County Permit SearchU.S. compliance directory
VirginiaFloyd County

Administrative overview · FIPS 51063

Floyd County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Floyd County Building Inspection Department

For a project in or near Floyd County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

540-745-9358 (office); 540-745-9359 (permits and inspections)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

202 E Main St, Floyd, VA 24091

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.; permits are not issued after 4:00 p.m.

Review expectation

Normal permit processing is 24-48 hours; the building official must approve the plans and application before issuance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Floyd County

Who handles permitting for this jurisdiction?

Floyd County Building Inspection Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 540-745-9358 (office); 540-745-9359 (permits and inspections) and request the current application route before preparing a final submittal.

How long might review take?

Normal permit processing is 24-48 hours; the building official must approve the plans and application before issuance.

How are inspections scheduled?

Call 540-745-9359 Monday-Friday with the building permit number and owner's name. All inspections require at least 24 hours' advance notice; no same-day inspections are made.

Which codes and exemptions should I review?

2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction/International Building Code, 2021 International Residential Code, 2021 International Mechanical Code, 2021 International Plumbing Code, 2021 International Fuel Gas Code, 2021 International Energy Conservation Code, and applicable electrical code; also Floyd County erosion-control, manufactured-home, and land-division requirements County fee sheet states no permit is required for nonhabitable detached sheds/playhouses 256 sq ft or smaller; decks/porches smaller than 5 x 5 ft; pools with water area 150 sq ft or smaller, capacity 5,000 gallons or less, or depth 24 inches or less; and construction/alteration valued under $500 involving repair, plastering, painting, or replacement siding/shingles unless commercial work or a roof-pitch change. Farm/agricultural buildings require a farm permit but carry no building-permit fee.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?