County Permit SearchU.S. compliance directory
TexasMcCulloch County

Administrative overview · FIPS 48307

McCulloch County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

McCulloch County Commissioners Court and OSSF Permitting

For a project in or near McCulloch County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

325-597-0733; County Judge's office: 325-597-0733 ext. 4

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

McCulloch County Courthouse, 199 Courthouse Square, Room 302, Brady, TX 76825

Operating hours

Monday-Friday, 8:00 a.m.-noon and 1:00 p.m.-5:00 p.m.

Review expectation

A complete OSSF application is subject to the 30-day approval-or-denial period in 30 TAC Chapter 285. For completed subdivision infrastructure, the county representative must inspect within 10 days of the developer's request and provide written approval or a deficiency notice within 10 days after inspection. A county driveway permit becomes void if the facilities are not built within six months.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for McCulloch County

Who handles permitting for this jurisdiction?

McCulloch County Commissioners Court and OSSF Permitting is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 325-597-0733; County Judge's office: 325-597-0733 ext. 4 and request the current application route before preparing a final submittal.

How long might review take?

A complete OSSF application is subject to the 30-day approval-or-denial period in 30 TAC Chapter 285. For completed subdivision infrastructure, the county representative must inspect within 10 days of the developer's request and provide written approval or a deficiency notice within 10 days after inspection. A county driveway permit becomes void if the facilities are not built within six months.

How are inspections scheduled?

Obtain the county OSSF application from the septic page or courthouse and call 325-597-0733 to coordinate application review and inspection; construction must await authorization and the system must remain uncovered until county inspection and approval to operate. A county-road driveway permit requires the permit holder to contact the designated county representative at least 24 hours before construction. After subdivision roads, drainage, or public facilities are complete, the developer must request final county inspection.

Which codes and exemptions should I review?

McCulloch County expressly states that it has no zoning requirements. It nevertheless requires county septic/OSSF, culvert, and right-of-way permits and enforces subdivision regulations for unincorporated development, including roads, drainage, utilities, water, wastewater, floodplain assessment, and OSSF provisions. The OSSF program incorporates Texas Health and Safety Code Chapter 366 and 30 TAC Chapters 30 and 285. No countywide ICC structural building-code edition was found. Because the county publishes no general structural building-permit or zoning program, it provides no cosmetic-work exemption list; septic, culvert, right-of-way, subdivision, and municipal requirements still apply. The subdivision rules list limited platting exceptions, including certain family/joint-owner partitions, transfers of rights-of-way or easements, qualifying political-subdivision floodplain transfers to adjacent owners, and tracts over 10 acres, but an exception from platting is not an exemption from OSSF or road permits. Confirm eligibility with the county before relying on an exception.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?