Who issues permits

Campbell County Community Development is the county office listed for building permits in Campbell County.

Also listed: Building Inspections Office.

How to get a permit in Campbell County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the SmartGov portal at co-campbell-va.smartgovcommunity.com.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

Most complete permits can be issued while the applicant waits; permits requiring plan review may take several days. The online portal asks applicants to allow 24 business hours for an email response regarding application status.

Search Campbell County permit records

The listing’s online portal is at co-campbell-va.smartgovcommunity.com ↗ and runs on SmartGov. Use the portal’s search to look up permits by address or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Campbell County Community Development at 434-332-9596. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Campbell County Community Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

All Campbell County permits issued after January 18, 2025 are subject to the 2021 Virginia Uniform Statewide Building Code cycle. This includes the 2021 Virginia Construction, Residential, Existing Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation, and Swimming Pool and Spa codes, the referenced 2020 National Electrical Code, and applicable Virginia Statewide Fire Prevention, Industrialized Building Safety, Manufactured Home Safety, and Amusement Device regulations. County design criteria include 25 psf ground snow load, 110 mph wind speed, seismic category B, 18-inch frost depth, severe weathering, and moderate-to-heavy termite exposure.

Virginia: statewide code. Details

Work that may not need a permit

Campbell County lists painting; residential reroofing; replacement windows and doors outside fire-rated assemblies; repair or replacement of interior walls and wall coverings; floor and porch-floor coverings; cabinets; repair or replacement of existing plumbing and electrical fixtures; common-appliance replacement; residential siding; lighting systems under 50 volts; and fences as examples that may be exempt. Qualifying one-story detached storage buildings and garages of 256 square feet or less may also be exempt under the Virginia USBC. Zoning, floodplain, land-disturbance, health, or other approval can still apply.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Request inspections through the Campbell County SmartGov portal at https://co-campbell-va.smartgovcommunity.com/Public/Home or call 434-332-9596 with the permit number. The portal also displays pending applications, issued permits, and inspection results. Required work must remain exposed and accessible until approved; a $50 reinspection fee applies when the address is wrong or absent, the premises are inaccessible, corrections were not made, or work is not ready.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Campbell County adds $50 to the normal permit fee when regulated construction, alteration, repair, or other work begins before the permit is secured; paying the added fee does not prevent legal prosecution. The County also charges $50 for specified avoidable reinspections. The Building Official may issue a stop-work order, require correction or exposure of concealed work, and suspend or revoke permits, with civil or criminal enforcement available under Virginia Code §36-106. A permit remains valid for six months and each inspection extends it another six months; inactivity may require reapplication and added reactivation fees.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Virginia rules that apply in Campbell County

These rules come from Virginia law and state agencies, so they apply in Campbell County on top of anything the local office requires.

Building code

Statewide code

The 2021 USBC took effect January 18, 2024. It is made up of the Virginia Construction Code (based on the 2021 IBC), the Virginia Residential Code (2021 IRC with Virginia amendments) for one- and two-family homes and townhouses, and the 2021 I-codes for mechanical, plumbing, fuel gas and energy.

Read more

Electrical work follows the 2020 NEC (NFPA 70). Localities may not amend the code. A one-year transition, during which the 2018 code could also be used, ended January 18, 2025. The Board of Housing and Community Development is working on a 2024 edition, but it had not been adopted as of October 2026.

Virginia Department of Housing and Community Development (DHCD), State Building Codes Office; codes adopted by the Board of Housing and Community Development ↗

Outside city limits

Every county must enforce the USBC (Va. Code § 36-105), so building permits are required in unincorporated areas. A county without its own building department must contract with another locality or an approved agency. Towns under 3,500 people may run their own building department. If they don't, the county enforces the code inside the town.

Contractor and trade licensing

Anyone who takes on construction work worth more than $1,000 for others needs a DPOR contractor license. The class depends on job size. Class C covers single jobs over $1,000 and under $30,000, or under $250,000 of work in 12 months.

Read more

Class B covers single jobs from $30,000 to under $150,000, or $250,000 to under $1 million a year. Class A covers single jobs of $150,000 or more, or $1 million or more a year (Va. Code § 54.1-1100). Owners are exempt from contractor licensing when working on no more than one primary residence they own and live in during any 24-month period. They must still follow the USBC, and if they sell to an outside buyer without a certificate of occupancy, the buyer must agree to that in writing (§ 54.1-1101). The USBC lets the owner, a lessee, or their agent apply for a permit. Applicants must show a DPOR license or file a written statement that they are not required to be licensed (VCC 108.3–108.4; § 54.1-1111).

Electrical, plumbing and HVAC

The Board for Contractors also licenses individual tradesmen at the journeyman and master levels in electrical, plumbing, HVAC and gas fitting. It offers limited residential plumbing and residential HVAC licenses, and certifies backflow prevention workers, elevator mechanics and water well providers.

