Who issues permits
Cache County Development Services Department is the county office listed for building permits in Cache County.
Also listed: Building Division.
How to get a permit in Cache County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Fill in the application from cachecounty.org and submit it as the form directs.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
The application page says approval normally takes 3-10 working days for average structures and 30-45 working days for larger commercial projects; the residential application cautions that review may take up to 14 days. Once paid, work must begin within 180 days, and a permit also expires if work is suspended or abandoned or more than 180 days pass between inspections; written extensions of up to 180 days may be granted for justifiable cause.
Search Cache County permit records
No online permit portal is listed, so permit history is kept by Cache County Development Services Department. Call 435-755-1650 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Cache County Development Services Department publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
2024 International Building Code; 2021 International Residential Code; 2024 International Plumbing Code; 2024 International Mechanical Code; 2024 International Fuel Gas Code; 2024 International Energy Conservation Code; 2023 National Electrical Code; and 2009 ANSI A117.1 accessibility standard, with statewide Utah amendments. Published local design criteria include at least 35 psf valley roof snow load, at least 100 psf in canyons and mountain areas, seismic design category D, 90 mph wind, and 30-inch frost depth. The division serves unincorporated Cache County and Amalga, Avon, Benson, Cornish, Cove, Hyrum, Millville, Paradise, Petersboro, Providence, Richmond, River Heights, Smithfield, Trenton, Wellsville, and the county areas; Clarkston, Hyde Park, Lewiston, Mendon, Newton, Nibley, North Logan, and Logan issue their own permits.
Utah: statewide code based on the 2024 IBC. Details
Work that may not need a permit
Cache County directs applicants to 2021 IRC Section R105 for work exempt from permit. That section includes ordinary painting, papering, tiling, carpeting, cabinets, countertops, and similar finish work; qualifying one-story detached accessory structures up to 200 square feet; fences no higher than 7 feet; qualifying low retaining walls, grade-supported small water tanks, sidewalks and driveways, qualifying shallow prefabricated pools, playground equipment, limited wall-supported awnings, and qualifying low detached decks. Separate trade-code exemptions may apply, but exempt work must still comply with code. A qualifying agricultural structure does not need a structural building permit after zoning clearance and a recorded Agricultural Exemption Acknowledgement and Non-Conversion form, but electrical, plumbing, or mechanical work requires a permit and the structure cannot later be converted to residential or commercial use without code review.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Call 435-755-1650 and press 1 by 3:30 p.m. on the business day before the requested inspection; at least 24 hours is mandatory and 2-3 days is recommended. Same-day inspections are not available, the paid permit number/address/owner and inspection type are required, and the project must be ready by 8:00 a.m. Do not cover work before approval. Typical stages include footing and steel, foundation, drain and water, rough plumbing/electrical/framing/mechanical, gas pressure, energy/insulation, lath or wallboard, chimney, stucco certification, and final. A signed Public Works/Fire District pre-occupancy checklist is required at final for unincorporated residential projects and certain accessory structures. A failed readiness visit may trigger the published $75 reinspection fee, payable before another inspection is scheduled.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
The chief building official may issue cease-and-desist orders for unlawful construction, revoke a permit issued in error, order utility service terminated where an unauthorized or code-violating use exists, and prevent occupancy until a certificate of occupancy is issued. The violator may also be assessed the county's investigation, service, injunction, court-order, and other enforcement costs plus additional fees authorized by adopted building codes. Under the county's general penalty, an ordinance violation is an infraction unless another provision makes it a misdemeanor; the published caps are $750 for an infraction and $1,000 and/or six months for a misdemeanor, with each day a separate offense. The current building schedule also lists a $75 reinspection fee and a $75 permit-renewal fee; no verified universal double-permit fee is published.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Utah rules that apply in Cache County
These rules come from Utah law and state agencies, so they apply in Cache County on top of anything the local office requires.
