Who issues permits
Kendall County Engineer's Office is the county office listed for building permits in Kendall County.
Also listed: Kendall County Fire Marshal's Office.
How to get a permit in Kendall County
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Fill in the application from kendallcountytx.gov and submit it as the form directs.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
Kendall County expressly states that it will approve or deny an OSSF application within 30 days of receipt. The county publishes no typical development- or Fire Code-permit review duration; review begins only after the Engineer determines the application is complete.
Search Kendall County permit records
No online permit portal is listed, so permit history is kept by Kendall County Engineer's Office. Call 830-249-9343 or visit Kendall County Engineer's Office, 400 E. Blanco Road, Boerne, TX 78006 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Kendall County Engineer's Office publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Kendall County's March 4, 2026 verification letter states that permits are required for all development in unincorporated areas, including buildings, structures, grading, paving, excavation, fill, storage, driveways, county right-of-way work, outdoor lighting, OSSFs, and residential or commercial site improvements inside or outside the floodplain. The Engineer's Office applies the amended Kendall County Development Rules, 2022 Flood Damage Prevention Order, dark-sky standards, road/drainage/infrastructure requirements, and OSSF rules under Texas Health and Safety Code Chapter 366 and 30 TAC Chapters 30 and 285. The Fire Marshal administers the county-amended 2021 International Fire Code and issues permits and occupancy/compliance certificates for covered multifamily and nonresidential development. The county has not adopted a single-family residential building code and has no zoning in unincorporated areas.
Texas: partial statewide code. Details
Work that may not need a permit
There is no broad minor-development exemption: the county's 2026 letter says all man-made site-development changes require permitting. Kendall County expressly requires an OSSF permit regardless of acreage, eliminating the state 10-acre permit exception, and requires professionally prepared planning materials for all systems. An access permit is no longer required for a driveway fronting a private road, although an address request and the separate development permit still apply. Single-family residences are outside the county building-code program but are not exempt from development, floodplain, septic, driveway/address, dark-sky, or other applicable permits.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Obtain the rural 911 address and county-road access permit first, then submit the development application, checklist, printed and PDF plans, dark-sky application, and any floodplain, drainage, well, septic, or commercial materials. Incomplete applications are not processed. For OSSF work, submit the county septic form, professionally sealed planning materials, site evaluation, and required recorded affidavit and maintenance contract for an aerobic system; await approval, call 830-331-8253 to schedule inspections, and leave the system uncovered. For covered Fire Code work, the engineer, architect, or ICC-certified building official performs sufficient construction inspections; at completion, email the signed/sealed final-inspection request to [email protected], after which the Fire Marshal calls to schedule the appointment.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
The development application prohibits starting well or septic installation until the development permit is approved and states that the permit is valid for one year and must be renewed if work is not completed. Knowingly or intentionally violating the county Development Rules is a Class B misdemeanor punishable by up to 180 days in county jail, a fine up to $2,000, or both; the county may also seek an injunction and recover the cost of work needed to achieve compliance. The OSSF order incorporates applicable state civil and administrative penalties, and its reinspection fees are $150 for systems under 500 gpd and $300 for larger systems.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Texas rules that apply in Kendall County
These rules come from Texas law and state agencies, so they apply in Kendall County on top of anything the local office requires.
Building code
Partial statewide code
Local Government Code §214.212 adopts the International Residential Code as it existed on May 1, 2012 as the municipal residential building code, applying to construction, alteration, remodeling, enlargement, and repair of residential structures in a municipality.
Read more
Cities may add, modify, or remove requirements through local amendments adopted by ordinance after a public hearing. §214.216 does the same for commercial buildings using the International Building Code (May 1, 2012). These codes do not apply to the installation and maintenance of electrical wiring (§214.213). Statewide, the residential energy code is the energy-efficiency chapter of the 2015 IRC, effective September 1, 2016 (Health and Safety Code §388.003).
