County Permit SearchU.S. compliance directory
TexasComal County

Administrative overview · FIPS 48091

Comal County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Comal County Engineer’s Office / Environmental Health Department / Fire Marshal’s Office

For a project in or near Comal County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

830-608-2090 (Engineer’s Office/Environmental Health); 830-608-2078 (fax)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Comal County Engineer’s Office and Environmental Health Department, 195 David Jonas Drive, New Braunfels, TX 78132

Operating hours

Monday–Friday, 8:00 AM–4:30 PM.

Review expectation

No single countywide building review timeline was published. OSSF permits may be renewed for $80 within 12 months or $150 after 12 months; the permit process requires complete planning materials and county approval before construction. The portal provides application and status handling online.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Comal County

Who handles permitting for this jurisdiction?

Comal County Engineer’s Office / Environmental Health Department / Fire Marshal’s Office is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 830-608-2090 (Engineer’s Office/Environmental Health); 830-608-2078 (fax).

How long might review take?

No single countywide building review timeline was published. OSSF permits may be renewed for $80 within 12 months or $150 after 12 months; the permit process requires complete planning materials and county approval before construction. The portal provides application and status handling online.

How are inspections scheduled?

Apply online through the Comal County permit portal or visit the Engineer’s Office. For OSSF, submit the county application/checklist, recorded deed, qualified site/soil evaluation, scaled design and specifications, required affidavit or maintenance contract, and applicable fee. The Authorization to Construct states the inspection stages; the installer must request the final inspection and not cover the system until approval. A failed or not-ready inspection incurs a $150 OSSF reinspection fee. Floodplain determinations and permits are handled by the Engineer’s Office at 830-608-2090.

Which codes and exemptions should I review?

In unincorporated Comal County, required county permits include OSSF, floodplain, private right-of-way/driveway, utility, Fire Marshal, and Camp Bullis Dark Skies permits as applicable. Commercial buildings, public buildings, and multifamily dwellings with four or more units may require a Comal County Fire Code permit. The Engineer’s Office reviews floodplain compliance with the Comal County Flood Damage Prevention Order and subdivision regulations. OSSF work must comply with Texas Health and Safety Code Chapter 366, 30 TAC Chapter 285, and county requirements; no separate county ICC edition was published. No general cosmetic-work exemption list was published. County permits are required before applicable construction in unincorporated areas; OSSF permits are required before building, altering, extending, operating, or making non-emergency repairs to a septic system. Limited TCEQ exceptions, including qualifying 10-acre single-family systems and defined emergency repairs, apply only when all state and local conditions are satisfied. Fire Code permit applicability depends on the project type and occupancy.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?