Kanawha County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Kanawha County Department of Planning & Development

For a project in or near Kanawha County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-357-0570

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

407 Virginia Street East, 2nd Floor, Charleston, WV 25301

Operating hours

Monday-Friday, 8:00 AM-5:00 PM

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kanawha County

Who handles permitting for this jurisdiction?

Kanawha County Department of Planning & Development is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-357-0570 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Call Planning & Development at 304-357-0570 to coordinate required ordinance and floodplain inspections. Where required in a floodplain, the finished-construction elevation certificate and all prescribed inspections must be completed before a certificate of compliance or utility authorization is issued.

Which codes and exemptions should I review?

West Virginia State Building Code, including the 2018 IBC, IRC, IPC, IMC, IFGC, IPMC, IEBC, and International Swimming Pool and Spa Code; 2015 IECC; 2017 ICC/ANSI A117.1; 2020 National Electrical Code; and NFPA 101 Life Safety Code (2021), with state amendments. Kanawha County also enforces its Floodplain Ordinance effective August 1, 2023, subdivision regulations, and property-maintenance ordinance in unincorporated areas. County guidance requires permits for any new, used, relocated, or placed structure; mobile homes; land clearing or earth disturbance; septic/aeration work; fences; basements; solar projects; specified signs; and remodeling or improvements exceeding 50% of market value. It does not publish a broader cosmetic-work exemption list. State law exempts primarily agricultural/agritourism structures from the State Building Code, and residential storage sheds no larger than 200 square feet without plumbing or electricity are exempt from local code inspection, though the county does not state that such sheds are exempt from its permit requirement.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?