Administrative overview · FIPS 48061

Cameron County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Cameron County Department of Transportation, Planning and Inspections / County Engineering and Public Health Environmental Health

For a project in or near Cameron County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

956-247-3516 (Building Permits); 956-247-3599 (Environmental Health/OSSF); 956-247-3500 (County Engineer)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Cameron County Building Permits and Public Health Environmental Health, 1390 W. Expressway 83, San Benito, TX 78586

Operating hours

Monday–Friday 8:00 AM–4:30 PM for the county building-inspection program; confirm counter availability before visiting.

Review expectation

N/A; Cameron County publishes application requirements and inspection stages but no standard building-plan review timeline. OSSF permit letters are issued after the Designated Representative reviews and inspects the submission.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Cameron County

Who handles permitting for this jurisdiction?

Cameron County Department of Transportation, Planning and Inspections / County Engineering and Public Health Environmental Health is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 956-247-3516 (Building Permits); 956-247-3599 (Environmental Health/OSSF); 956-247-3500 (County Engineer) and request the current application route before preparing a final submittal.

How long might review take?

N/A; Cameron County publishes application requirements and inspection stages but no standard building-plan review timeline. OSSF permit letters are issued after the Designated Representative reviews and inspects the submission.

How are inspections scheduled?

Submit the building permit application and plans to the Planning and Inspections Division at 1390 W. Expressway 83, San Benito, or contact 956-247-3516. County inspections include underground plumbing, foundation, framing, insulation, and final inspections; concealed work must not be covered before acceptance, and at least two whole business days’ notice is required for certain electrical inspections. After-hours requests must be submitted at least 72 hours in advance. For OSSF, obtain the building clearance letter, soil/site evaluation and design, submit the checklist to Environmental Health, and contact 956-247-3599; the Designated Representative issues the permit after review/inspection.

Which codes and exemptions should I review?

Cameron County’s Flood Damage Prevention and Building Regulations, adopted July 5, 2022 and amended through April 8, 2025, apply to all unincorporated areas. They incorporate FEMA’s February 16, 2018 Flood Insurance Study and FIRM/FBFM, county floodplain standards, applicable ICC and state codes, Cameron County Fire Marshal codes, NFPA 70 for electrical service, and the 2015 International Fuel Gas Code. The county requires the lowest finished floor generally 12 inches above BFE or 24 inches above highest adjacent grade, whichever is higher, with coastal/floodway and utility requirements. OSSF work follows Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No broad cosmetic-work exemption is published. The county requires a building permit before development in its jurisdiction. Temporary structures have Type I and Type II permit categories with defined terms. Subdivision platting exceptions include agricultural/farm/ranch/wildlife/timber uses, qualifying family divisions of four or fewer parts, divisions where all lots exceed 10 acres, and other statutory exceptions, but exempt divisions still require an affidavit and may remain subject to site-development, floodplain, building, and OSSF rules. Emergency utility repairs may proceed with next-business-day written notice to the Floodplain Administrator.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?