Who issues permits

Anne Arundel County Department of Inspections and Permits is the county office listed for building permits in Anne Arundel County.

How to get a permit in Anne Arundel County

  1. Confirm the county covers your address. Properties inside a city with its own building department apply there.
  2. Apply online through the Accela Citizen Access portal at aca-prod.accela.com.
  3. Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
  4. Pay the permit fee set in the published fee schedule.
  5. Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
  6. Get the final approval and keep it with the approved plans and receipts.

Review times

Typical review for a non-residential tenant-improvement permit is approximately 10 business days for each submittal after acceptance; other permit timelines vary by project and agency reviews. The county's system help notes that manager review remaining for more than five business days should be referred to the Permit Center.

Search Anne Arundel County permit records

The listing’s online portal is at aca-prod.accela.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.

Older permits are often not online, and some portals only show applications you filed yourself. For those, ask Anne Arundel County Department of Inspections and Permits at 410-222-7730. To follow your own application, search for its permit or application number.

If the permit file is not online

  • Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
  • Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.

Permit fees

Anne Arundel County Department of Inspections and Permits publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.

Building codes and exemptions

Codes referenced

Current for 2026: 2021 International Building Code, 2021 International Residential Code, 2021 International Energy Conservation Code, 2021 International Existing Building Code, 2021 International Swimming Pool and Spa Code, 2020 National Electrical Code, 2021 International Fuel Gas Code, 2021 International Mechanical Code, and 2021 International Plumbing Code. The county's 2024 code package is effective June 23, 2024; 2024 NFPA 1 Uniform Fire Code and 2024 NFPA 101 Life Safety Code amendments under Bill 13-26 are effective May 25, 2026.

Maryland: statewide code based on the 2021 IRC and 2021 IBC. Details

Work that may not need a permit

The county's project guide identifies limited exemptions: ground-level residential patios generally do not require a building permit, though grading approval may be required; detached residential decks under 200 square feet and under 3 feet high may be exempt outside the Critical Area or Bog Contribution Drainage Area; replacing roof shingles only does not require a permit; replacing or reinstalling solar panels in kind does not require a building permit, but electrical authorization may be required; detached sheds or gazebos no larger than 150 square feet and no higher than 10 feet may be exempt outside the Critical Area; and residential pools require permits only when in-ground or above-ground over 36 inches. Fences, retaining walls, decks, additions, alterations, new structures, and most commercial work generally require permits, with location and scope controlling.

An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.

Scheduling inspections

Schedule and track inspections in the Land Use Navigator after the permit has been active for at least 24 hours. Approved drawings and grading plans must be onsite. Trade finals must be complete before the final building inspection; for commercial or tenant-improvement work, the Fire Marshal life-safety final must also pass first. If internet scheduling is unavailable, call 410-222-7784 and listen for the dispatcher Monday-Friday, 7:30 a.m.-4:00 p.m.; Building Inspections can be reached at 410-222-7790.

Zoning and land use

Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.

Open the planning or zoning reference ↗

Work without a permit

Anne Arundel County issues uniform civil citations to owners, contractors, and other responsible parties and may pursue abatement through legal proceedings. Published building-code penalties include $500/$1,000 for other construction without a permit, $1,000/$5,000/$10,000 for an unpermitted pier or bulkhead, $1,000 for violating a stop-work order, and $125/$500/$1,000 for other building-code violations. Separate grading, stormwater, and Critical Area penalties can reach $10,000.

Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.

Maryland rules that apply in Anne Arundel County

These rules come from Maryland law and state agencies, so they apply in Anne Arundel County on top of anything the local office requires.

Building code

Statewide code

Under COMAR 09.12.51, the MBPS is the 2021 International Building Code, the 2021 International Residential Code and the 2021 International Energy Conservation Code, with Maryland amendments. It has been effective since May 29, 2023, and each local jurisdiction had to start enforcing it by May 29, 2024.

Read more

The Standards apply to every building or structure for which a local jurisdiction receives a building permit application. Local governments may amend the Standards to suit local conditions, and a local amendment prevails where it conflicts. However, they may not weaken the energy conservation provisions, the automatic fire sprinkler provisions for townhouses and one- and two-family dwellings (with narrow statutory exceptions), or the wind design and wind-borne debris provisions. Each local amendment must be filed with the Department of Labor. Work on existing buildings follows the Maryland Building Rehabilitation Code (COMAR 09.12.58). Electrical installations must conform to the National Electrical Code or to the electrical code adopted by the county, so check with your county for the NEC edition it enforces. Code updates: the Department proposed adopting the 2024 IBC, IRC and IECC in the Maryland Register on June 26, 2026. It withdrew that proposal in its entirety, citing public comments and concerns about the energy provisions, and published the withdrawal notice on October 16, 2026. No 2024 adoption date has been set.

