County Permit SearchU.S. compliance directory
CaliforniaKings County

Administrative overview · FIPS 06031

Kings County permit authority

The first compliance decision is jurisdictional: identify the office with statutory authority over your parcel, then use its filing and inspection sequence to keep the project moving.

Jurisdictional status

County

This county profile is the primary starting point for unincorporated-area permitting.

Responsible agency

Kings County Community Development Agency, Building Division

For a project in or near Kings County, this office is the identified point of contact for permit intake, statutory code enforcement, plan review coordination, and inspection release conditions. Confirm the parcel’s boundary and project type before relying on the county lane.

Direct contact

(559) 852-2670; Building Official (559) 852-2683; Building Inspector IV (559) 852-2681

Call before mobilizing if the project has a boundary, occupancy, fire, septic, or utility question.

Permit counter

Kings County Government Center, 1400 W. Lacey Blvd., Building 6, Hanford, CA 93230

Operating hours

Monday-Thursday 8:00 a.m.-5:00 p.m.; Friday 8:00 a.m.-12:00 p.m.

Review expectation

N/A; the county provides an online application pre-check and digital plan-submittal workflow but does not publish a standard building-permit review timeline.

Compliance workbench

Choose the next project decision.

Source trail

Official sources for this profile

Use these direct agency or licensing links to confirm current instructions before you file, pay, or schedule work. External pages control if their information differs from this directory.

Project questions

Frequently asked questions for Kings County

Who handles permitting for this jurisdiction?

Kings County Community Development Agency, Building Division is the identified county-level authority for this profile. Confirm that the property is in its service area before filing.

How should I begin an application?

Begin with the online permit gateway listed in the application guide. If the portal does not recognize the address or project type, contact (559) 852-2670; Building Official (559) 852-2683; Building Inspector IV (559) 852-2681.

How long might review take?

N/A; the county provides an online application pre-check and digital plan-submittal workflow but does not publish a standard building-permit review timeline.

How are inspections scheduled?

Registered users request building inspections through the Kings County Online Permits Center; the portal provides a dedicated Building Inspection Request function. The agency also directs applicants to email kcgc.building@co.kings.ca.us or call (559) 852-2670 for inspection status and results. The Building Inspector IV contact is (559) 852-2681.

Which codes and exemptions should I review?

The 2025 California Building Codes are required for all Kings County submittals beginning January 1, 2026. The county administers the California Building Code and related electrical, mechanical, and plumbing requirements through Kings County Code Chapter 5 and its local building regulations. The county's published shade-cloth guide recognizes qualifying temporary, readily removable, open-sided nursery or agricultural shade structures without permanent foundations, limited to permeable cloth, light framing, no plumbing/electrical/mechanical systems, a maximum 12-foot height, and a maximum 12,000-square-foot area; residential accessory use is limited to 120 square feet. County floodplain guidance also identifies patios and agricultural pole structures as exempt in specified flood-zone contexts. These exemptions do not override other county ordinances or required trade permits, and ordinary construction, additions, alterations, and regulated systems should be checked through the county's application pre-check.

Before contacting the permit counter

Have the project facts ready.

A productive call starts with a clear description of the property and proposed work. Keep the site address, parcel or assessor number, project valuation, existing occupancy, approximate square footage, structural scope, contractor information, and desired start date in front of you. Those facts help the Authority Having Jurisdiction route the question to building, planning, fire, environmental health, or another reviewing discipline.

Questions worth asking

  • • Is the parcel inside an incorporated city or county service area?
  • • Does this scope require building, trade, zoning, fire, or site permits?
  • • What plans and supporting documents make the submittal complete?
  • • How much lead time is needed for each inspection?