County Permit SearchU.S. compliance directory
TexasCoryell County

Administrative overview · FIPS 48099

Coryell County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Coryell County OSSF Office / Floodplain Administration / Development and Permitting Department

For a project in or near Coryell County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

254-213-6601 (County OSSF representative/development office); 254-248-4845 (Cody Wallace, technical advice); 254-865-5911 ext. 301 (county permit records)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Coryell County OSSF Office, 800 E. Main Street, Suite A, Gatesville, TX 76528; Development and Permitting Department, 3701 U.S. Highway 84 West, Gatesville, TX 76528; Courthouse, 620 E. Main Street, Gatesville, TX 76528

Operating hours

OSSF/Floodplain Office: Monday–Friday 8:00 AM–12:00 PM and 1:00–5:00 PM. Development and Permitting Department: Monday–Friday 7:30 AM–3:00 PM.

Review expectation

No fixed OSSF review timeline is published. The floodplain permit is valid for one year from issuance; the county’s subdivision regulations and application materials govern separate plat review timelines.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Coryell County

Who handles permitting for this jurisdiction?

Coryell County OSSF Office / Floodplain Administration / Development and Permitting Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 254-213-6601 (County OSSF representative/development office); 254-248-4845 (Cody Wallace, technical advice); 254-865-5911 ext. 301 (county permit records) and request the current application route before preparing a final submittal.

How long might review take?

No fixed OSSF review timeline is published. The floodplain permit is valid for one year from issuance; the county’s subdivision regulations and application materials govern separate plat review timelines.

How are inspections scheduled?

Submit the current Coryell County septic application with the applicable fee, site evaluation/design, property and 911 information, and required affidavit or maintenance documentation. Contact the county OSSF representative at 254-213-6601 or Cody Wallace at 254-248-4845 for technical advice and inspections. Floodplain applicants submit the development permit application, plans/specifications, and any required federal, state, or local permits. A floodplain permit is valid for one year and must be renewed if work is not completed.

Which codes and exemptions should I review?

Coryell County publishes no general county ICC building-code edition or ordinary building-permit portal. County permitting covers subdivisions, floodplain development, fence-row clearing, mailboxes, culverts/driveways, and utility excavation. The OSSF Order adopts 30 TAC Chapters 30 and 285 and Texas Health and Safety Code Chapter 366, and imposes the stricter local rule that every OSSF construction, alteration, extension, or repair must be permitted and inspected regardless of tract size. Floodplain development is reviewed through the county Development Permit Application and Flood Damage Prevention rules. An OSSF permit is required for all systems unless the system is grandfathered, meaning installed before September 1, 1989. Coryell County’s order does not provide a 10-acre exemption from its permit-and-inspection requirement. No general cosmetic-work exemption list was published; floodplain exemptions are determined by the Floodplain Administrator from the submitted property and flood-hazard information.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?