County Permit SearchU.S. compliance directory
TexasUvalde County

Administrative overview · FIPS 48463

Uvalde County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Uvalde County Sanitation Office and Uvalde County Floodplain Administration

For a project in or near Uvalde County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Uvalde County Sanitarian Philip J. Packer: 830-900-6558; County Judge and Floodplain Administrator William Mitchell: 830-278-3216

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Uvalde County Sanitation Office, 66 Military Lane, Box 9, Uvalde, TX 78801; Uvalde County Courthouse, Courthouse Plaza, 100 North Getty Street, Uvalde, TX 78801

Operating hours

Operating hours not verified

Review expectation

The local OSSF permitting authority must approve or deny complete planning materials and the permit application within 30 days under 30 TAC Chapter 285; a permit is not automatically approved merely because 30 days elapse. The county publishes no fixed floodplain-development, plat, or inspection-scheduling turnaround time.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Uvalde County

Who handles permitting for this jurisdiction?

Uvalde County Sanitation Office and Uvalde County Floodplain Administration is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Uvalde County Sanitarian Philip J. Packer: 830-900-6558; County Judge and Floodplain Administrator William Mitchell: 830-278-3216 and request the current application route before preparing a final submittal.

How long might review take?

The local OSSF permitting authority must approve or deny complete planning materials and the permit application within 30 days under 30 TAC Chapter 285; a permit is not automatically approved merely because 30 days elapse. The county publishes no fixed floodplain-development, plat, or inspection-scheduling turnaround time.

How are inspections scheduled?

Submit the county OSSF application, site evaluation, and planning materials to the Uvalde County Sanitation Office and call Philip J. Packer at 830-900-6558 to coordinate review and the required installation inspection. Do not begin construction before written Authorization to Construct or cover/operate the system before approval. For proposed unincorporated development in or near a mapped flood hazard area, contact County Judge/Floodplain Administrator William Mitchell at 830-278-3216 before work. Plat applications are available through the County Clerk and are routed through the County Judge and Commissioners Court under the county subdivision regulations.

Which codes and exemptions should I review?

Uvalde County administers on-site sewage facilities through its Sanitation Office under Texas Health and Safety Code Chapter 366 and 30 TAC Chapters 30 and 285. The County Judge is the county floodplain administrator for NFIP requirements governing development in unincorporated flood hazard areas. County subdivision regulations govern plats, roads, drainage, utilities, and related infrastructure. The county publishes no adopted general countywide IRC, IBC, electrical, plumbing, mechanical, or fire-code edition for ordinary construction; incorporated municipalities, including the City of Uvalde, maintain separate permitting and code requirements. Under current Texas OSSF rules, an otherwise compliant system serving the only single-family dwelling on a tract of at least 10 acres may be permit-exempt after evaluation by a licensed Site Evaluator or professional engineer if every component is at least 100 feet from property lines, effluent remains on the tract, and the system creates no nuisance or groundwater pollution. Listed emergency repairs do not require an advance permit but must be reported to the permitting authority in writing within 72 hours after work begins. Grandfathering may apply to an unchanged, non-nuisance system installed before the local authorized program or September 1, 1989, whichever is earlier. The county publishes no general cosmetic-work or small-accessory-structure exemption from floodplain, subdivision, or municipal requirements.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?