County Permit SearchU.S. compliance directory
TexasRandall County

Administrative overview · FIPS 48381

Randall County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Randall County Road and Bridge; Amarillo Area Public Health District Environmental Health

For a project in or near Randall County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Randall County Road and Bridge/Floodplain: 806-655-3861; Amarillo Environmental Health OSSF: 806-378-9472; rural 911 addressing: 806-374-9800 extension 109

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Randall County Road and Bridge, 301 W. Highway 60, Canyon, TX 79015; Amarillo Environmental Health, 850 Martin Road, Amarillo, TX 79107

Operating hours

Randall County Road and Bridge: Monday-Thursday, 7:00 a.m.-5:00 p.m.; Amarillo Environmental Health inspection scheduling: Monday-Friday, 8:00 a.m.-4:30 p.m.

Review expectation

No county floodplain-development review time was published. The OSSF Authorization to Construct is valid for one calendar year, and the county subdivision regulations provide a 30-day action period for OSSF-related plat review. The Environmental Health page says public-record requests may take up to 10 days but does not publish a typical initial permit-review time.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Randall County

Who handles permitting for this jurisdiction?

Randall County Road and Bridge; Amarillo Area Public Health District Environmental Health is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Randall County Road and Bridge/Floodplain: 806-655-3861; Amarillo Environmental Health OSSF: 806-378-9472; rural 911 addressing: 806-374-9800 extension 109.

How long might review take?

No county floodplain-development review time was published. The OSSF Authorization to Construct is valid for one calendar year, and the county subdivision regulations provide a 30-day action period for OSSF-related plat review. The Environmental Health page says public-record requests may take up to 10 days but does not publish a typical initial permit-review time.

How are inspections scheduled?

Obtain the applicable Class A or Class B floodplain development permit from Randall County Road and Bridge before construction; floodplain building proposals require surveyor certification, and no work may begin before approval. For OSSF work, submit the application to ehealthOSSF@amarillo.gov, by mail, or in person. After Authorization to Construct, call 806-378-9472 between 8:00 a.m. and 4:30 p.m. at least one day before the desired inspection and provide the site address, permit number, and installer attendance information. Do not backfill until the system passes inspection. Public OSSF permit records are available in eBridge with username 'public', password 'publicuser', and cabinet 'AMARILLOEH'.

Which codes and exemptions should I review?

Randall County requires a floodplain development permit before construction and applies 44 CFR floodplain requirements and the Randall County Flood Damage Prevention Order. A Class A permit is required for all development outside the mapped 100-year floodplain and a Class B permit for property wholly or partly within it; regulated development includes buildings, excavation, fill, grading, paving, and storage. Residential development is prohibited in an identified floodway. Subdivision development is governed by the county's 2023 subdivision regulations. OSSFs are administered for Randall County by the Amarillo Area Public Health District under 30 TAC Chapter 285 and the county OSSF order. No general county structural building-code edition was published for ordinary unincorporated construction in 2026. No minor-structure, cosmetic-work, or acreage-based county development-permit exemption was published: the county says all development requires either a Class A or Class B permit. For the substantial-improvement calculation only, the floodplain order excludes minimum work needed to correct identified health or safety code violations and qualifying alterations to historic structures; these are not general permit waivers. The OSSF authority notes possible lot-size exceptions for lots platted before January 1, 1988, but still requires approval before installation, repair, replacement, or alteration.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?