County Permit SearchU.S. compliance directory
North CarolinaBrunswick County

Administrative overview · FIPS 37019

Brunswick County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Brunswick County Code Administration (Building Inspections, Central Permitting, and Fire Marshal)

For a project in or near Brunswick County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

910-253-2021, option 2 for building permit questions

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

75 Courthouse Drive, Building I, Bolivia, NC 28422

Operating hours

Monday-Friday, 8:30 a.m.-5:00 p.m.

Review expectation

N/A; the County does not publish a standard plan-review turnaround time.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Brunswick County

Who handles permitting for this jurisdiction?

Brunswick County Code Administration (Building Inspections, Central Permitting, and Fire Marshal) is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 910-253-2021, option 2 for building permit questions.

How long might review take?

N/A; the County does not publish a standard plan-review turnaround time.

How are inspections scheduled?

All inspections are scheduled through the Brunswick County Permit Portal. After approval, the applicant receives account setup information by email. The County residential guide describes footing, under-slab, foundation, rough-in, framing, insulation, floodplain, and final inspections; the final building inspection is generally last and a Certificate of Occupancy follows approval. Failed inspections incur a $75 reinspection fee after the second failure for the same inspection.

Which codes and exemptions should I review?

Brunswick County Code Administration oversees building and fire permitting and inspections under the North Carolina State Building Code and applicable County regulations. The current fee page links the County’s 2025 ICC Matrix, while current 2026 research indicates North Carolina’s 2018 State Building Code remains in effect pending delayed implementation of the 2024 Code. The County UDO governs development outside another governmental unit’s equal planning jurisdiction. A building permit is generally not required for nonstructural work costing less than $40,000 in a single-family residence, farm buildings outside the applicable jurisdiction, residential accessory structures with no dimension over 12 feet, residential replacement of windows, doors, or exterior siding, and replacement of pickets, railings, stair treads, or decking on residential porches and exterior decks. Minor plumbing-fixture repairs that do not disrupt supply, waste, or ventilation are exempt; certain same-voltage electrical fixture replacements and qualifying water-heater replacements are also exempt under the County’s stated conditions.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?