County Permit SearchU.S. compliance directory
West VirginiaPutnam County

Administrative overview · FIPS 54079

Putnam County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Putnam County Office of Planning & Infrastructure

For a project in or near Putnam County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

304-586-0237

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

12093 Winfield Road, Room 226, Winfield, WV 25213

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Putnam County

Who handles permitting for this jurisdiction?

Putnam County Office of Planning & Infrastructure is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 304-586-0237 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Submit the applicable zoned- or non-zoned-area PDF application and required site documents to the Office of Planning & Infrastructure. Call 304-586-0237; Senior Planner/Certified Floodplain Manager Melissa Sargent is extension 1335. The Floodplain Administrator may inspect during construction, and a certificate of compliance based on inspection and any required elevation or engineering documents is required before occupancy or permanent utilities in flood-hazard areas.

Which codes and exemptions should I review?

Putnam County Improvement Location Permit Ordinance (amended through December 13, 2022), Floodplain Management Program Ordinance adopted April 14, 2015, Subdivision Regulations, and the Zoning Ordinance for designated zoned unincorporated areas (amended through February 10, 2026). The county permit is primarily a development/location and floodplain approval; the county does not publish a general structural model-code suite enforced by this office. No general minor- or cosmetic-work exemption list is published. In non-zoned areas outside the 100-year floodplain, dirt work may not require the county development permit but remains subject to drainage and erosion conditions; construction of permanent structures and manufactured-home placement requires prior review. Every type of development, including dirt work, requires a permit when the property is in the 100-year floodplain.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?