Who issues permits
No countywide building permit office was identified for Horry County. The listing points to Horry County Code Enforcement, Building Inspection Branch. Inside city or town limits, the city or town issues building permits.
County authority applies to unincorporated Horry County, while incorporated municipalities may have separate permitting departments.
Outside city limits in South Carolina
Every county must enforce the state building codes (S.C. Code § 6-9-10), so outside city limits you get permits from the county building department. Inside a city or town, the municipality enforces the codes. Local governments may contract with each other for inspection services (§ 6-9-20).
More South Carolina rules below · Confirm with the office at 843-915-5090 before you build.
How to get a permit in Horry County
- Find the office for your address: the city or town if you are inside its limits; outside them, the South Carolina rule above decides.
- Apply online through the Tyler EnerGov Citizen Self Service portal at egweb.horrycounty.org, or with the published application forms.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
Residential one- and two-family plan review: approximately 5-7 days; new commercial buildings or additions: allow approximately 20 days for review.
Search Horry County permit records
The listing’s online portal is at egweb.horrycounty.org ↗ and runs on Tyler EnerGov Citizen Self Service. Use the portal’s Search to find permits, plans and inspections by permit number or address.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Horry County Code Enforcement at 843-915-5090. To follow your own application, search for its permit or application number.
Inside a city or town, permit records are kept by that municipality’s building department, not by Horry County.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
Horry County Code Enforcement publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Horry County lists South Carolina's mandatory 2021 code cycle: 2021 South Carolina/International Building, Residential, Fire, Plumbing, Mechanical, Fuel Gas, Existing Building, and Swimming Pool and Spa Codes with SC modifications; 2020 National Electrical Code with SC modifications; 2009 International Energy Conservation Code; and the latest ICC/ANSI A117.1 accessibility standard.
South Carolina: statewide code based on the 2021 IBC. Details
Work that may not need a permit
Horry County publishes a detailed R105.2/A105.2 list. Residential exemptions include qualifying one-story detached accessory buildings up to 200 square feet (zoning compliance still required), fences up to 7 feet, retaining walls up to 4 feet without surcharge, at-grade water tanks up to 5,000 gallons within the height/width ratio, sidewalks and driveways, painting/papering/tiling/carpeting/cabinets/countertops and similar finish work, prefabricated pools under 24 inches, swings/playground equipment, qualifying wall awnings, and detached decks up to 200 square feet and 30 inches above grade. Minor electrical, portable gas/mechanical equipment, and specified plumbing leak/stoppage repairs are also exempt; commercial accessory-building limits differ.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Use the Horry County Online Portal for inspection scheduling for Residential New, Residential Alteration, Residential Repair, Residential Townhouse, and Mobile Home New permits. For all other work classes, call 843-915-5090. The county requires the permit before work and additional review materials for floodplain projects; residential plans generally require five to seven days for review.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Horry County requires permits before construction, alteration, repair, moving, demolition, occupancy changes, and regulated trade work. County code materials provide that work started before the permit is obtained is subject to doubled permit fees, without relieving the violator of code compliance or other penalties; the county may issue a stop-work order. Reinspection fees can reach $100 for work not ready or corrections not made, and subsequent inspection fees apply.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
South Carolina rules that apply in Horry County
These rules come from South Carolina law and state agencies, so they apply in Horry County on top of anything the local office requires.
Building code
Statewide code
The 2021 South Carolina Building Codes have been in effect since January 1, 2023. They are the 2021 IBC, IRC, IFC, IPC, IMC and IFGC with South Carolina modifications, plus the 2020 NEC. On August 26, 2025 the Building Codes Council adopted the 2024 IBC, IRC, IFC, IPC, IMC and IFGC and the 2023 NEC, with modifications.
Read more
The modifications were published in the State Register on May 22, 2026, and the Council set January 1, 2027 as the date local jurisdictions must start enforcing them. Energy rules stay at the 2009 IECC, which is set by statute. Cities and counties may not adopt different mandatory codes. They may adopt the property maintenance, existing building, performance and swimming pool codes by local ordinance (§ 6-9-60), and they write their own administrative and permit procedures.
