Administrative overview · FIPS 48439
Tarrant County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
County
This county profile is the primary starting point for unincorporated-area permitting.
Responsible agency
Tarrant County Engineering Services Department and Tarrant County Fire Marshal
For a project in or near Tarrant County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
Engineering Services and OSSF: 817-884-1250; OSSF Wastewater Specialist: 817-212-7082; Floodplain: 817-884-1250; Fire Marshal: 817-838-4660
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
Tarrant County Engineering Services, 200 Taylor Street, Suite 305, Fort Worth, TX 76196; Tarrant County Fire Marshal, 2750 Premier Street, Fort Worth, TX 76111
Operating hours
Engineering Services: Monday-Friday 8:00 a.m.-5:00 p.m.; Fire Marshal: Monday-Friday 8:30 a.m.-4:30 p.m.
Review expectation
The Fire Code Official must issue or deny a complete construction-permit application within 30 days; if no action occurs in that period, it is approved for Fire Code purposes. A Fire Code permit becomes void unless construction starts within 180 days. The 2026 residential OSSF application is valid for one year from fee receipt; the county sends a payment request within two business days after receiving an application, but publishes no complete OSSF or floodplain review target.
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Tarrant County
Who handles permitting for this jurisdiction?
Tarrant County Engineering Services Department and Tarrant County Fire Marshal is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.
How should I begin an application?
Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Engineering Services and OSSF: 817-884-1250; OSSF Wastewater Specialist: 817-212-7082; Floodplain: 817-884-1250; Fire Marshal: 817-838-4660.
How long might review take?
The Fire Code Official must issue or deny a complete construction-permit application within 30 days; if no action occurs in that period, it is approved for Fire Code purposes. A Fire Code permit becomes void unless construction starts within 180 days. The 2026 residential OSSF application is valid for one year from fee receipt; the county sends a payment request within two business days after receiving an application, but publishes no complete OSSF or floodplain review target.
How are inspections scheduled?
For Fire Code projects, request inspections and the final Certificate of Compliance from the Fire Marshal at 817-838-4660; after a proper written request, the Fire Code Official must begin the inspection within five business days. Homes built for resale require three third-party inspections at different construction phases plus submission of the county's notice and inspection-compliance forms to TSPermitting@tarrantcountytx.gov. For floodplain inspections or permit coordination call Engineering Services at 817-884-1250. For OSSF work, submit the application, site/soil evaluation, plans, and fee, obtain authorization to construct, and coordinate the installation inspection through 817-212-7082 before covering or operating the system.
Which codes and exemptions should I review?
In unincorporated Tarrant County, the Fire Code requires construction permits for new construction or substantial improvement of commercial buildings, public-access buildings, multifamily dwellings with four or more units, and fire-protection systems. The FY2026 code incorporates the 2015 International Building Code, International Fire Code provisions with county amendments keyed to the 2021 IFC, the current NFPA 101 Life Safety Code for existing structures, and the State-adopted NFPA 70 electrical code. New residential structures and qualifying additions must follow the IRC published as of May 1, 2008 or the IRC version applicable in Fort Worth, but the county does not issue single-family residential building permits or certificates of occupancy. All FEMA-floodplain work requires a free floodplain permit, and new homes in the floodplain must be at least two feet above base flood elevation. OSSF work follows the county's TCEQ-authorized program and 30 TAC Chapter 285. Municipalities and city ETJs can impose additional requirements. Single-family residential work in unincorporated Tarrant County does not require a county building permit. The notice and three private-inspection reporting requirements apply to builders constructing homes for resale, not owners constructing a residence for their own occupancy. The Fire Code excludes an industrial facility with an OSHA-compliant fire brigade. Ordinary work outside a FEMA floodplain does not need a floodplain permit, but every kind of work within a mapped floodplain, including fill, does. OSSF exemptions are limited by the county program and state law; applicants should not assume the state 10-acre exception applies without county confirmation.