Who issues permits
McLennan County Engineer's Office and Waco-McLennan County Public Health District OSSF Program is the county office listed for building permits in McLennan County.
How to get a permit in McLennan County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Fill in the application from waco-texas.com and submit it as the form directs.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
The OSSF permitting authority must approve or deny a complete application and planning materials within 30 days. The county residential program is notice-and-third-party-inspection based rather than prior plan approval. The floodplain form requires the foundation elevation certificate within 10 business days after foundation completion; the county publishes no standard flood-permit review duration. Floodplain appeals must be filed within 15 days, and Commissioners Court must decide within 30 days after the hearing.
Search McLennan County permit records
No online permit portal is listed, so permit history is kept by McLennan County Engineer's Office and Waco-McLennan County Public Health District OSSF Program. Call 254-757-5028 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
McLennan County Engineer's Office and Waco-McLennan County Public Health District OSSF Program publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
In unincorporated McLennan County, new residential structures and improvements that increase an existing residence's square footage or value by more than 50 percent must comply with the International Residential Code applicable in the county seat; Waco adopted the 2024 IRC effective January 1, 2026. The county requires notice and three independent phase inspections but has no prior residential approval or inspection authority. All unincorporated development must comply with the Flood Damage Prevention Order; structures in special flood hazard areas are generally elevated one foot above BFE and residential, commercial, and outbuilding encroachments are prohibited in the regulatory floodway. The Health District enforces Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285 for OSSF countywide.
Texas: partial statewide code. Details
Work that may not need a permit
The county residential-code notice/inspection law does not apply to manufactured or modular housing built off-site, and its penalties do not apply to an individual acting as their own contractor who intends to occupy the residence as their primary home. It targets new residences and improvements increasing square footage or value by more than 50 percent, so ordinary cosmetic work is outside that county notice program. Floodplain review and OSSF permits remain separate. A project outside the 100-year floodplain receives an exemption determination from the flood order; listed historic structures and certain health/safety-only improvements are excluded from the order's substantial-improvement calculation.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
For covered unincorporated residential construction, notify the County Engineer of the location, expected completion date, and IRC edition; obtain three inspections at different construction phases from qualified independent inspectors and submit their compliance notices to both the county and the client. For floodplain work, submit the current county permit form with plans and certifications; provide an elevation certificate within 10 business days after foundation completion. For OSSF work, submit the Health District packet with ownership, survey/plat or recorded exemption affidavit, site/soil evaluation, design, floodplain permit, and any aerobic affidavit/maintenance contract; call 254-299-2473 for required inspections and do not cover the system before approval.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Failure to obtain and file the required residential inspection reports is a Class C misdemeanor; the county may seek an injunction and refer the inspector or builder for discipline or prosecution, subject to the owner-builder primary-residence exception. Each day a flood-order violation continues is a separate Class C misdemeanor; Commissioners Court may obtain an injunction requiring removal of illegal improvements and restoration of prior conditions, a Texas Water Code civil penalty, or both. Current displayed OSSF charges include $200 residential and $300 commercial/non-single-family reinspections, plus enforcement under the county OSSF order and state law.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Texas rules that apply in McLennan County
These rules come from Texas law and state agencies, so they apply in McLennan County on top of anything the local office requires.
Building code
Partial statewide code
Local Government Code §214.212 adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code, applying to construction, alteration, remodeling, enlargement, and repair of residential structures in a municipality.
Read more
Cities may add, modify, or remove requirements through local amendments adopted by ordinance after a public hearing. §214.216 does the same for commercial buildings using the International Building Code (May 1, 2012). These codes do not apply to the installation and maintenance of electrical wiring (§214.213). Statewide, the residential energy code is the energy-efficiency chapter of the 2015 IRC, effective September 1, 2016 (Health and Safety Code §388.003).
