County Permit SearchU.S. compliance directory
VirginiaRoanoke County

Administrative overview · FIPS 51161

Roanoke County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Roanoke County Office of Building Safety

For a project in or near Roanoke County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

540-772-2065

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

5204 Bernard Drive, Second Floor, Roanoke, VA 24018

Operating hours

Operating hours not verified

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Roanoke County

Who handles permitting for this jurisdiction?

Roanoke County Office of Building Safety is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 540-772-2065.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Schedule, reschedule, cancel, or check inspection results through SelecTxt by texting 833-886-2087, or call 540-772-2065 and select permitting/development review and then inspections/permits. Provide the issued application number, job address, and any partial-inspection area. Approved plans and the permit must be on site, and work must not be covered before inspection.

Which codes and exemptions should I review?

2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction Code, 2021 Virginia Residential Code, 2021 Virginia Existing Building Code, 2021 Virginia Property Maintenance Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, 2021 International Swimming Pool and Spa Code, 2021 International Fire Code as applicable, and 2020 National Electrical Code. Roanoke County identifies the 2021 USBC as current effective January 18, 2024. The county lists ordinary repairs such as painting, residential reroofing, most glass and doors, floor and porch flooring, plaster/interior tile and wall-covering repairs, residential cabinets, and qualifying like-for-like fixtures and appliances; most wiring and equipment under 50 volts; detached accessory structures under 256 square feet; tents under 900 square feet for fewer than 50 people; fences/privacy walls no higher than 6 feet; and pools under 200 square feet, 5,000 gallons, and 24 inches deep as building-permit exempt. A zoning permit remains required for small accessory structures, and other approvals may still apply.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?