Administrative overview · FIPS 48259
Kendall County permit authority
The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.
Jurisdictional status
County
This county profile is the primary starting point for unincorporated-area permitting.
Responsible agency
Kendall County Engineer's Office / Kendall County Fire Marshal's Office
For a project in or near Kendall County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.
Direct contact
County Engineer: 830-249-9343 (development/OSSF direct line 830-331-8253); Fire Marshal: 830-249-3721
Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.
Permit counter
Kendall County Engineer's Office, 400 E. Blanco Road, Boerne, TX 78006
Operating hours
County Engineer: Monday-Friday, 8:00 a.m.-4:00 p.m., closed 12:00 p.m.-1:00 p.m.
Review expectation
Kendall County expressly states that it will approve or deny an OSSF application within 30 days of receipt. The county publishes no typical development- or Fire Code-permit review duration; review begins only after the Engineer determines the application is complete.
Compliance workbench
Choose the next project decision.
Apply online
Open the verified digital gateway, application form, and review timeline.
Open guide →Fees & penalties
Understand fee schedules, enforcement exposure, and stop-work liabilities.
Open guide →Codes & exemptions
Read the code framework, minor-work exemptions, and inspection lane.
Open guide →Agency website
Visit the primary public source for current notices and contact changes.
Open guide →Source trail
Official sources for this profile
Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.
Project questions
Frequently asked questions for Kendall County
Who handles permitting for this jurisdiction?
Kendall County Engineer's Office / Kendall County Fire Marshal's Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.
How should I begin an application?
No verified online portal was located in the reviewed public materials. Contact County Engineer: 830-249-9343 (development/OSSF direct line 830-331-8253); Fire Marshal: 830-249-3721 and request the current application route before preparing a final submittal.
How long might review take?
Kendall County expressly states that it will approve or deny an OSSF application within 30 days of receipt. The county publishes no typical development- or Fire Code-permit review duration; review begins only after the Engineer determines the application is complete.
How are inspections scheduled?
Obtain the rural 911 address and county-road access permit first, then submit the development application, checklist, printed and PDF plans, dark-sky application, and any floodplain, drainage, well, septic, or commercial materials. Incomplete applications are not processed. For OSSF work, submit the county septic form, professionally sealed planning materials, site evaluation, and required recorded affidavit and maintenance contract for an aerobic system; await approval, call 830-331-8253 to schedule inspections, and leave the system uncovered. For covered Fire Code work, the engineer, architect, or ICC-certified building official performs sufficient construction inspections; at completion, email the signed/sealed final-inspection request to fire.marshal@co.kendall.tx.us, after which the Fire Marshal calls to schedule the appointment.
Which codes and exemptions should I review?
Kendall County's March 4, 2026 verification letter states that permits are required for all development in unincorporated areas, including buildings, structures, grading, paving, excavation, fill, storage, driveways, county right-of-way work, outdoor lighting, OSSFs, and residential or commercial site improvements inside or outside the floodplain. The Engineer's Office applies the amended Kendall County Development Rules, 2022 Flood Damage Prevention Order, dark-sky standards, road/drainage/infrastructure requirements, and OSSF rules under Texas Health and Safety Code Chapter 366 and 30 TAC Chapters 30 and 285. The Fire Marshal administers the county-amended 2021 International Fire Code and issues permits and occupancy/compliance certificates for covered multifamily and nonresidential development. The county has not adopted a single-family residential building code and has no zoning in unincorporated areas. There is no broad minor-development exemption: the county's 2026 letter says all man-made site-development changes require permitting. Kendall County expressly requires an OSSF permit regardless of acreage, eliminating the state 10-acre permit exception, and requires professionally prepared planning materials for all systems. An access permit is no longer required for a driveway fronting a private road, although an address request and the separate development permit still apply. Single-family residences are outside the county building-code program but are not exempt from development, floodplain, septic, driveway/address, dark-sky, or other applicable permits.