Who issues permits

Santa Cruz County Community Development & Infrastructure is the county office listed for building permits in Santa Cruz County.

Also listed: Building Division; Unified Permit Center.

How to get a permit in Santa Cruz County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the portal at scceplanreview.santacruzcounty.us.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Santa Cruz County permit records

The listing’s online portal is at scceplanreview.santacruzcounty.us ↗. Look for its public search and try the property address, parcel number or permit number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Santa Cruz County Community Development & Infrastructure at (831) 454-2260. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Santa Cruz County Community Development & Infrastructure publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

2025 California Building Standards Code, effective January 1, 2026 and amended by Santa Cruz County: California Administrative Code Part 1; California Building Code Part 2; California Residential Code Part 2.5; California Electrical Code Part 3; California Mechanical Code Part 4; California Plumbing Code Part 5; California Energy Code Part 6; California Wildland-Urban Interface Code Part 7; California Historical Building Code Part 8; California Fire Code Part 9; California Existing Building Code Part 10; California Green Building Standards Code Part 11; and California Referenced Standards Code Part 12, with applicable County Code Chapters 12 and 13 amendments.

California: statewide code. Details

Work that may not need a permit

County guidance states that, subject to zoning, coastal, grading, environmental, and other approvals, exemptions include one-story detached accessory buildings up to 120 sq. ft. on a parcel with an existing single-family dwelling or garage; wood/metal fences up to 8 ft. and concrete/masonry fences up to 6 ft.; interior painting, papering, and similar finish work; retaining walls retaining no more than 3 ft. unless supporting surcharge or certain liquids; re-roofing of one-story structures under 120 sq. ft.; detached residential platforms, walks, and decks up to 200 sq. ft. and 30 inches above grade that are unattached and do not serve an egress door; movable cases/partitions up to 5 ft. 9 in.; certain temporary stage sets; wall-supported window awnings up to 36 inches; agricultural shade structures under 12 ft. and covered with shade cloth or flexible plastic; prefabricated pools under 18 inches deep and 5,000 gallons; certain fabric-covered structures up to 300 sq. ft.; grade-supported water tanks up to 5,000 gallons at a maximum 2:1 height-to-width/diameter ratio; and certain residential play structures. Exempt work remains subject to other applicable requirements.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Schedule inspections online by 3:00 p.m. at least one County business day before the requested date. Inspections generally run Monday-Thursday; Friday morning is limited to qualifying minor inspections and excludes final and complex inspections. Inspectors call between 8:00 and 9:00 a.m. on the inspection day with a typical two-to-three-hour window. Keep the permit card and approved plans on site; reinspection fees may apply when work, access, documents, or corrections are not ready. Inspection assistance: (831) 454-2077.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Santa Cruz County Code Chapter 12.01 makes it unlawful to conduct or maintain construction work without an approved permit available at the job site. The County’s current ePlan checklist states that work started without required permits is subject to additional fees to investigate and resolve the violation under County Code Chapter 1.12. The County may require an after-the-fact permit, correction, inspections, and final approval before occupancy; exact fees depend on the violation and project scope.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at (831) 454-2260 about:

  • Review times: how long plan review currently takes. Not available for a single standard review timeline. ePlan staff generally take 1-2 business days to verify a complete, properly formatted upload before routing; full review varies by project scope, agency holds, corrections, zoning, fire, environmental health, and coastal requirements.

California rules that apply in Santa Cruz County

These rules come from California law and state agencies, so they apply in Santa Cruz County on top of anything the local office requires.

Building code

Statewide code

The 2025 California Building Standards Code (Title 24) has applied statewide since January 1, 2026. It includes the California Building Code (Part 2), California Residential Code (Part 2.5), California Electrical Code (Part 3), California Mechanical Code (Part 4), California Plumbing Code (Part 5), California Energy Code (Part 6), the new California Wildland-Urban Interface Code (Part 7), the California Existing Building Code (Part 10) and CALGreen (Part 11).

Read more

The building, residential, wildland-urban interface, fire and existing building parts are based on the 2024 International Codes. The electrical code is based on the 2023 National Electrical Code, and the plumbing and mechanical codes on the 2024 Uniform Plumbing and Mechanical Codes, all with California amendments. Cities and counties may adopt local amendments, usually stricter than Title 24, with findings that they are reasonably necessary because of local climatic, geological, topographical or environmental conditions. These amendments take effect only once filed with the Building Standards Commission or another appropriate state agency.

California Building Standards Commission (Department of General Services) ↗

Outside city limits

State law requires the building department of every city, county, or city and county to enforce Title 24 and the State Housing Law. In unincorporated areas, the county building department (often part of a planning, building or development services agency) issues building permits and does inspections.

Read more

Inside an incorporated city, the city's building department does. Septic systems, wells and coastal development permits often go through separate county or state offices.

Contractor and trade licensing

The Contractors State License Board (CSLB) licenses contractors statewide. Classifications include General Building (B), Residential Remodeling (B-2) and specialty trades such as Electrical (C-10), Plumbing (C-36), Warm-Air Heating, Ventilating and Air-Conditioning (C-20), Roofing (C-39) and Solar (C-46).

Read more

Since January 1, 2025 (AB 2622), the minor work exemption covers jobs under $1,000 in total labor and materials, up from $500. As of October 2026 the limit is still $1,000. The exemption does not apply if the work needs a building permit of any kind or the unlicensed person employs anyone on the job. Unlicensed people advertising for such work must say in the ad that they are not licensed. Owner-builders (Business and Professions Code section 7044) do not need a license. For improvements to an existing home, the home must be your principal residence, you must have lived there for the 12 months before the work is completed, the work must be done before any sale, and you can use the exemption on no more than two structures in any three-year period. For new homes built for sale, an owner-builder is limited to four or fewer structures a year using licensed subcontractors, with no limit if a licensed General Building (B) contractor does the work. Owner-builders who hire unlicensed helpers may be treated as employers. That can bring payroll tax and workers' compensation duties.

