County Permit SearchU.S. compliance directory
TexasIrion County

Administrative overview · FIPS 48235

Irion County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Irion County Judge and Floodplain Administrator / TCEQ Region 8 San Angelo OSSF Program

For a project in or near Irion County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Irion County Judge Molly Criner: 325-835-4361; County Clerk/subdivision intake: 325-835-2421; TCEQ Region 8 San Angelo: 325-655-9479; county Floodplain Administrator Bradley Fletcher: N/A

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Irion County Courthouse, 209 North Park View Street, Mertzon, TX 76941; TCEQ Region 8, 622 South Oakes Street, Suite K, San Angelo, TX 76903-7035

Operating hours

County Clerk/subdivision intake: Monday-Thursday, 8:00 a.m.-4:30 p.m., Friday, 8:00 a.m.-4:00 p.m.; TCEQ: Monday-Friday, 8:00 a.m.-5:00 p.m.

Review expectation

TCEQ must approve or deny a complete OSSF application and planning materials within 30 days. An approved MHRC plan must be recorded within 30 days after approval, but the county does not publish a typical initial subdivision, MHRC, or floodplain review duration.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Irion County

Who handles permitting for this jurisdiction?

Irion County Judge and Floodplain Administrator / TCEQ Region 8 San Angelo OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Irion County Judge Molly Criner: 325-835-4361; County Clerk/subdivision intake: 325-835-2421; TCEQ Region 8 San Angelo: 325-655-9479; county Floodplain Administrator Bradley Fletcher: N/A and request the current application route before preparing a final submittal.

How long might review take?

TCEQ must approve or deny a complete OSSF application and planning materials within 30 days. An approved MHRC plan must be recorded within 30 days after approval, but the county does not publish a typical initial subdivision, MHRC, or floodplain review duration.

How are inspections scheduled?

Submit subdivision or MHRC applications, supporting plans, and cashier's-check or money-order fees to the Irion County Clerk at the courthouse for review by the County Judge. MHRC construction and occupancy may not begin before plan approval; the county may inspect infrastructure during or after construction and issues the Certificate of Compliance only after conformance, which is required before utility service. Coordinate floodplain review with the County Judge's office and listed county Floodplain Administrator. For an OSSF under state jurisdiction, submit the TCEQ application and planning package to Region 8 and call 325-655-9479 to arrange required construction inspection before covering or operating the system.

Which codes and exemptions should I review?

Irion County adopted new Subdivision and Manufactured Home Rental Community Regulations on June 24, 2025 for unincorporated territory. They regulate plats, MHRC infrastructure, roads, drainage, stormwater and floodplain identification, water and sewer service, septic/OSSF planning, and utility connections. The current Texas Floodplain Administrator directory lists Bradley Fletcher for Irion County. The county publishes no general ordinary-building permit program, zoning ordinance, or adopted countywide ICC structural-code edition. In areas without a locally authorized OSSF agent, TCEQ Region 8 administers Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. No county cosmetic-work exemption list or general building permit is published. The 2025 regulations apply to nonexempt land divisions and manufactured-home rental communities in unincorporated Irion County; an owner claiming a statutory plat exemption should obtain the county's determination before selling lots or requesting utility service. State OSSF exceptions are limited to qualifying 10-acre single-family systems meeting every condition, qualifying grandfathered systems, and defined emergency repairs reported in writing within 72 hours. City of Mertzon requirements apply inside municipal jurisdiction.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?