Read more

Electrical, plumbing and mechanical permits and inspections are handled by the local building department under the USBC. Virginia does not run a separate state electrical inspection program.

State programs that can affect your permit

Onsite sewage systems and private wells (Virginia Department of Health)

Homes on a septic system or private well need permits through the Virginia Department of Health. Applications go through the local health department, separate from the building permit.

Official page: vdh.virginia.gov ↗

Manufactured Home Safety Regulations

DHCD is the state agency for HUD's manufactured housing program and enforces the Virginia Manufactured Home Safety Regulations (13VAC5-95). These apply federal construction and installation standards and require installers to hold a DPOR license. Local building departments handle permits and inspections for setting up a home.

Official page: law.lis.virginia.gov ↗

Verified October 28, 2026 against Virginia sources. Virginia permit rules, sources and other counties

Common projects in Campbell County

Virginia has statewide rules on file for 6 of these projects; they apply in Campbell County along with local permit requirements.

Named in Campbell County’s exemption summary (read it before assuming the work is exempt): Electrical work · Plumbing work · Floodplain development · Window and door replacement

Guides for other projects: Decks · Heating and air conditioning · Rooftop solar · Demolition · Septic systems · Driveways and culverts · Kitchen and bathroom remodels · Home additions and garages · All 21 project guides

Other permits you may need in Campbell County

These are separate from the building permit and come from the agencies named, under Virginia rules.

  • Septic system

    Virginia Department of Health (VDH), through local health departments

    Onsite sewage system construction permits are issued by VDH through local health departments under the Sewage Handling and Disposal Regulations (12VAC5-610). Since August 11, 2019, every application for an onsite sewage system or private well must include site evaluation and design work by a private-sector consultant licensed through DPOR, unless the owner qualifies for VDH services under income or hardship guidelines.

    Read more

    After installation the system is inspected, and VDH issues an operation permit before the system can be used; VDH does not require any septic inspection when a property is bought or sold.

    Official page: vdh.virginia.gov ↗ · Septic permit guide

  • Floodplain development

    Virginia Department of Conservation and Recreation (DCR)

    DCR's Floodplain Management Program is Virginia's designated coordinating agency for the National Flood Insurance Program and assists local floodplain administrators with ordinances, permit processes and flood maps. Floodplain development permits are issued by the county, city or town under its local floodplain ordinance.

    Official page: dcr.virginia.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Virginia Department of Transportation (VDOT)

    Building a private or commercial entrance (driveway) onto a road in the state highway system requires a VDOT Land Use Permit, as does modifying an existing entrance because of a change in land use, traffic volume or type of traffic.

    Read more

    Permits are usually obtained from the VDOT district or residency office serving the locality, and entrances are reviewed under VDOT's access management regulations and standards. For streets maintained by a city or town, check with the locality.

    Official page: vdot.virginia.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Virginia DEQ and the local erosion and stormwater program

    Under the Virginia Erosion and Stormwater Management Act, land disturbance of 10,000 square feet or more (2,500 square feet or more in a Chesapeake Bay Preservation Area, including for a single-family home) needs an approved erosion control plan, or for a single-family home an agreement in lieu of a plan, and land-disturbance approval before work begins; localities may set lower thresholds (Va.

    Read more

    Code 62.1-44.15:34). Counties, cities and towns administer these programs, and disturbance of 1 acre or more, or less as part of a larger common plan of development or sale, may also require state construction stormwater permit coverage. Minor activities such as home gardens, individual home landscaping, repairs and maintenance are exempt.

    Official page: law.lis.virginia.gov ↗

  • Water well

    Virginia Department of Health (VDH), through local health departments

    No one may construct, alter, deepen or abandon a private well without a written construction permit from VDH, and a well may not be put into use without a VDH inspection statement (12VAC5-630-220). Within 30 days of completing the work, the owner, agent or water well systems provider must give the local health department a uniform water well completion report signed by the provider (12VAC5-630-310). Replacing a well pump or an equivalent well cap is not considered an alteration.

    Official page: law.lis.virginia.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Campbell County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 434-332-9596 if you are unsure.

Can I apply for a permit online in Campbell County?

Yes. The listing includes an online permit portal at co-campbell-va.smartgovcommunity.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Campbell County?

Campbell County Community Development publishes its fee schedule online (co.campbell.va.us). Look up your project type there, and ask the office at 434-332-9596 for an estimate if your project is not listed.

How do I look up past permits for an address in Campbell County?

Start with the SmartGov portal at co-campbell-va.smartgovcommunity.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 434-332-9596 for the file or send a public records request.

Can I check a contractor's license for work in Campbell County?

Yes, at dporweb.dpor.virginia.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Campbell County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Campbell County borders Amherst County, Appomattox County, Bedford County, Charlotte County, Halifax County, Lynchburg city, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Campbell County.