VirginiaGreene County

Administrative overview · FIPS 51079

Greene County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Greene County Building Inspections Department

For a project in or near Greene County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

434-985-5204

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

40 Celt Road, Room 226, Stanardsville, VA 22973

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.; permit and inspection requests should be made by 4:00 p.m.

Review expectation

Detailed building permits may take 2-3 weeks to process.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Greene County

Who handles permitting for this jurisdiction?

Greene County Building Inspections Department is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 434-985-5204 and request the current application route before preparing a final submittal.

How long might review take?

Detailed building permits may take 2-3 weeks to process.

How are inspections scheduled?

Call 434-985-5204 or email inspections@gcva.us at least 2-3 days in advance with the permit number. Requests made less than 48 hours ahead will not be inserted into the next day's schedule, and requests should be submitted by 4:00 p.m. On the third Thursday morning of each month, staff training shifts scheduled inspections to the afternoon.

Which codes and exemptions should I review?

2021 Virginia Uniform Statewide Building Code, including the 2021 Virginia Construction Code, 2021 Virginia Residential Code, 2021 Virginia Existing Building Code, 2021 Virginia Property Maintenance Code, 2021 Virginia Energy Conservation Code, 2021 Virginia Mechanical Code, 2021 Virginia Plumbing Code, 2021 Virginia Fuel Gas Code, and 2020 NFPA 70 (National Electrical Code) Greene County expressly exempts residential accessory storage structures of 256 sq ft or less from building and zoning permits. State-code exemptions also cover qualifying farm buildings; low-voltage wiring; utility-equipment buildings not exceeding 150 sq ft; tents not exceeding 900 sq ft with 50 or fewer occupants; most non-pool fences; low retaining walls; small shallow pools; qualifying temporary residential ramps; and ordinary repairs such as paint, cabinets, floor coverings, same-opening windows/doors, and qualifying same-for-same fixtures. Other sheds, garages, decks, carports, oversized tents, generators, gas installations, basement finishing, demolition, and remodeling require permits.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?