Who issues permits

No countywide building permit office was identified for Washington County. The listing points to Rhode Island Building Code Commission. Inside city or town limits, the city or town issues building permits.

Municipal building, zoning, and code-enforcement departments for Charlestown, Exeter, Hopkinton, Narragansett, New Shoreham, North Kingstown, Richmond, South Kingstown, and Westerly issue permits and conduct inspections.

Outside city limits in Rhode Island

Rhode Island has no unincorporated land and no county government. The five counties are only geographic and court districts. Every part of the state lies in one of the 39 cities and towns, and each one has a building official who issues permits and enforces the State Building Code. You always apply to the city or town where the property is.

More Rhode Island rules below · Confirm with the office at 401-364-1215 before you build.

How to get a permit in Washington County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the Rhode Island rule above decides.
  2. Fill in the application from charlestownri.gov and submit it as the form directs.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Search Washington County permit records

No online permit portal is listed, so permit history is kept by Rhode Island Building Code Commission. Call 401-364-1215 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Washington County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Rhode Island Building Code Commission publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

For 2026 work, Rhode Island State Building Code: 2021 editions of ICC codes with Rhode Island amendments, effective December 1, 2025; the adopted International Energy Conservation Code is the 2024 edition. Local officials also enforce municipal zoning, property-maintenance, floodplain, coastal, fire, wastewater, and land-use requirements.

Rhode Island: statewide code based on the 2021 IRC and 2021 IBC. Details

Work that may not need a permit

No countywide exemption list. Ordinary code-compliant repairs may be exempt only within the Rhode Island State Building Code definition; structural alterations, additions, new buildings, demolition, changes of occupancy, electrical, plumbing, mechanical, pools, decks, sheds, roofing/siding, and work in coastal or flood zones commonly require review or permits. Charlestown publishes separate accessory-structure, flood-zone, and inspection requirements; confirm the exact scope with the local official.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Narragansett does not schedule inspections through its online system: call 401-782-0619 one day ahead for electrical (Mon/Wed/Thu), plumbing/mechanical (Tue/Thu), or building inspections (24 hours ahead); a $50 reinspection fee applies after a failed inspection or missing permit card/plans. North Kingstown requires at least 24 hours' notice by calling 401-294-3331 ext. 301 or 303; same-day requests are not accommodated, with plumbing/mechanical generally Mon/Wed/Fri. Westerly requires applicants to call the office for all inspections and does not accept email requests.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Local officials may issue stop-work, correction, violation, or floodplain orders; require retroactive applications, plans, and inspections; deny occupancy; and pursue state or municipal enforcement. Narragansett may charge a $50 reinspection fee for failed inspections or missing required permit documentation, and North Kingstown may deny inspection services and assess reinspection fees when site-posting or scheduling requirements are not met. Exact penalties vary by municipality.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 401-364-1215 about:

  • Review times: how long plan review currently takes. Not available countywide; municipal review times vary with project completeness, zoning, coastal/floodplain review, septic or wastewater approvals, fire review, and state-agency requirements.

Rhode Island rules that apply in Washington County

These rules come from Rhode Island law and state agencies, so they apply in Washington County on top of anything the local office requires.

Building code

Statewide code

The Rhode Island State Building Code is a set of regulations in Title 510 of the Rhode Island Code of Regulations. The current versions took effect December 1, 2025. They adopt the 2021 IBC (SBC-1), the 2021 IRC for one- and two-family homes (SBC-2), the 2021 International Plumbing Code (SBC-3), the 2023 National Electrical Code (SBC-5) and the 2024 IECC for energy (SBC-8), each with Rhode Island amendments.

Read more

Before that date the state used the 2018 editions. Providence's building department says applicants could choose the older or newer code during a transition, and that parent permits approved under the 2018 code needed their related permits filed before March 1, 2026. The State Building Commissioner handles state-owned projects.

Rhode Island Building Code Commission (State Building Code Standards Committee and State Building Commissioner) ↗

Contractor and trade licensing

Anyone in the business of building, remodeling or repairing homes or commercial buildings must register with the Contractors' Registration and Licensing Board (CRLB). This includes subcontractors and handyman work such as roofing, siding, decks, fences, flooring and painting (R.I. Gen.

Read more

Laws ch. 5-65; 440-RICR-10-00-2). The CRLB says homeowners who live in their residence do not need to register. The statute exempts a person working on a single-unit property they own, or on their own residence, unless they are building it to sell (§ 5-65-2). For work that normally needs a licensed tradesperson, R.I. Gen. Laws § 23-27.3-113.3.1 lets the owner-occupant of a single-family home do it only if they get a permit, pass inspection, and do the work without help from others. Electrical, plumbing and HVAC trade licenses come from the Department of Labor and Training, not the CRLB.

Electrical, plumbing and HVAC

The Department of Labor and Training (DLT) licenses electricians, plumbers and HVAC/mechanical trades, and the CRLB sends those trades to DLT. State law lets the owner of a one- or two-family home install electrical work there if they live there or are about to move in (R.I. Gen.