Outside city limits
Outside city limits, Texas counties have limited building authority. Under Local Government Code Chapter 233, Subchapter F, a county that adopts an order opting in can require new single-family homes and duplexes (and additions that increase square footage or value by more than 50 percent) to conform to the IRC as published on May 1, 2008, or to the IRC that applies in the county seat.
Read more
The law does not require prior county approval before construction begins, and the county may not charge a fee to enforce the standards. Instead, the builder contracts for at least three inspections (foundation before concrete, framing and mechanical before drywall, and completion) by a licensed engineer, registered architect, TREC-licensed professional inspector, or other qualified inspector listed in the statute. The county may require notice before work starts and a report of the final inspection. On-site sewage (septic) permits are separate and required throughout the state.
Contractor and trade licensing
Texas abolished its Texas Residential Construction Commission on September 1, 2009, and our review of state sources found no state license for general or residential building contractors. The state does license trades: electricians and air conditioning and refrigeration contractors through TDLR, and plumbers through the Texas State Board of Plumbing Examiners.
Read more
Homeowners have state-law exemptions for some work on their own homes (see the trade section), but cities can still require permits and inspections.
Electrical, plumbing and HVAC
Electrical: TDLR says anyone who performs electrical work in Texas must be licensed, but Occupations Code §1305.003(a)(6) exempts work "not specifically regulated by a municipal ordinance" that is performed in or on a dwelling by a person who owns and lives in it.
Read more
City rules can override this exemption. Plumbing: plumbers are licensed by the Texas State Board of Plumbing Examiners, and a property owner does not need a license to do plumbing in their own homestead (§1301.051). HVAC: air conditioning and refrigeration contractors are licensed by TDLR, and the licensing chapter does not apply to work in a building owned solely by the person as their home (§1302.053). These exemptions cover state licensing only. Local permits and inspections may still be required.
State programs that can affect your permit
On-site sewage facilities (septic)
TCEQ rules require a permit and approved plan to construct, alter, repair, extend, or operate an on-site sewage facility. Permits are usually issued by a local authorized agent, often the county. Where no local authority exists, the TCEQ regional office issues them. The rules are in 30 TAC Chapter 285.
Statewide residential energy code
The State Energy Conservation Office administers the single-family energy code: Chapter 11 of the 2015 IRC, effective September 1, 2016. Outside city limits, compliance can be shown through an accredited program, inspections by code-certified inspectors, or a builder certification form (Health and Safety Code §388.004).
Floodplain management
Building in mapped flood hazard areas is subject to local floodplain management rules under the National Flood Insurance Program, and your community may require a floodplain development permit. The Texas Water Development Board's NFIP page notes that the state does not keep elevation certificates on file, but your local floodplain administrator should.
Verified October 28, 2026 against Texas sources. Texas permit rules, sources and other counties
Common projects in McLennan County
Texas has statewide rules on file for 5 of these projects; they apply in McLennan County along with local permit requirements.
Roof replacement
Texas Property Code §202.011 limits property owners' associations from prohibiting shingles designed to be wind or hail resistant, energy efficient, or solar generating, subject to conditions in the statute.
Texas source: tcss.legis.texas.gov ↗ · Roof replacement permit guide
Water heaters
A property owner does not need a state plumbing license to do plumbing in their own homestead (Occupations Code §1301.051). City permit and inspection requirements still apply.
Texas source: tcss.legis.texas.gov ↗ · Water heaters permit guide
Heating and air conditioning
State air conditioning and refrigeration licensing does not apply to work in a building owned solely by the person as their home (Occupations Code §1302.053). Other HVAC contractors need a TDLR license, and city permits still apply.
Texas source: tcss.legis.texas.gov ↗ · Heating and air conditioning permit guide
Electrical work
State law exempts electrical work on a dwelling by a person who owns and resides in it from state licensing, but only for work not specifically regulated by a municipal ordinance (Occupations Code §1305.003(a)(6)).