Building code
Statewide code
The State Construction Code is set out in Utah Code Title 15A. Since July 1, 2026 (2026 H.B. 65), it includes the 2024 IBC, IPC, IMC, IFGC, IECC and IEBC, plus the residential provisions of the 2024 Swimming Pool and Spa Code.
Read more
Homes are still built under the 2021 IRC, with Utah amendments (Utah Code 15A-3, Part 2). The 2023 NEC has been the electrical code since July 1, 2025, replacing the 2020 NEC. State law reviews the one- and two-family provisions only every second code cycle, which is why the IRC stays on the 2021 edition. Starting January 1, 2027, the statute also adopts the 2024 International Wildland-Urban Interface Code in place of the 2006 Utah WUI code. Except in narrow cases, a city, county or state agency may not enforce rules that are stricter than the State Construction Code on a subject it covers (15A-1-204(8)).
Outside city limits
The State Construction Code applies throughout the state, including unincorporated areas (Utah Code 15A-1-204). County building departments issue permits and do inspections there. Utah County's building division, for example, serves only the unincorporated parts of the county.
Read more
Structures used only for agriculture and not lived in are exempt from the code. They still need a permit if they are inside a city or town on less than 5 contiguous acres, or in a county-approved subdivision on less than 2 acres, unless the land is in an agriculture protection area. Electrical, plumbing and mechanical permits may still be required for them.
Contractor and trade licensing
DOPL licenses general building, residential and small commercial, general engineering, specialty, electrical, plumbing and HVAC contractors under the Construction Trades Licensing Act (Utah Code 58-55). Under 58-55-305, a sole owner may build up to one home per year, and no more than three in five years, on their own property for their own noncommercial use without a license.
Read more
The same applies to sheds, carports, detached garages and similar buildings that go with the home. Unpaid helpers working under the owner's direction are also exempt, but anyone else who would normally need a license must have one. Unlicensed handymen may do jobs under $7,000 (labor and materials). This does not cover electrical, plumbing, gas appliance, HVAC, fire sprinkler or radon mitigation work. Above $3,000, the handyman must file proof of liability insurance with DOPL. The Act is being reorganized on January 1, 2027 (2026 H.B. 40), and these exemptions move to section 58-55-110 with the same basic limits. When a building department issues a permit to an owner-builder, it must tell DOPL.
Electrical, plumbing and HVAC
DOPL licenses electricians and plumbers at the apprentice, journeyman and master levels, with separate residential journeyman and residential master licenses (Utah Code 58-55-301).
Read more
It also licenses electrical, residential electrical, plumbing, residential plumbing and HVAC contractors. There is no state electrical inspection program. Electrical, plumbing and mechanical permits and inspections are handled by the city or county building department under the State Construction Code. The owner-builder exemption covers trade work the owner does personally on their own home.
State programs that can affect your permit
Onsite wastewater (septic) systems
Septic systems fall under state rule R317-4, which local health departments administer. You must get a construction permit before building a system, and the plans must be prepared by someone certified under R317-11. This permit is separate from the building permit.
Verified October 28, 2026 against Utah sources. Utah permit rules, sources and other counties
Common projects in Cache County
Utah has statewide rules on file for 3 of these projects; they apply in Cache County along with local permit requirements.
Decks
Utah's IRC amendments exempt decks no more than 30 inches above grade at any point that need no guardrails and do not serve a required exit door. Retaining walls holding back less than 4 ft of unbalanced fill are also exempt, unless they support a surcharge (Utah Code 15A-3-202).
Also named in Cache County’s exemption summary.
Water heaters
Natural gas water heaters sold or installed in Utah must meet low-NOx emission limits (Utah Code 15A-6-102). Since July 1, 2026, the limits apply only in ozone or PM2.5 nonattainment areas. There is an exception when replacing a combination water and space heating unit of the same size if no compliant model is available. A replacement water heater still needs whatever permit your building department requires.
