Who issues permits
City of Baltimore Department of Housing and Community Development is the county office listed for building permits in Baltimore City.
Also listed: Office of Permits and Building Inspections.
How to get a permit in Baltimore City
- Confirm the county covers your address. Properties inside a city with its own building department apply there.
- Apply online through the Accela Citizen Access portal at aca-prod.accela.com.
- Prepare plans and project details: site plan and drawings, the parcel number, project value and contractor information.
- Pay the permit fee set in the published fee schedule.
- Schedule inspections as described under Inspections, and keep work uncovered until each one passes.
- Get the final approval and keep it with the approved plans and receipts.
Review times
Most permit applications that do not require plans are issued in under one hour at the One Stop Shop; the city states that more than 98% of applications submitted with plans are reviewed in less than 30 days. Fast Track may be available for qualifying projects.
Search Baltimore City permit records
The listing’s online portal is at aca-prod.accela.com ↗ and runs on Accela Citizen Access. Open the Building (or Permits) tab and use its record search to look up permits by address, parcel or record number.
Older permits are often not online, and some portals only show applications you filed yourself. For those, ask City of Baltimore Department of Housing and Community Development at 443-984-1809. To follow your own application, search for its permit or application number.
If the permit file is not online
- Property records: the assessor’s record for the parcel usually lists its buildings, additions and year built, which shows what was built even where the permit file is thin.
- Public records request: a written request to the office that issued the permit can get permit files, approved plans and inspection reports that are not posted online.
Permit fees
City of Baltimore Department of Housing and Community Development publishes its fee schedule online. When reading it, check how construction value is calculated and whether plan review, trade permits and reinspections are billed separately.
Building codes and exemptions
Codes referenced
Baltimore City adopted the 2021 International Building Code and 2021 International Residential Code with City modifications. Related adopted standards include the 2020 National Electrical Code and 2021 International Fuel Gas, Mechanical, Plumbing, Property Maintenance, Fire, Energy Conservation, Green Construction, and Swimming Pool and Spa Codes, together with Maryland Building Performance Standards, accessibility, floodplain, preservation, and zoning requirements.
Maryland: statewide code based on the 2021 IRC and 2021 IBC. Details
Work that may not need a permit
The city code exempts, subject to all other laws and historic-preservation rules, interior painting, papering, tiling, carpeting, cabinets, countertops and similar interior finish work; minor drywall or plaster patching; replacing roof shingles or roof tarring; debris removal that is not demolition; boarding exterior openings with plywood; qualifying agricultural hoophouses without service systems; and other limited IRC/IBC exemptions. An exemption does not authorize code-violating work, and exterior or historic-district work may still require approval.
An exemption from a building permit does not remove zoning, floodplain, utility, fire, or other requirements.
Scheduling inspections
Schedule inspections through the E-Permits account or by searching the permit record, with the city's scheduling cutoff at 2:30 p.m. on the day before the requested date. All permits require inspections and a final inspection before a Certificate of Occupancy. Typical stages include footing, foundation, slab, framing, insulation, trade rough-in, and final; call Building Inspections at 410-396-3470, Fire at 410-396-5752/5753, or Health at 410-396-4544/4424 as applicable.
Zoning and land use
Setbacks, height, lot coverage and allowed uses come from the zoning rules for your parcel.
Open the planning or zoning reference ↗Work without a permit
Work begun or completed without a permit, beyond permit scope, contrary to approved plans, or during permit suspension/revocation requires a permit even after completion and incurs a penalty surcharge. The surcharge is generally the greater of $1,000 or 50% of the permit fee, in addition to other fines or penalties; the city may stop work, require correction or restoration, revoke permits, and place a lien for an unpaid surcharge.
Missing approvals can also surface when the property is sold, refinanced or insured, so keep the permit, inspection results and final sign-off.
Maryland rules that apply in Baltimore City
These rules come from Maryland law and state agencies, so they apply in Baltimore City on top of anything the local office requires.
Building code
Statewide code
Under COMAR 09.12.51, the MBPS is the 2021 International Building Code, the 2021 International Residential Code and the 2021 International Energy Conservation Code, with Maryland amendments. It has been effective since May 29, 2023, and each local jurisdiction had to start enforcing it by May 29, 2024.