Read more
Cities can still require permits and licensed electricians. Texas Property Code §202.019 limits HOA restrictions on permanently installed standby electric generators.
Texas source: tdlr.texas.gov ↗ · Electrical work permit guide
Rooftop solar
Texas Property Code §202.010 generally prohibits property owners' associations from prohibiting or restricting the installation of solar energy devices. Exceptions allow HOAs to limit devices on common property, devices that extend above or beyond the roofline, devices in a fenced yard that are taller than the fence, and installations made without the association's prior approval, among others.
Texas source: tcss.legis.texas.gov ↗ · Rooftop solar permit guide
Named in McLennan County’s exemption summary (read it before assuming the work is exempt): Floodplain development
Guides for other projects: Decks · Fences · Sheds and accessory buildings · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · Septic systems · All 21 project guides
Other permits you may need in McLennan County
These are separate from the building permit and come from the agencies named, under Texas rules.
Septic system
TCEQ or its local authorized agent
A permit and approved plan are required to construct, alter, repair, extend or operate an on-site sewage facility (OSSF) under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. Most permits are issued by a local authorized agent of TCEQ (such as a county, city or health district), and the TCEQ regional office is the permitting authority where no local program is authorized; local rules can be stricter.
Read more
The process starts with a site evaluation, including a soil analysis, by a TCEQ-licensed site evaluator or professional engineer, and the permitting authority must approve or deny the application within 30 days.
Floodplain development
Texas Water Development Board (TWDB)
TWDB houses the state NFIP coordinator, and its Flood Community Assistance Program supports local floodplain management with training and technical help. Cities and counties in the NFIP adopt a flood damage prevention ordinance, and the local floodplain administrator issues floodplain development permits for work in the special flood hazard area.
Official page: twdb.texas.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Texas Department of Transportation (TxDOT)
A TxDOT permit is required before building an access connection (driveway) to a state highway, or before a change in property use or traffic that would trigger stricter access standards (43 TAC 11.52).
Read more
The TxDOT district engineer approves permits that meet the Access Management Manual, and an engineering study may be required. For county roads and city streets, check with the county or city.
Official page: law.cornell.edu ↗ · Driveway and culvert guide
Erosion and sediment control
Texas Commission on Environmental Quality (TCEQ)
Construction that disturbs 1 acre or more, or is part of a larger common plan of development or sale that will disturb 1 acre or more, needs coverage under TCEQ's Construction General Permit (TXR150000) if it discharges stormwater to surface water.
Read more
Operators must prepare and follow a Stormwater Pollution Prevention Plan (SWP3) before construction starts. Clearing or building in the Edwards Aquifer recharge and contributing zones may have additional requirements, handled by TCEQ regional offices.
Water well
Texas Department of Licensing and Regulation (TDLR)
TDLR licenses water well drillers and pump installers. Within 60 days after drilling, deepening or altering a well, the driller must send a State of Texas Well Report to TDLR, the well owner and the local groundwater conservation district, if there is one (16 TAC 76.70). Groundwater conservation districts set their own rules, so check with the district for your area.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the McLennan County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 254-757-5028 if you are unsure.
Can I apply for a permit online in McLennan County?
No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 254-757-5028 to ask how applications are accepted.
How much does a building permit cost in McLennan County?
McLennan County Engineer's Office and Waco-McLennan County Public Health District OSSF Program publishes its fee schedule online (waco-texas.com). Look up your project type there, and ask the office at 254-757-5028 for an estimate if your project is not listed.
How do I look up past permits for an address in McLennan County?
There is no online permit search for this listing. Ask the office at 254-757-5028 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.
Can I check a contractor's license for work in McLennan County?
Yes, at www2.tceq.texas.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
Which building code edition is cited for McLennan County?
The published code information cites the 2024 International Residential Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.
What if my property is near the McLennan County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. McLennan County borders Bell County, Bosque County, Coryell County, Falls County, Hill County, Limestone County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with McLennan County.