Accessory dwelling units
An internal accessory dwelling unit is a permitted use in any area zoned primarily residential (Utah Code 10-21-303, formerly 10-9a-530). Cities cannot regulate its size, lot size, frontage or internal connection.
Read more
They may prohibit a separate meter, require a rental permit, require an extra parking space, ban short-term rentals, and ban internal ADUs on lots of 6,000 sq ft or less or homes on a failing septic tank.
Utah source: le.utah.gov ↗ · Accessory dwelling units permit guide
Named in Cache County’s exemption summary (read it before assuming the work is exempt): Fences · Sheds and accessory buildings · Heating and air conditioning · Electrical work · Pools and spas · Plumbing work · Driveways and culverts
Guides for other projects: Roof replacement · Rooftop solar · Demolition · Septic systems · Floodplain development · Kitchen and bathroom remodels · Home additions and garages · Window and door replacement · All 21 project guides
Other permits you may need in Cache County
These are separate from the building permit and come from the agencies named, under Utah rules.
Septic system
Local health department (under Utah DWQ rules)
Onsite wastewater systems are permitted by the regulatory authority, which is the local health department having jurisdiction or the Utah Division of Water Quality, under Utah Admin. Code R317-4. A feasibility review based on a soil exploration pit (and a percolation test if required) comes first, plans must be prepared by a person certified under R317-11, and construction may not begin until a construction permit is issued.
Read more
The regulatory authority inspects the entire installation, including a watertightness test of each tank, before it is backfilled (R317-4-8).
Floodplain development
Utah Division of Emergency Management (DEM)
DEM's Floodplain Management Program supports Utah communities in the National Flood Insurance Program and acts as a liaison with FEMA. Communities that participate in the NFIP enforce development regulations, and the local floodplain manager issues or denies floodplain development permits.
Official page: floodhazards.utah.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Utah Department of Transportation (UDOT)
UDOT requires a Conditional Access Permit (CAP), which is the plan review of work in the UDOT right-of-way, whenever a driveway or local street connection to a state highway is requested, under access management rule R930-6.
Read more
Construction then needs a UDOT Encroachment Permit, applied for by a licensed and bonded contractor using the approved CAP plans within 1 year. For county roads and city streets, check with the county or city.
Official page: connect.udot.utah.gov ↗ · Driveway and culvert guide
Erosion and sediment control
Utah Division of Water Quality (DWQ)
Stormwater discharges from construction activity need UPDES permit coverage when clearing, grading and excavating disturb 1 acre or more, or less than 1 acre if part of a larger common plan of development or sale that will disturb 1 acre or more (R317-8-11). Sites under 5 acres may qualify for a low rainfall erosivity waiver.
Water well
Utah Division of Water Rights (State Engineer)
Water well drilling must be permitted by the Division of Water Rights and done by a licensed well driller, and drilling requires a valid authorization from the State Engineer, such as an approved application to appropriate water, shown on a Start Card (R655-4).
Read more
The driller must notify the State Engineer by submitting the Start Card before work begins and file a well log within 30 days after the work is completed.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Cache County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 435-755-1650 if you are unsure.
Can I apply for a permit online in Cache County?
No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 435-755-1650 to ask how applications are accepted.
How much does a building permit cost in Cache County?
Cache County Development Services Department publishes its fee schedule online (cachecounty.gov). Look up your project type there, and ask the office at 435-755-1650 for an estimate if your project is not listed.
How do I look up past permits for an address in Cache County?
There is no online permit search for this listing. Ask the office at 435-755-1650 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.
Can I check a contractor's license for work in Cache County?
Yes, at secure.utah.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
Which building code edition is cited for Cache County?
The published code information cites the 2024 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.
What if my property is near the Cache County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Cache County borders Box Elder County, Rich County, Weber County, Bear Lake County (Idaho), Franklin County (Idaho), Oneida County (Idaho).
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Cache County.