County Permit SearchU.S. compliance directory
TexasFannin County

Administrative overview · FIPS 48147

Fannin County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Fannin County Environmental Development / Development Services

For a project in or near Fannin County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

Environmental Development/OSSF: 903-583-7495; Development Services: 903-449-4220

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Fannin County Environmental Development, 1203 E. Sam Rayburn Drive, East Annex, Bonham, TX 75418; courthouse: 101 E. Sam Rayburn Drive, Bonham, TX 75418

Operating hours

Operating hours not verified

Review expectation

N/A; the county requires review before Authorization to Construct, and the current application states permits are valid for one year from issue.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Fannin County

Who handles permitting for this jurisdiction?

Fannin County Environmental Development / Development Services is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact Environmental Development/OSSF: 903-583-7495; Development Services: 903-449-4220.

How long might review take?

N/A; the county requires review before Authorization to Construct, and the current application states permits are valid for one year from issue.

How are inspections scheduled?

Create an account and submit permitting materials and payment through MGO Online. For an OSSF, submit the application, site evaluation, technical/design documents, warranty deed, and required fee; Environmental Development must review them before Authorization to Construct. Confirm the ATC before beginning, then contact the office at least one working day before the required inspection before covering the system; a successful inspection results in Authorization to Operate.

Which codes and exemptions should I review?

The county materials identify local OSSF requirements under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285, plus Fannin County subdivision/development regulations; no general countywide ICC building-code edition was verified. No broad cosmetic-work exemption list was published. OSSF permits cover qualifying septic construction, repair, and alteration; state exemptions such as qualifying 10-acre-rule systems, grandfathered systems, and defined emergency repairs should be confirmed with the county.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?