Beaver County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Beaver County Building Department and Planning & Zoning

For a project in or near Beaver County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Building Department: 435-438-6484; Building Official Kyle Blackner: 435-438-6483; Building Inspector Jared Gillins: 435-438-6406; fax: 435-438-6481

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Beaver County Building Department, 105 East Center Street, Beaver, UT 84713; mailing address: P.O. Box 1013, Beaver, UT 84713

Operating hours

Office: Monday-Thursday 8:00 a.m.-5:00 p.m.; Friday 8:00 a.m.-12:00 p.m. Field inspections: Monday-Thursday 7:00 a.m.-4:00 p.m.

Review expectation

The county says a complete permit application is usually issued within 14 business days, although special circumstances may take longer and fees must be paid before issuance. Work must start within 180 days after permit issuance or a new permit is required.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Beaver County

Who handles permitting for this jurisdiction?

Beaver County Building Department and Planning & Zoning is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Building Department: 435-438-6484; Building Official Kyle Blackner: 435-438-6483; Building Inspector Jared Gillins: 435-438-6406; fax: 435-438-6481.

How long might review take?

The county says a complete permit application is usually issued within 14 business days, although special circumstances may take longer and fees must be paid before issuance. Work must start within 180 days after permit issuance or a new permit is required.

How are inspections scheduled?

Request inspections through https://beavercounty.cityinspect.com/, email building@beaver.utah.gov, or call 435-438-6484. Give at least 24 hours' notice; the county says 24-48 hours is usually sufficient, with more notice needed for mountain locations. Required stages can include footings, foundation, underground plumbing/electrical, framing and rough trades, insulation, weather barrier/flashing, drywall or firewall, shower pan, exterior finish, gas piping, service panel, and final inspection. Results are emailed through CityInspect, and occupancy or a change of occupancy is prohibited until a certificate of occupancy is issued.

Which codes and exemptions should I review?

Residential: 2021 International Residential Code and 2021 residential energy provisions with Utah amendments, plus the 2006 Utah Wildland Urban Interface Code. Commercial: 2021 International Building, Plumbing, Mechanical, Fuel Gas, and Energy Conservation Codes; 2020 National Electrical Code; 2006 Utah Wildland Urban Interface Code; and 2009 ICC A117.1 accessibility standard, all with applicable Utah amendments. The county also publishes a typical valley roof snow load of 30 psf, engineer-determined loading above 6,200 feet, and 30-inch frost depth. A detached shed or other structure no larger than 200 square feet that has no electricity does not require a building permit; structures over 200 square feet do. The county otherwise lists permits for new buildings, additions, patio covers, pools, basement finishing, reroofing, garage conversions, stucco, changes of use, heating equipment, wood stoves/fireplaces, moving or demolition, water heaters, plumbing fixtures, irrigation, air conditioning, electrical service, and rewiring. Agricultural-permit treatment is limited to genuine agricultural structures on agricultural land and does not cover personal storage, RVs, boats, personal vehicles, or shops.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?