The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Metropolitan Government of Nashville and Davidson County Department of Codes and Building Safety

For a project in or near Davidson County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

615-862-6500

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Metro Office Building, 800 President Ronald Reagan Way, 1st Floor, Codes Department, Nashville, TN 37210

Operating hours

Monday-Friday, 7:30 a.m.-4:00 p.m.; closed weekends

Review expectation

N/A; Metro states each reviewing department has its own processing timeframe and publishes no standard overall review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Davidson County

Who handles permitting for this jurisdiction?

Metropolitan Government of Nashville and Davidson County Department of Codes and Building Safety is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 615-862-6500.

How long might review take?

N/A; Metro states each reviewing department has its own processing timeframe and publishes no standard overall review timeline.

How are inspections scheduled?

Registered contractors schedule inspections through ePermits; homeowners should coordinate through Metro Codes/Building Division. Building inspection 615-862-6550; electrical 615-862-6560; plumbing and gas/mechanical 615-862-6570. An inspection checklist is issued with the permit, separate trade inspections are required, and a final Use and Occupancy Letter follows completed inspections.

Which codes and exemptions should I review?

2024 International Building Code, International Residential Code, Existing Building Code, Fuel/Gas Code, Mechanical Code, Plumbing Code, Swimming Pool and Spa Code, and Energy Conservation Code; 2023 National Electrical Code; 2017 ICC A117.1, all with Metro amendments. Normal maintenance repairs generally do not require a building permit, including painting, papering, window/door glazing, floor finishing, minor chimney/stair/porch/underpinning repairs, and roof repairs up to 33% of roof area. Fences generally do not require permits. Accessory structures 100 sq ft or more require permits; verify project-specific rules with Metro Codes.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?