building Division

For a project in or near Campbell County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

307-682-1970

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Campbell County Public Works Building Division, 500 South Gillette Avenue, Suite 1500, Gillette, WY 82716

Operating hours

Monday-Friday, 8:00 AM-5:00 PM Mountain

Review expectation

Allow 10 business days for commercial plan review when the application needs no corrections; Planning, the Fire Marshal and the Building Division must approve it.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Campbell County

Who handles permitting for this jurisdiction?

Campbell County Public Works Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 307-682-1970 and request the current application route before preparing a final submittal.

How long might review take?

Allow 10 business days for commercial plan review when the application needs no corrections; Planning, the Fire Marshal and the Building Division must approve it.

How are inspections scheduled?

Call the Building Division at 307-682-1970 to schedule required inspections. The County performs inspections during construction, notifies the owner and builder of violations, and requires a final inspection and Certificate of Occupancy before an applicable permitted building is occupied. For an optional rural-home Certificate of Occupancy, the published stages include footing, stemwall, service utility lines, rough framing/electrical/plumbing/HVAC, drywall and final. Assigned address numbers must be posted before inspectors will visit. The first two inspections of the same work are included; each subsequent failed reinspection costs $60 and must be paid before scheduling.

Which codes and exemptions should I review?

Campbell County's current commercial checklist requires compliance with the 2024 International Building, Plumbing, Mechanical and Fire Codes, plus applicable county, state and federal requirements. Chapter 4 also governs electrical, mechanical, plumbing, small-wastewater and fire-safety work; small wastewater systems must comply with Wyoming DEQ Water Quality Rules Chapters 11 and 25. The Building Division enforces these rules in unincorporated Campbell County outside Gillette and Wright, while zoning applies only to designated zoning districts and most platted subdivisions. County Chapter 4 exempts one- and two-family dwellings from the general building permit, although special requirements apply in zoned or platted subdivisions and separate electrical, mechanical, plumbing, septic, zoning and floodplain permits may still be required. It also exempts qualifying structures on parcels of 40 acres or more used exclusively for farm/ranch operations, HUD-code manufactured homes, and public, commercial or industrial buildings associated with oil, gas, coal or other mineral extraction. The County does not publish a separate list of cosmetic repair exemptions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?