Read more
The Standards apply to every building or structure for which a local jurisdiction receives a building permit application. Local governments may amend the Standards to suit local conditions, and a local amendment prevails where it conflicts. However, they may not weaken the energy conservation provisions, the automatic fire sprinkler provisions for townhouses and one- and two-family dwellings (with narrow statutory exceptions), or the wind design and wind-borne debris provisions. Each local amendment must be filed with the Department of Labor. Work on existing buildings follows the Maryland Building Rehabilitation Code (COMAR 09.12.58). Electrical installations must conform to the National Electrical Code or to the electrical code adopted by the county, so check with your county for the NEC edition it enforces. Code updates: the Department proposed adopting the 2024 IBC, IRC and IECC in the Maryland Register on June 26, 2026. It withdrew that proposal in its entirety, citing public comments and concerns about the energy provisions, and published the withdrawal notice on October 16, 2026. No 2024 adoption date has been set.
Maryland Department of Labor, Division of Labor and Industry, Building Codes Administration ↗
Outside city limits
Maryland's counties are the main building-permit authorities. Under Public Safety Article §12-505, the county where a building is located enforces the Standards, and that includes all unincorporated land. Baltimore City runs its own permit office.
Read more
A municipality that had its own building code by October 1, 1992 enforces the code itself unless it has arranged for the county to do it. A municipality that had no code by then may choose to take over enforcement, and otherwise the county handles permits inside its limits. In practice, people in many smaller towns get building permits from the county. Every jurisdiction must review plans, issue permits, inspect the work and issue use and occupancy certificates.
Contractor and trade licensing
Maryland has no state general contractor license for new construction or commercial work. Remodeling and repair work on existing homes requires a license from the Maryland Home Improvement Commission (MHIC). Under Business Regulation §8-101, 'home improvement' covers additions, alterations, remodeling, repair and replacement on a residence, and also work such as driveways, fences, decks, porches, swimming pools and residential shore erosion control.
Read more
It excludes construction of a new home, apartment buildings with four or more units, and the common areas of condominiums. Only MHIC-licensed contractors may sign home improvement contracts with homeowners. Licensed electricians, plumbers and HVACR contractors working within their own trade do not also need an MHIC license. A contract may not require more than one-third of the price as a deposit at signing. The MHIC Guaranty Fund can repay homeowners for actual losses caused by a licensed contractor, up to $30,000 per claim. Builders of new homes do not hold an MHIC license. Instead they must register with the Home Builder Registration Unit of the Attorney General's Consumer Protection Division under the Maryland Home Builder Registration Act. Builders who build only in Montgomery County are excluded from the state registration. The state does not regulate whether a homeowner can pull their own building permit. Your county or city sets those rules.
Electrical, plumbing and HVAC
Electricians, plumbers and gasfitters, and HVACR contractors are licensed by state boards in the Maryland Department of Labor. The State Board of Electricians licenses master, journeyperson and apprentice electricians.
Read more
Since July 1, 2021, local governments generally may not issue their own electrician licenses. Those that already licensed electricians, or that give the state exam, may keep a local registration, and counties still run electrical permits and inspections. Electrical homeowner permits, where offered, are a county matter. The State Board of Plumbing licenses plumbers and gasfitters, and state law lets a person do plumbing in their own residence without a license, but not the final connection to a public or private water or sewer system. In Montgomery and Prince George's counties, WSSC Water issues plumbing and gas permits and does the inspections. It limits what homeowners may do themselves, and gas appliance replacements there need a licensed gasfitter. The State Board of HVACR Contractors licenses heating and cooling work. Business Regulation §9A-103 lets a single-family homeowner do HVACR work on their own home personally, and lets a person building a single-family home they will live in do the HVACR work. Plumbing, mechanical and electrical permits are issued locally.
State programs that can affect your permit
Chesapeake Bay Critical Area
Land within 1,000 feet of the landward edge of tidal wetlands and the head of tide on the Chesapeake Bay and its tributaries is in the Critical Area, apart from locally approved exclusions. Each county or town runs a Critical Area program approved by the state Critical Area Commission. These programs control lot coverage, clearing and a protected shoreline buffer, and local jurisdictions may not issue permits that conflict with them. On waterfront property, expect an extra Critical Area review, and possibly mitigation plantings, before you get a permit for an addition, deck, shed or pool.
Industrialized (modular) buildings
Modular homes and other industrialized buildings are approved and inspected at the factory under COMAR 09.12.52. An approved testing facility applies the Maryland insignia, and the Department may make unannounced plant and site inspections. The owner or builder still gets a local building permit, and the local building department reviews the foundation and all site work. HUD-code manufactured homes are built to the federal HUD code, which preempts local construction codes for the home itself.