South Carolina Building Codes Council, Department of Labor, Licensing and Regulation (LLR) ↗
Contractor and trade licensing
The Contractor's Licensing Board licenses general and mechanical contractors for jobs where the total cost of construction is over $10,000 (S.C. Code § 40-11-30, raised from $5,000 in 2023). Mechanical licenses cover electrical, plumbing, air conditioning and similar work.
Read more
For homes up to three floors, the Residential Builders Commission licenses residential builders for jobs over $5,000. It licenses or registers residential specialty contractors for jobs over $500 (§ 40-59-20). Residential electricians, plumbers and HVAC installers need a license after an exam. Roofers, masons, carpenters, painters, siding, insulation, drywall, stucco and solar installers need a registration. Owner-builders are exempt if they do the work themselves, with their own employees or with licensed contractors, and the home is for their own or their family's use, not for sale or rent (§ 40-59-260; § 40-11-360(5)). The owner must personally sign the permit application and receive a disclosure statement. They must also record a notice with the register of deeds saying they built it as an unlicensed builder. A sale or rental within two years of completion is presumed to break the exemption.
Electrical, plumbing and HVAC
There is no separate state electrical or plumbing inspection program. Electrical, plumbing and mechanical permits and inspections are handled by the city or county building department under the state codes.
Read more
Trade contractors are licensed by LLR. On homes, the Residential Builders Commission licenses residential electricians, plumbers and HVAC installers/repairers for jobs over $500. For larger or commercial work, the Contractor's Licensing Board issues mechanical contractor licenses for jobs over $10,000, in classes such as electrical, plumbing and air conditioning.
State programs that can affect your permit
Onsite wastewater (septic) permits – Department of Environmental Services
Septic systems must be installed under construction and operation permits issued by the S.C. Department of Environmental Services (DES) after soil testing (S.C. Code § 44-55-825).
Coastal critical area permits – DES Division of Coastal Management
No one may fill, dredge, drain or build any structure in a coastal critical area without a permit from the Department of Environmental Services (S.C. Code § 48-39-130). Critical areas are coastal waters, tidelands, beaches and the beach/dune system. Waterfront projects such as docks, bulkheads and beachfront construction may need this permit in addition to a local building permit.
Manufactured Housing Board
The LLR Manufactured Housing Board licenses manufactured home dealers, manufacturers, installers, contractors and repairers. A manufactured home must be installed by a licensed installer (S.C. Code § 40-29).
Verified October 28, 2026 against South Carolina sources. South Carolina permit rules, sources and other counties
Common projects in Horry County
South Carolina has statewide rules on file for 5 of these projects; they apply in Horry County along with local permit requirements.
Decks
An owner of residential property who builds a deck of 200 sq ft or less that is no more than 30 inches above grade at any point is exempt from the building permit requirement (S.C. Code § 40-59-265).
Also named in Horry County’s exemption summary.
South Carolina source: scstatehouse.gov ↗ · Decks permit guide
Fences
An owner of residential property who builds a fence up to 7 ft high, or a retaining wall up to 4 ft high (bottom of footing to top, not supporting a surcharge), is exempt from the building permit requirement (S.C. Code § 40-59-265).
Also named in Horry County’s exemption summary.
South Carolina source: scstatehouse.gov ↗ · Fences permit guide
Sheds and accessory buildings
An owner of residential property who builds a one-story detached accessory structure of 200 sq ft or less is exempt from the building permit requirement and from builder licensing (S.C. Code § 40-59-265).
Also named in Horry County’s exemption summary.
South Carolina source: scstatehouse.gov ↗ · Sheds and accessory buildings permit guide
Electrical work
An owner doing only minor electrical work is exempt from the building permit requirement (S.C. Code § 40-59-265). This covers reinstalling plug receptacles (not adding outlets), replacing a breaker of the required size in the same spot, low-voltage wiring under 25 volts and 50 watts, and replacing lamps. New circuits and other electrical work need a permit.
Also named in Horry County’s exemption summary.