Outside city limits
Outside city limits, Texas counties have limited building authority. Under Local Government Code Chapter 233, Subchapter F, a county that adopts an order opting in can require new single-family homes and duplexes (and additions that increase square footage or value by more than 50 percent) to conform to the IRC as published on May 1, 2008, or to the IRC that applies in the county seat.
Read more
The law does not require prior county approval before construction begins, and the county may not charge a fee to enforce the standards. Instead, the builder contracts for at least three inspections (foundation before concrete, framing and mechanical before drywall, and completion) by a licensed engineer, registered architect, TREC-licensed professional inspector, or other qualified inspector listed in the statute. The county may require notice before work starts and a report of the final inspection. On-site sewage (septic) permits are separate and required throughout the state.
Contractor and trade licensing
Texas abolished its Texas Residential Construction Commission on September 1, 2009, and our review of state sources found no state license for general or residential building contractors. The state does license trades: electricians and air conditioning and refrigeration contractors through TDLR, and plumbers through the Texas State Board of Plumbing Examiners.
Read more
Homeowners have state-law exemptions for some work on their own homes (see the trade section), but cities can still require permits and inspections.
Electrical, plumbing and HVAC
Electrical: TDLR says anyone who performs electrical work in Texas must be licensed, but Occupations Code §1305.003(a)(6) exempts work "not specifically regulated by a municipal ordinance" that is performed in or on a dwelling by a person who owns and lives in it.
Read more
City rules can override this exemption. Plumbing: plumbers are licensed by the Texas State Board of Plumbing Examiners, and a property owner does not need a license to do plumbing in their own homestead (§1301.051). HVAC: air conditioning and refrigeration contractors are licensed by TDLR, and the licensing chapter does not apply to work in a building owned solely by the person as their home (§1302.053). These exemptions cover state licensing only. Local permits and inspections may still be required.
State programs that can affect your permit
On-site sewage facilities (septic)
TCEQ rules require a permit and approved plan to construct, alter, repair, extend, or operate an on-site sewage facility. Permits are usually issued by a local authorized agent, often the county. Where no local authority exists, the TCEQ regional office issues them. The rules are in 30 TAC Chapter 285.
Statewide residential energy code
The State Energy Conservation Office administers the single-family energy code: Chapter 11 of the 2015 IRC, effective September 1, 2016. Outside city limits, compliance can be shown through an accredited program, inspections by code-certified inspectors, or a builder certification form (Health and Safety Code §388.004).
Floodplain management
Building in mapped flood hazard areas is subject to local floodplain management rules under the National Flood Insurance Program, and your community may require a floodplain development permit. The Texas Water Development Board's NFIP page notes that the state does not keep elevation certificates on file, but your local floodplain administrator should.
Verified October 28, 2026 against Texas sources. Texas permit rules, sources and other counties
Common projects in Kendall County
Texas has statewide rules on file for 5 of these projects; they apply in Kendall County along with local permit requirements.
Roof replacement
Texas Property Code §202.011 limits property owners' associations from prohibiting shingles designed to be wind or hail resistant, energy efficient, or solar generating, subject to conditions in the statute.
Texas source: tcss.legis.texas.gov ↗ · Roof replacement permit guide
Water heaters
A property owner does not need a state plumbing license to do plumbing in their own homestead (Occupations Code §1301.051). City permit and inspection requirements still apply.
Texas source: tcss.legis.texas.gov ↗ · Water heaters permit guide
Heating and air conditioning
State air conditioning and refrigeration licensing does not apply to work in a building owned solely by the person as their home (Occupations Code §1302.053). Other HVAC contractors need a TDLR license, and city permits still apply.
Texas source: tcss.legis.texas.gov ↗ · Heating and air conditioning permit guide
Electrical work
State law exempts electrical work on a dwelling by a person who owns and resides in it from state licensing, but only for work not specifically regulated by a municipal ordinance (Occupations Code §1305.003(a)(6)).
