Who issues permits

No countywide building permit office was identified for Washington County. The listing points to Washington County Planning Commission. Inside city or town limits, the city or town issues building permits.

Local municipalities and their designated UCC building-code officials or certified third-party agencies issue building permits and conduct inspections.

Outside city limits in Pennsylvania

Each of Pennsylvania's 2,562 municipalities (cities, boroughs and townships) decides whether to enforce the UCC, and counties do not issue building permits. In a municipality that has opted in, you get permits from the municipal code office or the third-party agency it has hired.

Read more

In an opt-out municipality, a homeowner must hire an L&I-certified third-party agency for residential plan review and inspections (34 Pa. Code § 403.103). Non-residential projects there go to L&I. L&I keeps a list of every municipality's opt-in or opt-out status and a list of certified third-party agencies.

More Pennsylvania rules below · Confirm with the office at 724-228-6811 before you build.

How to get a permit in Washington County

  1. Find the office for your address: the city or town if you are inside its limits; outside them, the Pennsylvania rule above decides.
  2. Fill in the application from pa.gov and submit it as the form directs.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  5. Get the final approval and keep it with the approved plans and receipts.

Search Washington County permit records

No online permit portal is listed, so permit history is kept by Washington County Planning Commission. Call 724-228-6811 or visit Washington County Planning Commission, 95 W. Beau Street, Suite 115, Washington, PA 15301 with the property address or parcel number, and ask for the permits, inspection results and any certificate of occupancy on file. The same office can give the status of an application by its number.

Inside a city or town, permit records are kept by that municipality’s building department, not by Washington County.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Building codes and exemptions

Codes referenced

For 2026 work, Pennsylvania Uniform Construction Code (UCC), 34 Pa. Code Chapters 401-405, with the applicable 2021 International Code family and Pennsylvania amendments administered by the municipality or its certified UCC agency. Washington County does not publish a single countywide building-permit enforcement office.

Pennsylvania: statewide code based on the 2021 IBC. Details

Work that may not need a permit

No countywide minor/cosmetic exemption list was identified because building permits are issued through local municipalities or their code agencies. Confirm UCC exemptions and local zoning thresholds with the municipality. Pennsylvania UCC guidance allows emergency repairs or equipment replacements before a permit only when the application is submitted to the building code official within three business days; zoning or other approvals may still be required.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Contact the municipality where construction will occur to identify its Building Code Official or certified third-party agency, submit the UCC-3 application and plans, and schedule inspections. The county Planning Commission reviews subdivision and land-development applications; its written environmental-review response is generally issued within 30 days of a complete application and fee, separate from local building-permit review.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

The responsible municipality or UCC agency may issue notices of violation, stop-work or corrective-work orders, require retroactive plan review and inspections, deny occupancy, impose special or doubled fees where authorized, and pursue citations or other enforcement. Exact penalties are controlled by the local ordinance and UCC enforcement authority; the county planning office separately requires applicable land-development approvals before local final approval.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Not published online

We did not find these in the office’s online materials. Ask the office at 724-228-6811 about:

  • Fees: the current fee schedule and an estimate for your project. Not available countywide for building permits; local municipal or third-party UCC fee schedules apply
  • Review times: how long plan review currently takes. Not available countywide for building permits; local municipal and third-party review timelines vary. Washington County subdivision/land-development environmental review is generally answered in writing within 30 days, but this is not a building-permit approval timeline.

Pennsylvania rules that apply in Washington County

These rules come from Pennsylvania law and state agencies, so they apply in Washington County on top of anything the local office requires.

Building code

Statewide code

The UCC (34 Pa. Code Chapter 403) adopts the 2021 IBC, IRC, IMC, IPC, IFGC, IEBC, IECC and International Performance Code, with Pennsylvania changes. This triennial update was approved October 16, 2025, published November 8, 2025, and took effect January 1, 2026.

Read more

It replaced the 2018 codes, which had been in effect since February 14, 2022. A Commonwealth Court ruling keeps the 2018 accessibility requirements in force instead of the 2021 ones. Electrical work in one- and two-family homes follows the electrical chapters of the 2021 IRC. Other buildings follow the NFPA 70 (National Electrical Code) edition that the 2021 IBC references. Pennsylvania's version keeps 8¼-inch maximum stair risers and 9-inch minimum treads, and it does not require hard-wired interconnected smoke alarms when existing one- and two-family homes are altered, repaired or added to. Battery smoke alarms are required instead.

Pennsylvania Department of Labor & Industry, Bureau of Occupational and Industrial Safety (UCC Review and Advisory Council advises on code updates) ↗

Contractor and trade licensing

Pennsylvania has no state license for most construction contractors. Under the Home Improvement Consumer Protection Act (Act 132 of 2008), anyone who does home improvements for pay must register with the Attorney General's Bureau of Consumer Protection.

Read more

The act covers jobs over $500 at a private residence. Contractors whose home improvement work totaled less than $5,000 in the previous tax year are exempt. Registered contractors must carry liability insurance of at least $50,000 for personal injury, and municipalities may not require a separate home improvement contractor registration or license (Act 132 § 12). Building new homes is not 'home improvement' under the act. The act also excludes unpaid work an owner does on their own home or rental property. Under the UCC, the owner or an authorized agent applies for the permit (34 Pa. Code § 403.62), so homeowners may pull their own permits. State law sets no owner-occupancy or resale conditions.