Maryland Department of Labor, Division of Labor and Industry, Building Codes Administration ↗

Outside city limits

Maryland's counties are the main building-permit authorities. Under Public Safety Article §12-505, the county where a building is located enforces the Standards, and that includes all unincorporated land. Baltimore City runs its own permit office.

Read more

A municipality that had its own building code by October 1, 1992 enforces the code itself unless it has arranged for the county to do it. A municipality that had no code by then may choose to take over enforcement, and otherwise the county handles permits inside its limits. In practice, people in many smaller towns get building permits from the county. Every jurisdiction must review plans, issue permits, inspect the work and issue use and occupancy certificates.

Contractor and trade licensing

Maryland has no state general contractor license for new construction or commercial work. Remodeling and repair work on existing homes requires a license from the Maryland Home Improvement Commission (MHIC). Under Business Regulation §8-101, 'home improvement' covers additions, alterations, remodeling, repair and replacement on a residence, and also work such as driveways, fences, decks, porches, swimming pools and residential shore erosion control.

Read more

It excludes construction of a new home, apartment buildings with four or more units, and the common areas of condominiums. Only MHIC-licensed contractors may sign home improvement contracts with homeowners. Licensed electricians, plumbers and HVACR contractors working within their own trade do not also need an MHIC license. A contract may not require more than one-third of the price as a deposit at signing. The MHIC Guaranty Fund can repay homeowners for actual losses caused by a licensed contractor, up to $30,000 per claim. Builders of new homes do not hold an MHIC license. Instead they must register with the Home Builder Registration Unit of the Attorney General's Consumer Protection Division under the Maryland Home Builder Registration Act. Builders who build only in Montgomery County are excluded from the state registration. The state does not regulate whether a homeowner can pull their own building permit. Your county or city sets those rules.

Electrical, plumbing and HVAC

Electricians, plumbers and gasfitters, and HVACR contractors are licensed by state boards in the Maryland Department of Labor. The State Board of Electricians licenses master, journeyperson and apprentice electricians.

Read more

Since July 1, 2021, local governments generally may not issue their own electrician licenses. Those that already licensed electricians, or that give the state exam, may keep a local registration, and counties still run electrical permits and inspections. Electrical homeowner permits, where offered, are a county matter. The State Board of Plumbing licenses plumbers and gasfitters, and state law lets a person do plumbing in their own residence without a license, but not the final connection to a public or private water or sewer system. In Montgomery and Prince George's counties, WSSC Water issues plumbing and gas permits and does the inspections. It limits what homeowners may do themselves, and gas appliance replacements there need a licensed gasfitter. The State Board of HVACR Contractors licenses heating and cooling work. Business Regulation §9A-103 lets a single-family homeowner do HVACR work on their own home personally, and lets a person building a single-family home they will live in do the HVACR work. Plumbing, mechanical and electrical permits are issued locally.

State programs that can affect your permit

Chesapeake Bay Critical Area

Land within 1,000 feet of the landward edge of tidal wetlands and the head of tide on the Chesapeake Bay and its tributaries is in the Critical Area, apart from locally approved exclusions. Each county or town runs a Critical Area program approved by the state Critical Area Commission. These programs control lot coverage, clearing and a protected shoreline buffer, and local jurisdictions may not issue permits that conflict with them. On waterfront property, expect an extra Critical Area review, and possibly mitigation plantings, before you get a permit for an addition, deck, shed or pool.

Official page: mgaleg.maryland.gov ↗

Industrialized (modular) buildings

Modular homes and other industrialized buildings are approved and inspected at the factory under COMAR 09.12.52. An approved testing facility applies the Maryland insignia, and the Department may make unannounced plant and site inspections. The owner or builder still gets a local building permit, and the local building department reviews the foundation and all site work. HUD-code manufactured homes are built to the federal HUD code, which preempts local construction codes for the home itself.

Official page: labor.maryland.gov ↗

Maryland Home Builder Registration

Anyone who builds new homes for consumers, including installers and retailers of mobile homes and residential industrialized buildings, must register with the Attorney General's Consumer Protection Division before contracting. Builders who build only in Montgomery County are the exception. Check registration before signing a contract for a new house.

