County Permit SearchU.S. compliance directory
VirginiaBuckingham County

Administrative overview · FIPS 51029

Buckingham County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Buckingham County Building Inspections Office

For a project in or near Buckingham County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

434-969-4243; Permit Technician extension 2; Zoning 434-969-4242

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

13380 West James Anderson Highway, Buckingham, VA 23921

Operating hours

Monday-Friday 8:30 a.m.-4:30 p.m.; Building Official telephone availability stated as 7:00-9:00 a.m.

Review expectation

Ask the agency for its current review estimate

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Buckingham County

Who handles permitting for this jurisdiction?

Buckingham County Building Inspections Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 434-969-4243; Permit Technician extension 2; Zoning 434-969-4242 and request the current application route before preparing a final submittal.

How long might review take?

A typical review timeline was not verified. Ask the agency for its current completeness and review estimate.

How are inspections scheduled?

Use the County's official Schedule an Inspection page at https://www.buckinghamcountyva.org/departments/building_inspections/schedule_an_inspection.php or contact the Building Inspections Office at 434-969-4243. The permit holder must request footing, foundation, concrete-preparation, framing/fastener, electrical/mechanical/plumbing rough-in, energy-conservation, and final inspections before concealment or occupancy. A Virginia Department of Health well/septic completion statement must be on file before scheduling an applicable final inspection; site-built and modular homes also require the listed water, duct-leakage, blower-door, and radon documentation for occupancy.

Which codes and exemptions should I review?

Buckingham County's current application states that plans are reviewed under the 2021 Virginia Uniform Statewide Building Code. In 2026 this cycle includes the 2021 Virginia Construction, Residential, Existing Building, Plumbing, Mechanical, Fuel Gas, Energy Conservation, and Swimming Pool and Spa codes, the referenced 2020 National Electrical Code, and applicable Virginia fire, manufactured-building, industrialized-building, and amusement-device regulations. The application also requires separate zoning approval and, as applicable, Virginia Department of Health and VDOT driveway approvals. The County application identifies sheds and other shelter or storage structures greater than 256 square feet as permit work and provides a farm-structure affidavit route. Under the Virginia USBC, qualifying one-story detached storage sheds, playhouses, and similar accessory structures not exceeding 256 square feet; fences other than required safety or pool barriers; qualifying tents not exceeding 900 square feet with 50 or fewer occupants; certain low-voltage wiring; limited roof-decking replacement; and ordinary cosmetic repairs such as painting, wall covering, cabinetry, and floor covering are exempt. Bona fide farm structures may qualify for the statutory exemption, but zoning and other land-use approvals can still apply.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?