County Permit SearchU.S. compliance directory
TexasJohnson County

Administrative overview · FIPS 48251

Johnson County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Johnson County Development Services

For a project in or near Johnson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

817-556-6380; fax 817-556-6391

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Johnson County Annex, 2 N. Mill Street, Suite 305, Cleburne, TX 76033

Operating hours

Monday-Friday, 8:00 a.m.-11:45 a.m. and 1:00 p.m.-4:45 p.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Johnson County

Who handles permitting for this jurisdiction?

Johnson County Development Services is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 817-556-6380; fax 817-556-6391 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Email complete PDF applications and supporting documents to development@johnsoncountytx.org; photographs of documents are not accepted. The current residential packet requires the recorded deed, sealed survey or filed plat, assigned 911 address, site plan and project details, plus any applicable driveway, ETJ, floodplain, stormwater, well, or OSSF documentation. Development Services contacts the applicant after approval or if more information is needed. Obtain and visibly post the yellow permit before construction. For OSSF work, submit the applicable residential or commercial application and planning materials, await authorization, leave the installation uncovered, and coordinate the county inspection at 817-556-6380.

Which codes and exemptions should I review?

Johnson County requires a development permit before any new residential, commercial, or manufactured-home development begins in unincorporated areas. Its 2019 Flood Damage Prevention Order defines development broadly to include buildings, structures, mining, dredging, fill, grading, paving, excavation, drilling, storage, and floodplain fences; flood-zone projects may require form-board surveys and elevation certificates. Development Services also administers OSSF review and inspections under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285, plus the subdivision, drainage, infrastructure, road, right-of-way, stormwater, junkyard, and slaughterhouse requirements applicable to a project. The county expressly states that it does not require or perform general building-code inspections or issue certificates of occupancy; incorporated-city projects must follow the relevant municipality's building requirements. No countywide ICC structural-code edition is published. No general cosmetic-work exemption list is published. The county development permit applies to any new development in unincorporated Johnson County; an accessory development without plumbing has a separate reduced fee, not a permit exemption. Incorporated-city projects are directed to the municipality, and city extraterritorial-jurisdiction platting may also apply. OSSF permit exceptions under state minimum rules should not be assumed without Development Services confirmation, because local requirements and site conditions control.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?