County Permit SearchU.S. compliance directory
TexasWillacy County

Administrative overview · FIPS 48489

Willacy County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Willacy County Building Inspection and Floodplain Administration

For a project in or near Willacy County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Building Inspector Robert Salinas: office 956-689-3393; cell 956-746-5708; fax 956-689-4817

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Willacy County Building Inspection, 576 West Main Avenue, Raymondville, TX 78580

Operating hours

Permit submissions at the Tax Office: Monday-Friday 8:00-11:30 a.m. and 1:00-4:00 p.m. The permit page states that fees are payable by cash or check only, with checks made payable to Willacy County TAC.

Review expectation

No fixed building-plan review or inspection turnaround is published. The county requires at least 48 hours' notice before the foundation inspection. An approved building application is subject to cancellation if work is suspended or abandoned for one year after work commences; underground/utility work must be completed within 90 days unless the county agrees otherwise.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Willacy County

Who handles permitting for this jurisdiction?

Willacy County Building Inspection and Floodplain Administration is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Building Inspector Robert Salinas: office 956-689-3393; cell 956-746-5708; fax 956-689-4817 and request the current application route before preparing a final submittal.

How long might review take?

No fixed building-plan review or inspection turnaround is published. The county requires at least 48 hours' notice before the foundation inspection. An approved building application is subject to cancellation if work is suspended or abandoned for one year after work commences; underground/utility work must be completed within 90 days unless the county agrees otherwise.

How are inspections scheduled?

Submit the completed application, recorded plat, deed, tax statement, site plan, floor plans, elevations, and any required engineered design at the Tax Office. Call the Inspection Department at 956-689-3393 at least 48 hours before pouring the foundation so the county can inspect property-line setbacks and finished-floor elevation. Work may not encroach on easements. Projects in Zones A, AE, AH, or AO require an approved floodplain-development permit and proposed-elevation certificate before clearance, followed by a finished-floor construction elevation certificate before final clearance. Separate electrical, plumbing/gas, mechanical, and OSSF permits and inspections apply; incomplete work, uncorrected deficiencies, or inaccessible work can trigger reinspection fees.

Which codes and exemptions should I review?

The county's current initial-application checklist identifies the 2012 International Residential Code, 2012 International Building Code, 2012 International Plumbing Code, 2012 International Mechanical Code, 2012 International Fuel Gas Code, 2012 International Fire Code, and 2011 National Electrical Code. The March 9, 2017 Floodplain Ordinance adopts the April 5, 2017 Willacy County Flood Insurance Study and FIRM data and requires a floodplain development permit in special-flood-hazard areas; an elevation certificate is required wherever a county construction permit is required. The county also issues OSSF, demolition, manufactured-home, moving, underground-utility, electrical, plumbing/gas, and mechanical permits and applies its subdivision regulations. Willacy County does not publish a minor or cosmetic-work exemption list. Its residential application affirmatively lists remodels, roof replacement, fences, storage buildings, carports, driveways, pools, foundation repair, fire-damage work, and moved-in structures among permit types, so applicants should not assume those projects are exempt. Floodplain rules apply to any structure or land located, altered, or changed in use within the ordinance's regulated special-flood-hazard areas, while a separate septic permit is required for OSSF installation.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?