TexasDeaf Smith County

Administrative overview · FIPS 48117

Deaf Smith County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Deaf Smith County Clerk / County OSSF Program

For a project in or near Deaf Smith County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Deaf Smith County Clerk/OSSF: 806-363-7077; OSSF contact Doug Patrick: 817-253-8777; County Judge: 806-363-7000

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Deaf Smith County Clerk, 235 E 3rd Street, Room 203, Hereford, TX 79045; Deaf Smith County Courthouse, 235 E 3rd Street, Hereford, TX 79045

Operating hours

Monday-Friday 8:00 a.m.-5:00 p.m., open during lunch (County Clerk/OSSF office)

Review expectation

N/A; the county’s published application does not state a fixed review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Deaf Smith County

Who handles permitting for this jurisdiction?

Deaf Smith County Clerk / County OSSF Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Deaf Smith County Clerk/OSSF: 806-363-7077; OSSF contact Doug Patrick: 817-253-8777; County Judge: 806-363-7000 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the county’s published application does not state a fixed review timeline.

How are inspections scheduled?

Submit the completed application and required soil/site evaluation and planning materials to the Deaf Smith County Clerk/OSSF office. The application authorizes a Deaf Smith County official to enter the property for site evaluation and OSSF investigation. Do not begin construction before Authorization to Construct; contact 806-363-7077 or Doug Patrick at 817-253-8777 for inspection scheduling.

Which codes and exemptions should I review?

The published county material is specific to OSSF permitting and does not identify a general county ICC building-code edition. The OSSF application uses TCEQ-0235 technical information and requires soil/site evaluation and planning materials consistent with Texas OSSF rules. No county cosmetic-work exemption list was published. OSSF applicants must submit the county application, legal-description verification, site evaluation, and applicable planning materials; any state-law exemptions must be confirmed with the county OSSF office.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?