South Carolina source: scstatehouse.gov ↗ · Electrical work permit guide
Pools and spas
Prefabricated swimming pools less than 24 inches deep installed by the owner are exempt from the building permit requirement (S.C. Code § 40-59-265). Deeper pools need a permit.
Also named in Horry County’s exemption summary.
South Carolina source: scstatehouse.gov ↗ · Pools and spas permit guide
Named in Horry County’s exemption summary (read it before assuming the work is exempt): Heating and air conditioning · Plumbing work · Driveways and culverts
Guides for other projects: Roof replacement · Water heaters · Rooftop solar · Accessory dwelling units · Demolition · Septic systems · Floodplain development · Kitchen and bathroom remodels · All 21 project guides
Other permits you may need in Horry County
These are separate from the building permit and come from the agencies named, under South Carolina rules.
Septic system
South Carolina Department of Environmental Services (SCDES), Office of Onsite Wastewater and Enforcement
SCDES, which took over the environmental programs of the former DHEC on July 1, 2024, must issue a permit to construct and an approval to operate before a septic system is built, upgraded, expanded or operated (Regulation 61-56).
Read more
The site's soils are evaluated by certified department staff or a licensed Professional Soil Classifier, and the system layout is prepared by department staff, a South Carolina registered engineer or the soil professional who did the evaluation. The installer must schedule a final inspection (or self-inspect where allowed) before the system is covered, and the department then issues the approval to operate.
Floodplain development
South Carolina Department of Natural Resources (SCDNR), Flood Mitigation Program
The SCDNR Flood Mitigation Program administers the National Flood Insurance Program in South Carolina and assists participating communities with compliance. Floodplain development permits are reviewed and issued by each community's local NFIP administrator or floodplain manager, listed in SCDNR's Local NFIP Administrator's Directory.
Official page: dnr.sc.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
South Carolina Department of Transportation (SCDOT)
Any work within SCDOT-maintained right-of-way, including a single residential driveway, requires an SCDOT Encroachment Permit, applied for online through SCDOT's EPPS Next system. SCDOT charges no fee for encroachment permits and recommends a preliminary meeting with county or district SCDOT staff. For county or city roads, contact the county or municipality.
Erosion and sediment control
South Carolina Department of Environmental Services (SCDES)
Construction disturbing 1 acre or more, or less than 1 acre as part of a larger common plan of development or sale, needs NPDES stormwater permit coverage (Regulation 61-9.122.26). Under the state Stormwater Management and Sediment Reduction regulations (Regulation 72-300), land-disturbing activity generally needs an approved stormwater and sediment control plan, but a single-family home or its accessory buildings built separately, and not as part of multiple construction in a subdivision, is exempt from those plan requirements.
Water well
South Carolina Department of Environmental Services (SCDES)
A new or replacement individual residential or irrigation well needs coverage under the department's general permit, obtained by submitting a Notice of Intent before drilling, and the well driller must give 48 hours' notice of the installation (Regulation 61-44).
Read more
Wells must be built by a driller licensed by the SC Department of Labor, Licensing and Regulation, except owners drilling on their own property for personal use. The contractor must submit a water well record to the department within 30 days after completion (Regulation 61-71).
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does Horry County have a countywide building permit office?
No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, South Carolina law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.
Can I apply for a permit online in Horry County?
Yes. The listing includes an online permit portal at egweb.horrycounty.org. The agency also publishes application forms and a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Horry County?
Horry County Code Enforcement publishes its fee schedule online (horrycountysc.gov). Look up your project type there, and ask the office at 843-915-5090 for an estimate if your project is not listed.
How do I look up past permits for an address in Horry County?
Start with the Tyler EnerGov Citizen Self Service portal at egweb.horrycounty.org and search by address, parcel or permit number. If an older permit is not there, ask the office at 843-915-5090 for the file or send a public records request.
Can I check a contractor's license for work in Horry County?
Yes, at llr.sc.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Horry County line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Horry County borders Dillon County, Georgetown County, Marion County, Brunswick County (North Carolina), Columbus County (North Carolina), Robeson County (North Carolina).
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Horry County.
