Who issues permits
Santa Clara County Department of Planning and Development is the county office listed for building permits in Santa Clara County.
Also listed: Building Division.
How to get a permit in Santa Clara County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the Accela Citizen Access portal at aca.accela.com.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Search Santa Clara County permit records
The listing’s online portal is at aca.accela.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Santa Clara County Department of Planning and Development at (408) 299-5700. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Santa Clara County Department of Planning and Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
2025 California Building Code (2024 IBC); 2025 California Residential Code (2024 IRC); 2025 California Electrical Code (2023 NEC); 2025 California Mechanical Code (2024 IMC); 2025 California Plumbing Code (2024 IPC); 2025 California Fire Code (2024 IFC); 2025 California Green Building Standards Code (CALGreen); 2025 California Energy Code; and 2024 International Property Maintenance Code, with Santa Clara County amendments in Municipal Code Division C3.
California: statewide code. Details
Work that may not need a permit
County examples of work exempt from a building permit include one-story detached accessory structures such as sheds and playhouses not exceeding 120 sq. ft.; fences not over 7 ft. high; and retaining walls not over 4 ft. measured from the bottom of the footing to the top of the wall, unless supporting a surcharge. The complete exemptions are in current California Residential Code Section R105 and California Building Code Section 105. Electrical, plumbing, and mechanical permits may still be required.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Inspections are required for permitted work. Request through the VuSpex GO mobile app, the County Public Permit Portal, or by calling (408) 299-5700. Requests received before 3:00 p.m. on regular workdays generally receive next-day inspections; requests may be made up to five days in advance. Fire Prevention construction inspections use (408) 341-4420.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
County Ordinance Code Sections C1-67 and C1-70 prohibit performing permit-required work and using, occupying, or maintaining a structure without the required permit. County code enforcement may require legalization, correction, or abatement; the current County fee page separately publishes a Code Enforcement Fee Schedule. A universal double-fee amount was not stated in accessible current County sources, so exact penalties and correction fees depend on the case and permit type.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Not published online
We did not find these in the office’s online materials. Ask the office at (408) 299-5700 about:
- Review times: how long plan review currently takes. Not available for ordinary permit review; the County does not publish one standard plan-review timeline. A planning screening may be required before building review. Inspection requests submitted before 3:00 p.m. on regular workdays are generally scheduled for the next working day.
California rules that apply in Santa Clara County
These rules come from California law and state agencies, so they apply in Santa Clara County on top of anything the local office requires.
Building code
Statewide code
The 2025 California Building Standards Code (Title 24) has applied statewide since January 1, 2026. It includes the California Building Code (Part 2), California Residential Code (Part 2.5), California Electrical Code (Part 3), California Mechanical Code (Part 4), California Plumbing Code (Part 5), California Energy Code (Part 6), the new California Wildland-Urban Interface Code (Part 7), the California Existing Building Code (Part 10) and CALGreen (Part 11).
Read more
The building, residential, wildland-urban interface, fire and existing building parts are based on the 2024 International Codes. The electrical code is based on the 2023 National Electrical Code, and the plumbing and mechanical codes on the 2024 Uniform Plumbing and Mechanical Codes, all with California amendments. Cities and counties may adopt local amendments, usually stricter than Title 24, with findings that they are reasonably necessary because of local climatic, geological, topographical or environmental conditions. These amendments take effect only once filed with the Building Standards Commission or another appropriate state agency.
California Building Standards Commission (Department of General Services) ↗
Outside city limits
State law requires the building department of every city, county, or city and county to enforce Title 24 and the State Housing Law. In unincorporated areas, the county building department (often part of a planning, building or development services agency) issues building permits and does inspections.
Read more
Inside an incorporated city, the city's building department does. Septic systems, wells and coastal development permits often go through separate county or state offices.
Contractor and trade licensing
The Contractors State License Board (CSLB) licenses contractors statewide. Classifications include General Building (B), Residential Remodeling (B-2) and specialty trades such as Electrical (C-10), Plumbing (C-36), Warm-Air Heating, Ventilating and Air-Conditioning (C-20), Roofing (C-39) and Solar (C-46).
Read more
Since January 1, 2025 (AB 2622), the minor work exemption covers jobs under $1,000 in total labor and materials, up from $500. As of October 2026 the limit is still $1,000. The exemption does not apply if the work needs a building permit of any kind or the unlicensed person employs anyone on the job. Unlicensed people advertising for such work must say in the ad that they are not licensed. Owner-builders (Business and Professions Code section 7044) do not need a license. For improvements to an existing home, the home must be your principal residence, you must have lived there for the 12 months before the work is completed, the work must be done before any sale, and you can use the exemption on no more than two structures in any three-year period. For new homes built for sale, an owner-builder is limited to four or fewer structures a year using licensed subcontractors, with no limit if a licensed General Building (B) contractor does the work. Owner-builders who hire unlicensed helpers may be treated as employers. That can bring payroll tax and workers' compensation duties.
Electrical, plumbing and HVAC
California has no separate state license for plumbing or HVAC businesses. They are licensed as CSLB specialty contractors (C-36 Plumbing, C-20 Warm-Air Heating, Ventilating and Air-Conditioning), and electrical contractors hold a C-10 license.
