County Permit SearchU.S. compliance directory
TennesseeCumberland County

Administrative overview · FIPS 47035

Cumberland County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Cumberland County Codes Department

For a project in or near Cumberland County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

931-710-5727

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

1760 S. Main Street, Crossville, TN 38555

Operating hours

Monday-Friday, 8:00 a.m.-4:30 p.m.

Review expectation

Mechanical, HVAC, gas-line and plumbing applications are stated to be reviewed within 2-3 business days. No separate building-plan review timeline was published.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Cumberland County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 931-710-5727.

How long might review take?

Mechanical, HVAC, gas-line and plumbing applications are stated to be reviewed within 2-3 business days. No separate building-plan review timeline was published.

How are inspections scheduled?

The permit holder must coordinate and schedule inspections in the required order through the iWorQ portal, by email at codes@cumberlandcountytn.gov, or by phone at 931-710-5727. Required stages include footing, slab, foundation, rough-ins, energy and final; a Certificate of Occupancy is required before occupancy. No inspection is scheduled without a permit. A $100 reinspection fee applies after two failed inspections per job site.

Which codes and exemptions should I review?

Effective January 1, 2024: 2018 IRC for residential construction; 2018 IBC, IFC, IPC, IMC, IFGC, IECC and NFPA 101 for commercial construction, with county amendments. The county’s adopted resolution retains selected 2009 IECC/IRC energy provisions and excludes residential electrical chapters; electrical permits/inspections are state-administered. Agricultural buildings are exempt from permits. Accessory buildings, garages and decks that are not part of new residential construction are also exempt under the county’s adopted building-code resolution. Confirm scope-specific exemptions with Codes before starting work.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?