Administrative overview · FIPS 48413

Schleicher County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Schleicher County Commissioners Court/County Judge; Schleicher County OSSF Authorized Agent

For a project in or near Schleicher County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

County permit questions/County Judge office: 325-853-2593 or Stacey at 325-226-9237; OSSF Designated Representative Charles McDonald: 325-456-4607; courthouse: 325-853-1820

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Schleicher County Courthouse, 2 S Divide, Eldorado, TX 76936; OSSF Designated Representative, 4826 Red Oak Lane, San Angelo, TX 76904

Operating hours

County courthouse: Monday-Friday, 9:00 a.m.-noon and 1:00-5:00 p.m.; individual office hours may vary. OSSF Designated Representative hours: N/A.

Review expectation

No county-specific review time was published. Under Texas OSSF rules, the authorized agent must approve or deny a complete application and planning materials within 30 days; an approved Authorization to Construct is generally valid for one year.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Schleicher County

Who handles permitting for this jurisdiction?

Schleicher County Commissioners Court/County Judge; Schleicher County OSSF Authorized Agent is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact County permit questions/County Judge office: 325-853-2593 or Stacey at 325-226-9237; OSSF Designated Representative Charles McDonald: 325-456-4607; courthouse: 325-853-1820 and request the current application route before preparing a final submittal.

How long might review take?

No county-specific review time was published. Under Texas OSSF rules, the authorized agent must approve or deny a complete application and planning materials within 30 days; an approved Authorization to Construct is generally valid for one year.

How are inspections scheduled?

For an OSSF, contact Designated Representative Charles McDonald at 325-456-4607 for the county-specific application, Authorization to Construct, and inspection. Under the state rules, request final construction inspection at least five working days before the desired date, leave excavations open, and have the installer or registered apprentice present. Contact the County Judge's office at 325-853-2593 before work that may be in a regulated flood area. No online scheduler was found.

Which codes and exemptions should I review?

Schleicher County's official permit page states that its only adopted permit/regulation areas are subdivisions, pipeline or utility crossings of county roads, highway right-of-way driveway access, and septic systems. The county is a TCEQ-authorized OSSF agent and regulates septic systems under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. The current Texas floodplain administrator directory identifies the County Judge as county Floodplain Administrator. No 2026 countywide structural building, residential, or fire-code edition and no ordinary building-permit program were published. Because Schleicher County publishes no general unincorporated building-permit program, no county cosmetic or minor-building permit is listed; subdivision, road/right-of-way, OSSF, and floodplain requirements can still apply. State OSSF exceptions may cover a qualifying single-family system on at least 10 acres, qualifying grandfathered systems, and specified emergency repairs reported within 72 hours, but local authorized-agent rules may be stricter; obtain a written determination before relying on an exception.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?