County Permit SearchU.S. compliance directory
ConnecticutNew London County

Administrative overview · FIPS 09011

New London County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

Municipal Fallback

This profile identifies a handoff outside the county’s ordinary structural permitting lane.

Required jurisdiction check

Confirm the controlling local or state authority before filing.

The record is marked Municipal Fallback. That means the county profile should be treated as a routing brief: incorporated municipalities, a state building department, or a state fire marshal may control plan review, permits, and inspections. Contact the named agency below and verify the parcel’s jurisdiction before paying a fee or scheduling field work.

Responsible agency

Connecticut Office of the State Building Inspector; permits administered by municipal building departments in New London County

For a project in or near New London County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(860) 713-5900

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

450 Columbus Boulevard, Suite 1303, Hartford, CT 06103

Operating hours

Operating hours not verified

Review expectation

N/A; municipal timelines vary.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for New London County

Who handles permitting for this jurisdiction?

This record is marked Municipal Fallback. Confirm whether a city, state agency, or other local authority controls the parcel before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (860) 713-5900.

How long might review take?

N/A; municipal timelines vary.

How are inspections scheduled?

Contact the applicable municipal building department for inspections; municipal departments issue permits and conduct required inspections. OSBI/OSFM inspections require the state request form and 48 hours’ notice when those offices are the authorities having jurisdiction.

Which codes and exemptions should I review?

2022 Connecticut State Building Code, based on the 2021 IBC, IEBC, IPC, IMC, IRC, IECC, and ISPSC, 2020 NEC, and ICC A117.1-2017. The proposed 2026 code transition is delayed pending legislative approval. No countywide list; municipal building officials determine work exempt from permits. State modifications or exemptions may be requested through the local building official for practical difficulty or unnecessary hardship consistent with safety.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?