Electrical, plumbing and HVAC

Pennsylvania does not license electricians, plumbers or HVAC contractors statewide. Some municipalities license home improvement, electrical or plumbing contractors themselves, and L&I keeps no records of those programs.

Read more

Act 132 lets testing-based local trade licenses that existed before the act stay in place. Municipalities in a county of the second class (Allegheny County) do not enforce the UCC's plumbing code. Plumbing there falls under the plumbing code adopted under the Local Health Administration Law (34 Pa. Code § 403.21(a)(6)). Electrical, plumbing and mechanical permits and inspections are part of the UCC and handled by the municipality or its third-party agency. In opt-out municipalities, the third-party agency the owner hires handles them.

State programs that can affect your permit

On-lot sewage (septic) permits under Act 537

Septic systems are not covered by the UCC (34 Pa. Code § 403.1(b)(7)). Permits come from the municipality's local agency, whose Sewage Enforcement Officer (SEO) does soil and percolation testing and approves or denies the permit. DEP oversees the program.

Official page: pa.gov ↗

Manufactured and industrialized housing

New HUD-labeled manufactured homes installed according to the manufacturer's design are not covered by the UCC. Site work the design doesn't cover, such as utility connections and grading, must meet the UCC. So must additions, later alterations, and work after the home is resold or moved (34 Pa. Code § 403.25).

Official page: pacodeandbulletin.gov ↗

Verified October 28, 2026 against Pennsylvania sources. Pennsylvania permit rules, sources and other counties

Common projects in Washington County

Pennsylvania has statewide rules on file for 4 of these projects; they apply in Washington County along with local permit requirements.

Guides for other projects: Roof replacement · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · Accessory dwelling units · Demolition · Plumbing work · All 21 project guides

Other permits you may need in Washington County

These are separate from the building permit and come from the agencies named, under Pennsylvania rules.

  • Septic system

    Local agency Sewage Enforcement Officer (DEP oversight)

    Under the Sewage Facilities Act (Act 537), on-lot septic permits are issued by the local agency (a municipality, joint municipal agency or county health department), which employs Sewage Enforcement Officers.

    Read more

    The site investigation includes soil profile evaluations within 10 feet of the proposed absorption area and, where soils allow, percolation tests (25 Pa. Code 73.14), and the local agency must issue or deny a conventional system permit within 7 days of a complete application (25 Pa. Code 72.25). A home may not be occupied until the system is finally inspected, approved and covered (25 Pa. Code 73.11).

    Official page: pa.gov ↗ · Septic permit guide

  • Floodplain development

    Pennsylvania Emergency Management Agency (PEMA)

    PEMA supports Pennsylvania communities in the National Flood Insurance Program with community assistance visits, mapping help, technical assistance and training. Municipalities adopt and enforce floodplain ordinances and issue floodplain development permits, and every flood-prone municipality must file an annual report with PEMA covering all development permits it issued.

    Official page: pa.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    PennDOT

    A PennDOT Highway Occupancy Permit (HOP) is required to build or change a driveway, road, drainage or utility facility connecting to a state highway, and also when work connects to a PennDOT drainage facility.

    Read more

    Applications go through the PennDOT district office and can be filed and tracked online in PennDOT's Electronic Permitting System (EPS). For township, borough or county roads, check with that local government.

    Official page: pa.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    PA DEP

    Under 25 Pa. Code Chapter 102, all earth disturbance must use erosion and sediment control BMPs, and a written Erosion and Sediment Control Plan is required once total earth disturbance reaches 5,000 square feet (25 Pa.

    Read more

    Code 102.4). Earth disturbance of 1 acre or more, including smaller work that is part of a larger common plan of development or sale of 1 acre or more, needs an individual NPDES permit or coverage under the PAG-02 general permit before work starts (25 Pa. Code 102.5).

    Official page: pa.gov ↗

  • Water well

    DCNR (driller licensing)

    Pennsylvania has construction standards for public water-supply wells but not for private water wells. Water well drilling companies must hold a DCNR driller license and rig permits and must submit each well's construction details to the state and the owner; farmers and homeowners drilling their own wells on their own or leased land are exempt from licensing.

    Official page: pa.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does Washington County have a countywide building permit office?

No, none was identified. For an address in a city or town, call that municipality's building department or city hall. For unincorporated land, Pennsylvania law decides whether a local permit is needed (see "Outside city limits" on this page), and state requirements such as electrical, plumbing, or septic rules can still apply.

Can I apply for a permit online in Washington County?

No online permit portal was found for this listing. The agency does publish application forms online, which may need to be submitted by mail or in person. Contact the office at 724-228-6811 to ask how applications are accepted.

How much does a building permit cost in Washington County?

Washington County Planning Commission has no fee schedule online, so the cost has to come from the office. Call the office at 724-228-6811 with the project type, size and estimated value for a quote. Inside a city or town, that municipality’s own fee schedule applies.

How do I look up past permits for an address in Washington County?

There is no online permit search for this listing. Ask the office at 724-228-6811 for the permit history of the address, or send a public records request; the assessor's property record also shows what has been built.

Can I check a contractor's license for work in Washington County?

Yes, at hicsearch.attorneygeneral.gov. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

What if my property is near the Washington County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Washington County borders Allegheny County, Beaver County, Fayette County, Greene County, Westmoreland County, Brooke County (West Virginia), and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Washington County.