Electrical, plumbing and HVAC

California has no separate state license for plumbing or HVAC businesses. They are licensed as CSLB specialty contractors (C-36 Plumbing, C-20 Warm-Air Heating, Ventilating and Air-Conditioning), and electrical contractors hold a C-10 license.

Read more

Individual electricians who work for a C-10 contractor must also be certified by the Division of Labor Standards Enforcement (Department of Industrial Relations) under Labor Code section 108. Trade permits and inspections are handled by the local city or county building department, and owner-builders can do their own trade work on qualifying projects under the owner-builder exemption.

State programs that can affect your permit

Automated permitting for home solar (SB 379)

Most cities and counties must use an online, automated permitting platform that checks code compliance and issues permits in real time for residential solar systems up to 38.4 kW AC, and for battery storage paired with them. Larger jurisdictions had to comply by September 30, 2023 and those with 50,000 or fewer people by September 30, 2024. Cities under 5,000 people and counties under 150,000 people are exempt. The California Energy Commission says cities in those smaller counties may also be exempt.

Official page: energy.ca.gov ↗

Wildland-Urban Interface Code (Title 24, Part 7)

The 2025 code created a new California Wildland-Urban Interface Code. It is based on the International Wildland-Urban Interface Code and gathers the state's wildfire-resistant construction rules, including the old California Residential Code section R337, in one place. It applies to homes built in wildland-urban interface areas, and the residential code notes that it can apply even to work that is exempt from a building permit.

Official page: dgs.ca.gov ↗

ADUs in the coastal zone

Within the coastal zone, ADUs need a coastal development permit as well as a building permit. State ADU law requires the local government to approve or deny an ADU coastal development permit within 60 days of a complete application, without a public hearing. Under AB 462 (2025), a locally approved coastal permit for an ADU-only or JADU-only project can no longer be appealed to the Coastal Commission.

Official page: documents.coastal.ca.gov ↗

Verified October 28, 2026 against California sources. California permit rules, sources and other counties

Common projects in Santa Cruz County

California has statewide rules on file for 2 of these projects; they apply in Santa Cruz County along with local permit requirements.

  • Rooftop solar

    Most cities and counties must offer online, automated, real-time permitting for residential solar systems up to 38.4 kW AC and paired battery storage (SB 379). Small cities (under 5,000 people) and counties under 150,000 people are exempt.

    California source: energy.ca.gov ↗ · Rooftop solar permit guide

  • Accessory dwelling units

    State ADU law limits how cities and counties can regulate ADUs and junior ADUs. Local ADU ordinances must follow Government Code section 66314 (section 66333 for JADUs) and must not unduly restrict ADUs.

    Read more

    In the coastal zone, the local government must approve or deny the ADU's coastal development permit within 60 days of a complete application, without a public hearing.

    California source: documents.coastal.ca.gov ↗ · Accessory dwelling units permit guide

Named in Santa Cruz County’s exemption summary (read it before assuming the work is exempt): Decks · Fences · Sheds and accessory buildings · Roof replacement · Pools and spas · Window and door replacement

Guides for other projects: Water heaters · Heating and air conditioning · Electrical work · Demolition · Plumbing work · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides

Other permits you may need in Santa Cruz County

These are separate from the building permit and come from the agencies named, under California rules.

  • Septic system

    Local agencies (county environmental health departments) under the State Water Resources Control Board OWTS Policy

    County environmental health departments and other local agencies issue septic (OWTS) permits under the State Water Board's OWTS Policy. Where the Regional Water Board has approved a Local Agency Management Program (LAMP), its local siting and design standards apply; otherwise the policy's statewide Tier 1 standards apply. Systems over 10,000 gallons per day fall outside the policy and go to the Regional Water Board.

    Official page: waterboards.ca.gov ↗ · Septic permit guide

  • Driveway and culvert

    Caltrans (district encroachment permit offices); county public works for county roads

    A driveway, mailbox or other encroachment in state highway right-of-way needs a Caltrans Encroachment Permit, applied for on the Standard Encroachment Permit Application (TR-0100) through the CEPS online system or the district office.

    Read more

    Fees depend on the work, and a deposit is usually due when you apply. Driveways onto county roads are permitted by the county.

    Official page: dot.ca.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    State Water Resources Control Board and Regional Water Boards

    Projects that disturb one acre or more of soil, or less if part of a larger common plan of development, need coverage under the statewide Construction Stormwater General Permit (Order 2022-0057-DWQ, effective September 1, 2023), enrolled through the SMARTS system. Projects in the Lake Tahoe Basin use a separate Lahontan Regional Water Board permit.

    Official page: waterboards.ca.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Santa Cruz County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at (831) 454-2260 if you are unsure.

Can I apply for a permit online in Santa Cruz County?

Yes. The listing includes an online permit portal at scceplanreview.santacruzcounty.us. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Santa Cruz County?

Santa Cruz County Community Development & Infrastructure publishes its fee schedule online (cdi.santacruzcountyca.gov). Look up your project type there, and ask the office at (831) 454-2260 for an estimate if your project is not listed.

How do I look up past permits for an address in Santa Cruz County?

Start with the portal at scceplanreview.santacruzcounty.us and search by address, parcel or permit number. If an older permit is not there, ask the office at (831) 454-2260 for the file or send a public records request.

Can I check a contractor's license for work in Santa Cruz County?

Yes, at cslb.ca.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Santa Cruz County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Santa Cruz County borders Monterey County, San Benito County, San Mateo County, Santa Clara County.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Santa Cruz County.