Read more
Individual electricians who work for a C-10 contractor must also be certified by the Division of Labor Standards Enforcement (Department of Industrial Relations) under Labor Code section 108. Trade permits and inspections are handled by the local city or county building department, and owner-builders can do their own trade work on qualifying projects under the owner-builder exemption.
State programs that can affect your permit
Automated permitting for home solar (SB 379)
Most cities and counties must use an online, automated permitting platform that checks code compliance and issues permits in real time for residential solar systems up to 38.4 kW AC, and for battery storage paired with them. Larger jurisdictions had to comply by September 30, 2023 and those with 50,000 or fewer people by September 30, 2024. Cities under 5,000 people and counties under 150,000 people are exempt. The California Energy Commission says cities in those smaller counties may also be exempt.
Wildland-Urban Interface Code (Title 24, Part 7)
The 2025 code created a new California Wildland-Urban Interface Code. It is based on the International Wildland-Urban Interface Code and gathers the state's wildfire-resistant construction rules, including the old California Residential Code section R337, in one place. It applies to homes built in wildland-urban interface areas, and the residential code notes that it can apply even to work that is exempt from a building permit.
ADUs in the coastal zone
Within the coastal zone, ADUs need a coastal development permit as well as a building permit. State ADU law requires the local government to approve or deny an ADU coastal development permit within 60 days of a complete application, without a public hearing. Under AB 462 (2025), a locally approved coastal permit for an ADU-only or JADU-only project can no longer be appealed to the Coastal Commission.
Verified October 28, 2026 against California sources. California permit rules, sources and other counties
Common projects in Santa Clara County
California has statewide rules on file for 2 of these projects; they apply in Santa Clara County along with local permit requirements.
Rooftop solar
Most cities and counties must offer online, automated, real-time permitting for residential solar systems up to 38.4 kW AC and paired battery storage (SB 379). Small cities (under 5,000 people) and counties under 150,000 people are exempt.
California source: energy.ca.gov ↗ · Rooftop solar permit guide
Accessory dwelling units
State ADU law limits how cities and counties can regulate ADUs and junior ADUs. Local ADU ordinances must follow Government Code section 66314 (section 66333 for JADUs) and must not unduly restrict ADUs.
Read more
In the coastal zone, the local government must approve or deny the ADU's coastal development permit within 60 days of a complete application, without a public hearing.
California source: documents.coastal.ca.gov ↗ · Accessory dwelling units permit guide
Named in Santa Clara County’s exemption summary (read it before assuming the work is exempt): Fences · Sheds and accessory buildings · Heating and air conditioning · Electrical work · Plumbing work
Guides for other projects: Decks · Roof replacement · Water heaters · Pools and spas · Demolition · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides
Other permits you may need in Santa Clara County
These are separate from the building permit and come from the agencies named, under California rules.
Septic system
Local agencies (county environmental health departments) under the State Water Resources Control Board OWTS Policy
County environmental health departments and other local agencies issue septic (OWTS) permits under the State Water Board's OWTS Policy. Where the Regional Water Board has approved a Local Agency Management Program (LAMP), its local siting and design standards apply; otherwise the policy's statewide Tier 1 standards apply. Systems over 10,000 gallons per day fall outside the policy and go to the Regional Water Board.
Driveway and culvert
Caltrans (district encroachment permit offices); county public works for county roads
A driveway, mailbox or other encroachment in state highway right-of-way needs a Caltrans Encroachment Permit, applied for on the Standard Encroachment Permit Application (TR-0100) through the CEPS online system or the district office.
Read more
Fees depend on the work, and a deposit is usually due when you apply. Driveways onto county roads are permitted by the county.
Erosion and sediment control
State Water Resources Control Board and Regional Water Boards
Projects that disturb one acre or more of soil, or less if part of a larger common plan of development, need coverage under the statewide Construction Stormwater General Permit (Order 2022-0057-DWQ, effective September 1, 2023), enrolled through the SMARTS system. Projects in the Lake Tahoe Basin use a separate Lahontan Regional Water Board permit.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Santa Clara County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (408) 299-5700 if you are unsure.
Can I apply for a permit online in Santa Clara County?
Yes. The listing includes an online permit portal at aca.accela.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Santa Clara County?
Santa Clara County Department of Planning and Development publishes its fee schedule online (plandev.santaclaracounty.gov). Look up your project type there, and ask the office at (408) 299-5700 for an estimate if your project is not listed.
How do I look up past permits for an address in Santa Clara County?
Start with the Accela Citizen Access portal at aca.accela.com and search by address, parcel or permit number. If an older permit is not there, ask the office at (408) 299-5700 for the file or send a public records request.
Can I check a contractor's license for work in Santa Clara County?
Yes, at cslb.ca.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
Which building code edition is cited for Santa Clara County?
The published code information cites the 2024 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.
What if my property is near the Santa Clara County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Santa Clara County borders Alameda County, Merced County, San Benito County, San Mateo County, Santa Cruz County, Stanislaus County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Santa Clara County.
