County Permit SearchU.S. compliance directory
TexasCalhoun County

Administrative overview · FIPS 48057

Calhoun County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Calhoun County Floodplain Administration / County Designated Representative for OSSF

For a project in or near Calhoun County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

361-553-4455 (Floodplain Administration); 361-553-4411 (County Clerk)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Calhoun County Floodplain Administration, 211 S. Ann Street, Suite 301, Port Lavaca, TX 77979

Operating hours

N/A; the official county pages publish the office address and phone but no counter hours.

Review expectation

N/A; Calhoun County publishes a $60 development-permit fee and six-month permit validity but no standard review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Calhoun County

Who handles permitting for this jurisdiction?

Calhoun County Floodplain Administration / County Designated Representative for OSSF is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

No verified online portal was located in the reviewed public materials. Contact 361-553-4455 (Floodplain Administration); 361-553-4411 (County Clerk) and request the current application route before preparing a final submittal.

How long might review take?

N/A; Calhoun County publishes a $60 development-permit fee and six-month permit validity but no standard review timeline.

How are inspections scheduled?

Submit the development application to Floodplain Administration at 211 S. Ann Street, Suite 301, Port Lavaca, or contact 361-553-4455. AE/VE work requires the specified elevation, anchoring, utility, and flood-opening documentation; a finished-construction Elevation Certificate is due within 60 days. Utility connections cannot be made until the Floodplain Administrator approves compliance. OSSF permits and inspections are coordinated through a TCEQ-licensed professional installer and the Calhoun County Designated Representative.

Which codes and exemptions should I review?

Calhoun County's development permit requires compliance with the Calhoun County Flood Damage Prevention Order, Texas Building and Windstorm regulations, FEMA/NFIP requirements, and applicable AE/VE flood-zone standards. These include anchoring, flood-resistant materials, utilities above the base flood elevation, elevation certificates, flood openings in AE zones, pile/column foundations in VE zones, and restrictions on fill and construction seaward of mean high tide. The county's OSSF program operates through its County Designated Representative under Texas Health and Safety Code Chapter 366 and 30 TAC Chapter 285; no specific 2026 ICC edition is published. No county list of cosmetic or minor-work exemptions is published. The official application covers new construction, repairs, additions, remodeling, moving structures, utilities, grading/fill, and other development in regulated flood areas; approval requirements depend on the flood zone and applicable order. Calhoun County's local OSSF authority must be consulted for any state acreage or emergency exemption because no county exemption list was published.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?