County Permit SearchU.S. compliance directory
TexasGregg County

Administrative overview · FIPS 48183

Gregg County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Gregg County Health Department / On-Site Sewage Facility Program

For a project in or near Gregg County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Health Department: 903-237-2621 or 903-237-2628; Bill Turner: 903-237-2628

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Gregg County Health Department, 405 E. Marshall Avenue, Longview, TX 75601; county main office, 101 E. Methvin Street, Longview, TX 75601

Operating hours

Operating hours not verified

Review expectation

N/A; the published checklist describes county review and approval but does not state a standard number of days.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Gregg County

Who handles permitting for this jurisdiction?

Gregg County Health Department / On-Site Sewage Facility Program is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact Health Department: 903-237-2621 or 903-237-2628; Bill Turner: 903-237-2628 and request the current application route before preparing a final submittal.

How long might review take?

N/A; the published checklist describes county review and approval but does not state a standard number of days.

How are inspections scheduled?

Obtain the county application, site evaluation/design, technical information, maintenance and water-conservation acknowledgement, and required supporting documents. After county review and approval, an Authorization to Construct is issued. Notify the Health Department at least one working day before covering the system for inspection; after a successful inspection, the county issues a Notice of Approval. A system may not be used until it is inspected and approved, and deficiencies must be corrected and re-inspected.

Which codes and exemptions should I review?

The verified Gregg County program is for on-site sewage facilities rather than a general county building-code office. It applies Texas Health and Safety Code Chapter 366, TCEQ 30 TAC Chapter 285, and county OSSF requirements; a permit and approved plan are required before an OSSF is constructed, altered, repaired, extended, or operated. The county checklist does not publish a broad cosmetic or minor-construction exemption list. Conventional systems generally require at least a 1/2-acre lot with community water or a 1-acre lot with a private well; older pre-January 1, 1988 platted lots should be referred to the Health Department. Aerobic, innovative, irregular, undersized, or substantially varied systems require additional professional documentation, an affidavit, and/or maintenance agreement.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?