County Permit SearchU.S. compliance directory
IllinoisKankakee County

Administrative overview · FIPS 17091

Kankakee County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Kankakee County Planning Department, Building & Zoning Division

For a project in or near Kankakee County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

815-937-2940 (Building Division); 815-936-5500 (County Administration)

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

189 East Court Street, Room 201, Kankakee, IL 60901

Operating hours

Monday-Friday, 8:30 AM-4:30 PM; closed holidays; appointments recommended

Review expectation

N/A; the official county materials do not publish a standard plan-review timeline. Complete applications are reviewed by the Building & Zoning Division before issuance.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kankakee County

Who handles permitting for this jurisdiction?

Kankakee County Planning Department, Building & Zoning Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact 815-937-2940 (Building Division); 815-936-5500 (County Administration).

How long might review take?

N/A; the official county materials do not publish a standard plan-review timeline. Complete applications are reviewed by the Building & Zoning Division before issuance.

How are inspections scheduled?

The owner or contractor must contact the Building Division at 815-937-2940 to arrange inspections and comply with the applicable footing, framing, rough mechanical/electrical/plumbing, insulation, energy, and final requirements. Inspections and permits are handled for unincorporated county areas; floodplain projects require additional review and inspections.

Which codes and exemptions should I review?

The current county ordinance adopts the 2021 International Residential Code, 2021 International Building Code, 2021 International Mechanical Code, 2021 International Fuel Gas Code, 2021 International Property Maintenance Code, 2021 International Fire Code, 2021 International Swimming Pool and Spa Code, 2020 National Electrical Code, Illinois Plumbing Code, Illinois Accessibility Code, Illinois Elevator Safety Rules, and applicable Illinois life-safety and manufactured-housing statutes. The 2021 Illinois Energy Conservation Code applies under state law. The county publishes separate applications by project type rather than a single general exemption list. Its current residential application is specifically for houses, additions, garages, pole buildings, and accessory buildings larger than 200 square feet; other work is routed to separate deck, fence, maintenance, pool, demolition, electrical, or utility-shed applications. Confirm any minor/cosmetic exemption with the Building Division before work begins.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?