County Permit SearchU.S. compliance directory
TexasEdwards County

Administrative overview · FIPS 48137

Edwards County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Edwards County OSSF Program / Charles McDonald, Designated Representative

For a project in or near Edwards County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

OSSF Designated Representative Charles McDonald: 325-456-4607; Edwards County Judge’s Office: 830-683-6122

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

OSSF Designated Representative Charles McDonald, 4826 Red Oak Lane, San Angelo, TX 76904; Edwards County Courthouse, 100 W Main, Rocksprings, TX 78880

Operating hours

N/A; the county directs applicants to mail the application with payment to the Designated Representative and to contact the offices before visiting.

Review expectation

N/A; the county’s published OSSF page and application do not state a fixed local review timeline. State rules generally require approval or denial of complete OSSF materials within 30 days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Edwards County

Who handles permitting for this jurisdiction?

Edwards County OSSF Program / Charles McDonald, Designated Representative is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact OSSF Designated Representative Charles McDonald: 325-456-4607; Edwards County Judge’s Office: 830-683-6122 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the county’s published OSSF page and application do not state a fixed local review timeline. State rules generally require approval or denial of complete OSSF materials within 30 days.

How are inspections scheduled?

Complete the Edwards County OSSF application using a licensed soil/site evaluator or state-licensed engineer, then mail the application with payment to Charles McDonald, the county’s Designated Representative. The county representative performs required inspections; contact 325-456-4607 for scheduling and site-specific instructions.

Which codes and exemptions should I review?

No general Edwards County building-code edition was published on the reviewed county pages. County regulation is documented for OSSF permitting under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285; subdivision and land-development regulations also apply where relevant. The county’s reviewed OSSF materials do not publish a separate cosmetic-work exemption list. State OSSF exemptions may include qualifying 10-acre-rule systems, grandfathered systems, and defined emergency repairs reported within 72 hours; confirm applicability with the county Designated Representative.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?