Maryland Home Builder Registration
Anyone who builds new homes for consumers, including installers and retailers of mobile homes and residential industrialized buildings, must register with the Attorney General's Consumer Protection Division before contracting. Builders who build only in Montgomery County are the exception. Check registration before signing a contract for a new house.
Verified October 28, 2026 against Maryland sources. Maryland permit rules, sources and other counties
Common projects in Baltimore City
No Maryland-specific rules for these projects are on file here, so ask the permit office what each needs in Baltimore City.
Named in Baltimore City’s exemption summary (read it before assuming the work is exempt): Roof replacement · Demolition
Guides for other projects: Decks · Fences · Sheds and accessory buildings · Water heaters · Heating and air conditioning · Electrical work · Rooftop solar · Pools and spas · All 21 project guides
Other permits you may need in Baltimore City
These are separate from the building permit and come from the agencies named, under Maryland rules.
Septic system
Local health department (MDE Approving Authority)
Under COMAR 26.04.02, no septic system may be built or altered without a permit from the Approving Authority, which is MDE or its designee, typically the local health department. No building permit may be issued until that permit is granted.
Read more
Site evaluations with percolation tests are required. New and replacement systems in the Chesapeake and Atlantic Coastal Bays Critical Areas must use nitrogen-removal technology (BAT).
Floodplain development
Maryland Department of the Environment (MDE)
A state waterway construction permit from MDE is needed before work that changes a nontidal stream or its 100-year floodplain (COMAR 26.17.04.03). Under that chapter, building or substantially improving a home in a nontidal 100-year floodplain below the 100-year flood elevation may not be permitted (COMAR 26.17.04.11).
Official page: regs.maryland.gov ↗ · FEMA flood map lookup ↗ · Floodplain permit guide
Driveway and culvert
Maryland State Highway Administration (SHA)
A driveway onto a state highway needs an SHA Residential Entrance Permit from the SHA office for that county, and no work in the state right-of-way may start until it is issued (COMAR 11.04.06). The first access to a residential property has no engineering fee, a bond may be required, and any pipe under the entrance must be at least 18 inches and state-approved.
Official page: regs.maryland.gov ↗ · Driveway and culvert guide
Erosion and sediment control
Soil conservation district (MDE erosion and sediment control rules)
Any grading needs an approved erosion and sediment control plan unless it disturbs less than 5,000 square feet and less than 100 cubic yards of earth (COMAR 26.17.01.05). Plans are approved by the county soil conservation district, and a grading or building permit may not be issued until the plan is approved (Environment Article §4-103).
Water well
Local approving authority (MDE or its designee)
A well may not be drilled until the Approving Authority, MDE or the local agency it designates, issues a well construction permit, and that permit may be issued only to a master well driller licensed by the State Board of Well Drillers (COMAR 26.04.04.05). A building permit cannot be issued until any required well permit is granted (COMAR 26.04.02.03).
Official resources
Check these agency pages for current information before you apply, pay a fee, or schedule work.
Common questions
Does the Baltimore City office handle addresses inside city limits?
Not always. This listing is a county-level office. In many places, incorporated cities and towns run their own building departments and the county covers only unincorporated areas. If your property is inside city or town limits, check with that city first, then contact the office at 443-984-1809 if you are unsure.
Can I apply for a permit online in Baltimore City?
Yes. The listing includes an online permit portal at aca-prod.accela.com. The agency also publishes a fee schedule online. Check that the portal accepts your address and project type before you pay a fee.
How much does a building permit cost in Baltimore City?
City of Baltimore Department of Housing and Community Development publishes its fee schedule online (codes.baltimorecity.gov). Look up your project type there, and ask the office at 443-984-1809 for an estimate if your project is not listed.
How do I look up past permits for an address in Baltimore City?
Start with the Accela Citizen Access portal at aca-prod.accela.com and search by address, parcel or permit number. If an older permit is not there, ask the office at 443-984-1809 for the file or send a public records request.
Can I check a contractor's license for work in Baltimore City?
Yes, at dllr.state.md.us. Search by business or individual name and check that the license is active and covers the type of work. Some trades are licensed by the state and others locally, so a missing result is worth a follow-up question rather than a conclusion.
What if my property is near the Baltimore City line?
Permits are issued by the jurisdiction where the parcel sits, not the nearest office. Check the county on your property tax bill or with the assessor. Baltimore City borders Anne Arundel County, Baltimore County.
Neighboring counties
If your property is near the county line, confirm which county it is in. These counties share a border with Baltimore City.
