County Permit SearchU.S. compliance directory
IllinoisKendall County

Administrative overview · FIPS 17093

Kendall County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Kendall County Planning, Building & Zoning Department, Building Division

For a project in or near Kendall County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

630-553-4141; inspections: KCinspections@KendallCountyIL.gov

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

504 South Main Street, Yorkville, IL 60560

Operating hours

Monday-Friday, 8:00 AM-4:30 PM

Review expectation

N/A for ordinary building permits; the county publishes a 10-30 day range for administrative zoning variances and typically 10 business days for some residential permit reviews, depending on completeness.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kendall County

Who handles permitting for this jurisdiction?

Kendall County Planning, Building & Zoning Department, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 630-553-4141; inspections: KCinspections@KendallCountyIL.gov.

How long might review take?

N/A for ordinary building permits; the county publishes a 10-30 day range for administrative zoning variances and typically 10 business days for some residential permit reviews, depending on completeness.

How are inspections scheduled?

Submit inspection requests by 4:00 PM at least one business day before the requested date to KCinspections@KendallCountyIL.gov. Windows are 7:00-11:00 AM and noon-4:00 PM, with no specific appointment time; inspection requests are not accepted by phone as the normal method.

Which codes and exemptions should I review?

Effective May 11, 2026: 2024 International Building Code; 2024 International Residential Code including Appendices BA, BB, and BE; 2023 National Electrical Code NFPA 70; Illinois Plumbing Code; 2024 International Mechanical Code; 2024 International Fuel Gas Code; 2024 International Existing Building Code; Illinois Energy Conservation Code; Illinois Accessibility Code; 2018 International Swimming Pool and Spa Code; and 2024 International Property Maintenance Code. The county checklist says no permit is currently required for fences outside the floodplain, shingle replacement without pitch/structural/truss/roofline changes, nonstructural siding, like-for-like windows or doors without changing opening size/framing, and underground sprinkler systems. Agricultural properties use an agriculture-exempt permit process; the exemption does not remove zoning/setback or other required approvals.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?