County Permit SearchU.S. compliance directory
TexasEl Paso County

Administrative overview · FIPS 48141

El Paso County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

El Paso County Planning and Development / On-Site Sewage Facility Program

For a project in or near El Paso County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

El Paso County OSSF: 915-855-9664; County Judge: 915-273-3591; Planning and Development contact numbers vary by program

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

El Paso County OSSF Program, 14612 Greg Drive, El Paso, TX 79938; El Paso County Courthouse, 500 E San Antonio Street, Room 301, El Paso, TX 79901

Operating hours

N/A; contact the OSSF office at 915-855-9664 before visiting.

Review expectation

N/A; the reviewed El Paso County materials do not publish a fixed county review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for El Paso County

Who handles permitting for this jurisdiction?

El Paso County Planning and Development / On-Site Sewage Facility Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact El Paso County OSSF: 915-855-9664; County Judge: 915-273-3591; Planning and Development contact numbers vary by program and request the current application route before preparing a final submittal.

How long might review take?

N/A; the reviewed El Paso County materials do not publish a fixed county review timeline.

How are inspections scheduled?

For an unincorporated development, verify jurisdiction, floodplain status, potable water, sewer availability, and grading/drainage requirements before construction. For OSSF, submit the county application with a TCEQ-licensed evaluator or professional engineer site evaluation and use a licensed septic installer. The county requires grading/drainage approval and a passed final inspection for septic-related addressing; contact OSSF at 915-855-9664.

Which codes and exemptions should I review?

In unincorporated El Paso County, the county does not issue building permits or Certificates of Occupancy; ordinary building-permit questions are directed to the applicable Emergency Service District or municipality. County land-development controls include floodplain permits, grading/drainage plans, subdivision regulations, and OSSF requirements under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. The county FAQ states no county permit is required for roofing or solar-panel installation in unincorporated areas, subject to municipal rules where applicable. A septic system still requires county OSSF approval when required, and grading/drainage plans are required for septic installation on land of 10 acres or less. No broader cosmetic-work list was published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?