Read more

Laws § 5-6-29). For single-family homes, § 23-27.3-113.3.1 also requires a permit, inspection and approval, and says the owner must do the work alone. Electrical, plumbing and mechanical permits and inspections come from the city or town building office under the State Building Code.

State programs that can affect your permit

Onsite wastewater treatment systems (RIDEM)

Installing, building, altering or repairing a septic system (OWTS) needs written approval of the plans from the Department of Environmental Management (250-RICR-150-10-6). Installers must be licensed. An owner may do the work on a home they occupy only with written permission and DEM's prior approval of the plans. A city or town may not issue a building permit until the required DEM approvals are in hand.

Official page: rules.sos.ri.gov ↗

Coastal Resources Management Council (CRMC)

CRMC issues permits for work within Rhode Island's coastal zone. Shoreline projects such as docks, seawalls and construction near the coast may need CRMC approval in addition to a local building permit. Contact CRMC early for waterfront property.

Official page: crmc.ri.gov ↗

Verified October 28, 2026 against Rhode Island sources. Rhode Island permit rules, sources and other counties

Common projects in Washington County

Rhode Island has statewide rules on file for 3 of these projects; they apply in Washington County along with local permit requirements.

Named in Washington County’s exemption summary (read it before assuming the work is exempt): Decks · Roof replacement · Heating and air conditioning · Electrical work · Demolition · Plumbing work

Guides for other projects: Water heaters · Rooftop solar · Accessory dwelling units · Septic systems · Driveways and culverts · Floodplain development · Kitchen and bathroom remodels · Home additions and garages · All 21 project guides

Other permits you may need in Washington County

These are separate from the building permit and come from the agencies named, under Rhode Island rules.

  • Septic system

    Rhode Island Department of Environmental Management (RIDEM), OWTS Program

    RIDEM approves onsite wastewater treatment system (OWTS) plans statewide under 250-RICR-150-10-6; no system may be installed, altered or repaired without RIDEM's written approval, and plans must be prepared by a licensed designer based on a soil evaluation.

    Read more

    Installation is done by a licensed installer (or an owner for their own permanent home, with written permission and approved plans), the designer inspects it and files a Certificate of Construction, and RIDEM must issue a Certificate of Conformance before the system is used or a certificate of occupancy is granted. A cesspool serving a property that is sold or transferred must be removed or abandoned within 12 months of the sale, with some exemptions.

    Official page: rules.sos.ri.gov ↗ · Septic permit guide

  • Floodplain development

    Rhode Island Emergency Management Agency (RIEMA), Statewide Floodplain Coordinator

    The Rhode Island One and Two Family Dwelling Code refers flood variance applications to the Rhode Island Emergency Management office's Statewide Flood-Plain Coordinator. Building in a flood hazard area goes through the local building permit, and outside coastal A zones and coastal high hazard areas the state code requires the lowest floor to be at or above the base flood elevation plus 1 foot, or the design flood elevation if higher.

    Official page: rules.sos.ri.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Rhode Island Department of Transportation (RIDOT)

    No driveway may connect to a state highway without a RIDOT Physical Alteration Permit, and the applicant must show that the city or town planning department has received the plans (290-RICR-20-00-4).

    Read more

    If the driveway crosses a state highway drainage ditch, the owner must install a culvert of at least 12 inches at their own expense. For a driveway on a city or town street, contact the municipality instead.

    Official page: rules.sos.ri.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Rhode Island Department of Environmental Management (RIDEM), RIPDES Program

    Under the Rhode Island Pollutant Discharge Elimination System (RIPDES) rules, construction that disturbs 1 acre or more, or less than 1 acre as part of a larger common plan of development or sale that will disturb 1 acre or more, needs stormwater permit coverage from RIDEM.

    Read more

    RIDEM's stormwater design standards (250-RICR-150-10-8) do not apply to single-family lots of record, which are covered by separate state guidance.

    Official page: rules.sos.ri.gov ↗

  • Water well

    Contractors' Registration and Licensing Board (CRLB) and Rhode Island Department of Health (RIDOH)

    Well drillers are licensed by the Contractors' Registration and Licensing Board, and within 10 days of completing a new, replacement or decommissioned well the licensed contractor must give the owner, the local building official and RIDOH a Well Completion Report (440-RICR-10-00-6).

    Read more

    The local building official verifies a new private water system before it goes into service, and RIDOH rules require the well water to be tested before a certificate of occupancy is issued and before the property is sold or transferred.

    Official page: rules.sos.ri.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Washington County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Rhode Island law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Washington County?

No online permit portal was found for this listing. The agency does publish application forms and a fee schedule online, which may need to be submitted by mail or in person. Contact the office at 401-364-1215 to ask how applications are accepted.

How much does a building permit cost in Washington County?

Rhode Island Building Code Commission publishes its fee schedule online (westerlyri.gov). Look up your project type there, and ask the office at 401-364-1215 for an estimate if your project is not listed.

How do I look up past permits for an address in Washington County?

There is no online permit search for this listing. Ask the office at 401-364-1215 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Washington County?

Yes, at crb.ri.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Washington County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Washington County borders Kent County, Newport County, New London County (Connecticut), Suffolk County (New York).

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Washington County.