Lampasas County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Lampasas County Judge's Office OSSF Program and Floodplain Administrator

For a project in or near Lampasas County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

County Judge/OSSF office: 512-556-8271; Floodplain Administrator Joe England: 512-663-8364

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Lampasas County Judge's Office, 501 E. 4th Street, Suite 103, Lampasas, TX 76550

Operating hours

Operating hours not verified

Review expectation

A complete OSSF application is subject to the 30-day approval-or-denial period in 30 TAC Chapter 285. Complete county subdivision applications are reviewed within 30 days, with notice of missing items within 10 business days. No floodplain review timeline is published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Lampasas County

Who handles permitting for this jurisdiction?

Lampasas County Judge's Office OSSF Program and Floodplain Administrator is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact County Judge/OSSF office: 512-556-8271; Floodplain Administrator Joe England: 512-663-8364 and request the current application route before preparing a final submittal.

How long might review take?

A complete OSSF application is subject to the 30-day approval-or-denial period in 30 TAC Chapter 285. Complete county subdivision applications are reviewed within 30 days, with notice of missing items within 10 business days. No floodplain review timeline is published.

How are inspections scheduled?

Obtain or submit the current OSSF application through the County Judge's office at 512-556-8271 and coordinate required inspections with designated representative Jerry D. Harrison at jerry_h_2_o@yahoo.com. The application requires a soil/site evaluation, scaled system plan with setbacks, and other planning materials; floodplain sites require additional information. Soil-substitution and mound systems require two inspections and an additional $75 paid at the second inspection. Do not begin construction before approval. For floodplain review contact Joe England at 512-663-8364. No public online scheduler was found.

Which codes and exemptions should I review?

Lampasas County is a TCEQ-authorized OSSF agent under its TCEQ-approved February 2025 order, incorporating Texas Health and Safety Code Chapters 366 and 367, Texas Water Code Chapters 7, 26, and 37, and 30 TAC Chapters 30, 70, and 285. County-specific rules require an OSSF permit regardless of acreage; one acre of suitable surface area for a single-family OSSF served by public water, two acres without public water; 60 gallons per day in RV designs; and compliance with the county subdivision or manufactured-home order before OSSF approval. Contract administrator Joe England handles county floodplain administration under the county's flood-damage-prevention ordinance. No general county structural-building permit program or adopted county ICC code edition was found; the City of Lampasas separately enforces 2021 ICC codes and the 2020 NEC within city jurisdiction. Lampasas County expressly requires a permit for every OSSF regardless of acreage, eliminating the minimum state 10-acre exception locally. No county cosmetic structural-work exemption list is published because no general county structural permit program was found. Confirm floodplain clearance with the county administrator; incorporated cities impose their own building and floodplain requirements.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?