Read more
Cities can still require permits and licensed electricians. Texas Property Code §202.019 limits HOA restrictions on permanently installed standby electric generators.
Texas source: tdlr.texas.gov ↗ · Electrical work permit guide
Rooftop solar
Texas Property Code §202.010 generally prohibits property owners' associations from prohibiting or restricting the installation of solar energy devices. Exceptions allow HOAs to limit devices on common property, devices that extend above or beyond the roofline, devices in a fenced yard that are taller than the fence, and installations made without the association's prior approval, among others.
Texas source: tcss.legis.texas.gov ↗ · Rooftop solar permit guide
Named in Kendall County’s exemption summary (read it before assuming the work is exempt): Septic systems · Driveways and culverts · Floodplain development
Guides for other projects: Decks · Fences · Sheds and accessory buildings · Pools and spas · Accessory dwelling units · Demolition · Plumbing work · Kitchen and bathroom remodels · All 21 project guides
Other permits you may need in Kendall County
These are separate from the building permit and come from the agencies named, under Texas rules.
Septic system
TCEQ or its local authorized agent
A permit and approved plan are required to construct, alter, repair, extend or operate an on-site sewage facility (OSSF) under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285. Most permits are issued by a local authorized agent of TCEQ (such as a county, city or health district), and the TCEQ regional office is the permitting authority where no local program is authorized; local rules can be stricter.
Read more
The process starts with a site evaluation, including a soil analysis, by a TCEQ-licensed site evaluator or professional engineer, and the permitting authority must approve or deny the application within 30 days.
Floodplain development
Texas Water Development Board (TWDB)
TWDB houses the state NFIP coordinator, and its Flood Community Assistance Program supports local floodplain management with training and technical help. Cities and counties in the NFIP adopt a flood damage prevention ordinance, and the local floodplain administrator issues floodplain development permits for work in the special flood hazard area.
Official page: twdb.texas.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Texas Department of Transportation (TxDOT)
A TxDOT permit is required before building an access connection (driveway) to a state highway, or before a change in property use or traffic that would trigger stricter access standards (43 TAC 11.52).
Read more
The TxDOT district engineer approves permits that meet the Access Management Manual, and an engineering study may be required. For county roads and city streets, check with the county or city.
Official page: law.cornell.edu ↗ · Driveway and culvert guide
Erosion and sediment control
Texas Commission on Environmental Quality (TCEQ)
Construction that disturbs 1 acre or more, or is part of a larger common plan of development or sale that will disturb 1 acre or more, needs coverage under TCEQ's Construction General Permit (TXR150000) if it discharges stormwater to surface water.
Read more
Operators must prepare and follow a Stormwater Pollution Prevention Plan (SWP3) before construction starts. Clearing or building in the Edwards Aquifer recharge and contributing zones may have additional requirements, handled by TCEQ regional offices.
Water well
Texas Department of Licensing and Regulation (TDLR)
TDLR licenses water well drillers and pump installers. Within 60 days after drilling, deepening or altering a well, the driller must send a State of Texas Well Report to TDLR, the well owner and the local groundwater conservation district, if there is one (16 TAC 76.70). Groundwater conservation districts set their own rules, so check with the district for your area.
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Kendall County office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 830-249-9343 if you are unsure.
Can I apply for a permit online in Kendall County?
No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 830-249-9343 to ask how applications are accepted.
How much does a building permit cost in Kendall County?
Kendall County Engineer's Office publishes its fee schedule online (kendallcountytx.gov). Look up your project type there, and ask the office at 830-249-9343 for an estimate if your project is not listed.
How do I look up past permits for an address in Kendall County?
There is no online permit search for this listing. Ask the office at 830-249-9343 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.
Can I check a contractor's license for work in Kendall County?
Yes, at www2.tceq.texas.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Kendall County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Kendall County borders Bandera County, Bexar County, Blanco County, Comal County, Gillespie County, Kerr County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Kendall County.
