County Permit SearchU.S. compliance directory
TexasSomervell County

Administrative overview · FIPS 48425

Somervell County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Somervell County On-Site Sewage Facility Program / Floodplain Administrator

For a project in or near Somervell County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

254-898-3920

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Somervell County OSSF, 105 Sheppard Street, Glen Rose, TX 76043

Operating hours

Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

A permitting authority must approve or deny a complete OSSF permit application and planning materials within 30 days; no separate county floodplain or general building review time was published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Somervell County

Who handles permitting for this jurisdiction?

Somervell County On-Site Sewage Facility Program / Floodplain Administrator is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 254-898-3920.

How long might review take?

A permitting authority must approve or deny a complete OSSF permit application and planning materials within 30 days; no separate county floodplain or general building review time was published.

How are inspections scheduled?

Submit the county OSSF application and technical materials to the OSSF office, then contact Floodplain Administrator Brian Jones at 254-898-3920 or ossf@co.somervell.tx.us to coordinate authorization to construct and required inspections. The county's payment instructions state that authorization to construct is issued only after all required new-permit documents and payment are received. Contact the same office before floodplain development because no separate online flood inspection scheduler was published.

Which codes and exemptions should I review?

Somervell County administers its adopted On-Site Sewage Facility Order under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285, and applies its April 11, 2022 subdivision rules in unincorporated areas; subdivisions in the City of Glen Rose ETJ are approved by the city. The county participates in the NFIP for its unincorporated area and identifies Brian Jones as Floodplain Administrator, but no current county floodplain application or adopted countywide IRC/IBC edition was published on the official site. Incorporated Glen Rose maintains a separate municipal building-permit program. A qualifying single-family OSSF on a tract of at least 10 acres may be exempt only when all 30 TAC Chapter 285 conditions are met, including a licensed site evaluation, no nuisance or groundwater pollution, all system parts at least 100 feet from property lines, onsite effluent disposal, and only one dwelling on the tract; qualifying grandfathered systems and specified emergency repairs may also be exempt under state rules. The county subdivision rules list statutory platting exemptions for qualifying continued agricultural use, family transfers, Veterans' Land Board lots, government-owned land, certain further-development or partnership divisions, and divisions where every lot exceeds 10 acres, subject to the rules' stated exceptions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?