Official page: mgaleg.maryland.gov ↗

Verified October 28, 2026 against Maryland sources. Maryland permit rules, sources and other counties

Common projects in Anne Arundel County

No Maryland-specific rules for these projects are on file here, so ask the permit office what each needs in Anne Arundel County.

Named in Anne Arundel County’s exemption summary (read it before assuming the work is exempt): Decks · Fences · Sheds and accessory buildings · Roof replacement · Electrical work · Rooftop solar · Pools and spas

Guides for other projects: Water heaters · Heating and air conditioning · Accessory dwelling units · Demolition · Plumbing work · Septic systems · Driveways and culverts · Floodplain development · All 21 project guides

Other permits you may need in Anne Arundel County

These are separate from the building permit and come from the agencies named, under Maryland rules.

  • Septic system

    Local health department (MDE Approving Authority)

    Under COMAR 26.04.02, no septic system may be built or altered without a permit from the Approving Authority, which is MDE or its designee, typically the local health department. No building permit may be issued until that permit is granted.

    Read more

    Site evaluations with percolation tests are required. New and replacement systems in the Chesapeake and Atlantic Coastal Bays Critical Areas must use nitrogen-removal technology (BAT).

    Official page: regs.maryland.gov ↗ · Septic permit guide

  • Floodplain development

    Maryland Department of the Environment (MDE)

    A state waterway construction permit from MDE is needed before work that changes a nontidal stream or its 100-year floodplain (COMAR 26.17.04.03). Under that chapter, building or substantially improving a home in a nontidal 100-year floodplain below the 100-year flood elevation may not be permitted (COMAR 26.17.04.11).

    Official page: regs.maryland.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide

  • Driveway and culvert

    Maryland State Highway Administration (SHA)

    A driveway onto a state highway needs an SHA Residential Entrance Permit from the SHA office for that county, and no work in the state right-of-way may start until it is issued (COMAR 11.04.06). The first access to a residential property has no engineering fee, a bond may be required, and any pipe under the entrance must be at least 18 inches and state-approved.

    Official page: regs.maryland.gov ↗ · Driveway and culvert guide

  • Erosion and sediment control

    Soil conservation district (MDE erosion and sediment control rules)

    Any grading needs an approved erosion and sediment control plan unless it disturbs less than 5,000 square feet and less than 100 cubic yards of earth (COMAR 26.17.01.05). Plans are approved by the county soil conservation district, and a grading or building permit may not be issued until the plan is approved (Environment Article §4-103).

    Official page: regs.maryland.gov ↗

  • Water well

    Local approving authority (MDE or its designee)

    A well may not be drilled until the Approving Authority, MDE or the local agency it designates, issues a well construction permit, and that permit may be issued only to a master well driller licensed by the State Board of Well Drillers (COMAR 26.04.04.05). A building permit cannot be issued until any required well permit is granted (COMAR 26.04.02.03).

    Official page: regs.maryland.gov ↗

Official resources

Check these agency pages for current information before you apply, pay a fee, or schedule work.

Common questions

Does the Anne Arundel County office handle addresses inside city limits?

Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 410-222-7730 if you are unsure.

Can I apply for a permit online in Anne Arundel County?

Yes. The listing includes an online permit portal at aca-prod.accela.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.

How much does a building permit cost in Anne Arundel County?

Anne Arundel County Department of Inspections and Permits publishes its fee schedule online (aacounty.org). Look up your project type there, and ask the office at 410-222-7730 for an estimate if your project is not listed.

How do I look up past permits for an address in Anne Arundel County?

Start with the Accela Citizen Access portal at aca-prod.accela.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 410-222-7730 for the file or send a public records request.

Can I check a contractor's license for work in Anne Arundel County?

Yes, at aacounty.org. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.

Which building code edition is cited for Anne Arundel County?

The published code information cites the 2021 International Residential Code and 2021 International Building Code. State and local amendments can change specific requirements, and adoptions change over time, so confirm the edition in force on your application date.

What if my property is near the Anne Arundel County line?

Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Anne Arundel County borders Baltimore City, Baltimore County, Calvert County, Howard County, Kent County, Prince George's County, and others.

Neighboring counties

If your property is near the county line, confirm which county it is in. These counties share a border with Anne Arundel County.