County Permit SearchU.S. compliance directory
VirginiaLoudoun County

Administrative overview · FIPS 51107

Loudoun County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Loudoun County Department of Building and Development

For a project in or near Loudoun County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

703-777-0220

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Loudoun County Government Center, 1 Harrison Street SE, 2nd Floor, Leesburg, VA 20175

Operating hours

Permitting and Land Development Counters: Monday-Friday, 8:30 a.m.-5:00 p.m.; Building Plan Review and Inspections office: Monday-Friday, 8:00 a.m.-4:00 p.m.

Review expectation

Residential intake/completeness check: 2-5 business days for county-typical decks, county-typical basements, and residential trades; up to 10 business days for other residential permits. After intake and fee payment, expected building review is 2 days for typical decks, basements, and trades, and 15 days for new construction, alterations, additions, and changes of use; associated zoning review is generally 2 or 10 days depending on type.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Loudoun County

Who handles permitting for this jurisdiction?

Loudoun County Department of Building and Development is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 703-777-0220.

How long might review take?

Residential intake/completeness check: 2-5 business days for county-typical decks, county-typical basements, and residential trades; up to 10 business days for other residential permits. After intake and fee payment, expected building review is 2 days for typical decks, basements, and trades, and 15 days for new construction, alterations, additions, and changes of use; associated zoning review is generally 2 or 10 days depending on type.

How are inspections scheduled?

Request, cancel, and view inspections in LandMARC. Inspections can be booked for the following workday or a future weekday, with a midnight cutoff for the following workday; they are performed Monday-Friday between 8:30 a.m. and 3:00 p.m. For help call 703-777-0220, option 1. Approved plans must be available on site, and reinspection fees may apply when work is not ready.

Which codes and exemptions should I review?

2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction Code, 2021 Virginia Existing Building Code, 2021 Virginia Property Maintenance Code, 2021 Virginia Residential Code, 2021 Virginia Plumbing Code, 2021 Virginia Mechanical Code, 2021 Virginia Fuel Gas Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Statewide Fire Prevention Code, 2020 National Electrical Code, and 2017 ICC/ANSI A117.1 accessibility standard. Virginia's statewide building-permit exemptions include qualifying low-voltage wiring; detached one-story tool/storage sheds, playhouses, and similar accessory structures under 256 square feet; qualifying tents up to 900 square feet with fewer than 50 occupants; fences up to 7 feet unless serving as a pool barrier; low retaining walls; and ordinary cosmetic or maintenance work. Loudoun requires a county zoning-only residential application for sheds under 256 square feet outside incorporated towns, so a building-code exemption does not eliminate zoning or other approvals.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?